Step 1 - Install a moisture barrier/underlayment over the entire roof.
Underlayment can be applied directly over shin-
gles, or the existing roofing can be removed
to expose the plywood sheathing.
If applying over shingles, once the under-
layment is applied, install purlins or fur-
ring strips over the top of the underlay-
ment to use as screw points for the metal
roof.
American Roofing Products recommends a
synthetic felt underlayment.
American Roofing Products American Roofing Products American Roofing Products Basic Home Roof Installation Guide & Information
Step 2 - If desired, install fascia trim along the gable edges and/or the eaves.
Gab
le
Eave
Using liner panel screws or flat
roofing nails will keep the fas-
cia trim profile flat to the gable
or eave edges.
Fascia
Step 3 - Install drip edge over all the eaves of the roof.
Eave
Drip Edge
Drip edge will overlap
the fascia trim as
shown.
Use low profile screws
or flat roofing nails to
secure the drip edge to
the sheathing or
purlin.
Sidewall trim is installed
under lapped on the building’s siding.
The hemmed side is secured through a
flat area on the panel.
Butyl (tacky) tape is applied to seal the panel to the trim.
Step 4 - Install W valley trim where roof seams meet. W Valley
Install from the eave upward to the ridge, over-
lapping as necessary. Apply two rows of Solar
Seal or butyl tape to minimum 6” overlap ar-
eas.
Use valley seal tape to seal the space between
the W valley and the panel on top of it. Panel
should be 4” from the V in they valley. Screws
that secure both the valley trim and panel should
be placed behind the valley seal tap.
Step 5 - Begin to apply AmeriRib panels.
Ensure the initial panel is square before secur-
ing.
Install the roofing over the drip edge and val-
leys already installed.
See our previous diagram for proper screw
placement.
Ensure that chalk lines used to line up screws
holes are cleaned off the roof after installation.
Step 6 - Install sidewall trim. Sidewall
American Roofing Products American Roofing Products American Roofing Products Basic Home Roof Installation Guide & Information
Butyl Tape
Similar to sidewall, endwall trim is in-
stalled under lapped on the building’s
siding. The hemmed side will shed wa-
ter on the sloped roof. Outside closures
prevent blowback.
Longer screws are needed to attach, generally
2”. Secure the endwall near the hem, through the major ribs and outside closure and into
the sheathing or purlin.
Step 9 - Install ridge caps.
Gable/rake trim overlaps the metal on the
gable edges of the roof.
The top side overlaps the panel and butyl
(tacky) tape should be used to seal the gap.
Step 7 - Install end wall trim.
Endwall
Step 8 - Install gable/rake trim.
American Roofing Products American Roofing Products American Roofing Products Basic Home Roof Installation Guide & Information
Butyl Tape
Gable/Rake
Ridge caps are installed to seal the roof at
it’s peak.
Vented closures allow air to vent prop-
erly from ridge vents.
Longer screws are needed to attach ridge cap, generally 2”. Secure the ridge cap through the
flat near the hem, through the major ribs and vented closure and into the sheathing or purlin.
Outside
Closure
Ridge Cap
American Roofing Products American Roofing Products American Roofing Products Pole Barn Basic Installation Guide & Information
Ridge Caps
Inside Corner
Gambrel
Cannonball Track Cover Rat Guard/Base Guard Outside Corner
Gable/Rake
W Valley
Gable/Rake
Transition
J Channel
● Install underlayment—synthetic felt and/or house wrap.
● Attach rat guard/base guard to the base of the outside walls.
Level and secure the rat guard to the baseboard of the building.
AmeriRib panel should rest on the trim as shown.
● Windows and doors should be wrapped with J channel and drip
flashing. Note that drip flashing should only be used
above doors and windows. The exception to this is
cannonball track cover, which should replace drip
flashing over sliding doors.
Drip Edge
Drip Flashing
Z Flashing
Track
Cover
American Roofing Products American Roofing Products American Roofing Products Pole Barn Basic Installation Guide & Information
Ridge Caps
Inside Corner
Gambrel
Cannonball Track Cover Rat Guard/Base Guard Outside Corner
Gable/Rake
W Valley
Gable/Rake
Transition
J Channel
● Using shears, cut paneling to fit around windows and doors. Install side paneling. Ensure the first panel
on each wall is square before securing and adding additional panel. Use metal self tapping screws if apply-
ing to metal structure. The panel should rest/drain on the rat guard, on
top of drip flashing/cannonball track cover, and securely into the J
Channel.
● In addition to the above, for wainscoting or panel separation, use Z
Flashing to separate and properly flash between the panels.
● Inside building corners are sealed with inside corner trim pieces.
● Outside building corners are sealed with outside corner trim pieces.
.
Drip Edge
Drip Flashing
Z Flashing
American Roofing Products American Roofing Products American Roofing Products Pole Barn Basic Installation Guide & Information
Ridge Caps
Inside Corner
Gambrel
Cannonball Track Cover Rat Guard/Base Guard Outside Corner
Gable/Rake
W Valley
Gable/Rake
Transition
J Channel
● Larger doors can be trimmed out with Overhead Door Trim and Door Post Trim
● Install door hardware. Generally, the door assembly consists of
round track, a trolley that attaches to the door and rolls on the track,
latches, door stops, and side and bottom rails.
Drip Edge
Drip Flashing
Z Flashing
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Inst
all
ati
on
Ord
er C
hec
kli
st -
Pro
vide
to y
ou
r re
tail
er f
or
a f
ull
qu
ote
.
Me
tal C
olo
rP
csM
eta
l Typ
eFe
et
Inch
es
Pcs
Me
tal T
ype
Fee
tIn
che
s
4Ex
am
ple
- A
mer
iRib
29G
8
8
Trim
Co
lor
QTY
Trim
Stan
dar
d
Len
gth
Cu
sto
m
Len
gth
QTY
Trim
Stan
dar
d
Len
gth
Cu
sto
m
Len
gth
Rid
ge C
ap10
'6"
Dri
p F
lash
ing
10'3
"
Smal
l Ou
tsid
e C
orn
er
(3")
10'3
"Ea
ve M
ou
ldin
g10
'3"
Smal
l Ou
tsid
e C
orn
er
(3")
----
----
-Fa
scia
An
gle
10'3
"
Larg
e O
uts
ide
Co
rne
r (4
")10
'3"
Insi
de
Co
rne
r10
'3"
Larg
e O
uts
ide
Co
rne
r (4
")--
----
---
Wit
ch H
at10
'3"
Gab
le/R
ake
10'3
"G
amb
rel
10'3
"
Gab
le/R
ake
----
----
-So
ffit
/Fas
cia
Co
mb
o10
'3"
Ch
imn
ey
Flas
hin
g10
'3"
Z Fl
ash
ing
10'3
"
FJ T
rim
10'3
"
Tran
siti
on
10'3
"J
Ch
ann
el
10'3
"
W V
alle
y10
'3"
Rai
n G
uar
d A
ngl
e10
'3"
Dri
p E
dge
10'3
"N
atio
nal
Tra
ck C
ove
r10
'3"
Sid
e W
all
10'3
"D
oo
r P
ost
Tri
m10
'3"
End
Wal
l10
'3"
Ove
rhe
ad D
oo
r Tr
im10
'3"
Rat
Gu
ard
(B
ase
Gu
ard
)10
'3"
Can
no
n T
rack
Co
ver
10'3
"
Pan
el
3' c
ove
rag
e w
idth
per
pie
ce o
f p
an
el
TRIM
Ou
tsid
e C
orn
ers
& G
ab
le/R
ake
are
als
o a
vaila
ble
in:
12'
3', 1
4'3"
, 16'
3", 1
8'3"
an
d 2
0'3"
len
gth
s
Use
Cu
sto
m L
eng
th b
ox
Cu
sto
m T
rim
(d
esc
rib
e/u
se c
ust
om
tri
m w
ork
she
et)
:
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Am
eri
ca
n R
oo
fin
g P
rod
uc
ts
Inst
all
ati
on
Ord
er C
hec
kli
st -
Pro
vide
to y
ou
r re
tail
er f
or
a f
ull
qu
ote
.
Scre
w C
olo
rQ
TYSc
rew
sB
agQ
TYSc
rew
sB
ag
1" W
oo
d S
cre
ws
250/
Bag
3" W
oo
d S
cre
ws
250/
Bag
1.5"
Wo
od
Scr
ew
s25
0/B
ag1.
25"
Self
Tap
pin
g25
0/B
ag
2" W
oo
d S
cre
ws
250/
Bag
3/4"
Sti
tch
Scr
ew
250/
Bag
2" W
oo
d S
cre
ws
250/
Bag
Lin
er
Pan
el S
cre
w (
no
was
he
r)25
0/B
ag
Co
lor
QTY
Bo
ots
P
ipe
Siz
eTe
mp
*Q
TYB
oo
ts
Pip
e S
ize
Tem
p*
N/A
#1 R
etr
ofi
t¾
- 2
¾”
212/
275°
#7 B
oo
t 6
- 1
1"21
2/27
5°
#2 R
etr
ofi
t2-
7¼“
212/
275°
#7 H
eat
Bo
ot
6 -
11"
437/
500°
#3 B
oo
t¼
- 4
"21
2/27
5°#8
Bo
ot
7 -
13"
212/
275°
#4 H
eat
Bo
ot
3 -
6"43
7/50
0°#9
Bo
ot
10 -
18"
212/
275°
#5 B
oo
t4
- 7"
212/
275°
#9 H
eat
Bo
ot
10 -
18"
437/
500°
Spe
cial
Ord
er
Pip
e F
lash
ing
(siz
e/r
etr
o o
r st
and
ard
/re
gula
r o
r h
eat
):
Co
lor
QTY
Ite
mU
nit
Wh
ite
Co
nd
en
sto
p*
Lin
ear
Fo
ot
Sola
r Se
al (
cho
ose
co
lor)
Tub
e
Tou
ch U
p P
en
(ch
oo
se c
olo
r)Ea
ch
Tou
ch U
p S
pra
y (c
ho
ose
co
lor)
Each
Spra
y p
ain
t ca
n
Sno
w S
ho
es
(ch
oo
se c
olo
r)Ea
ch
N/A
Sno
w S
ho
es
Each
N/A
Bu
tyl (
Tack
y) T
ape
Ro
ll
N/A
Val
ley
Seal
Ro
ll
N/A
Insi
de
Clo
sure
Str
ipEa
ch
N/A
Ou
tsid
e C
losu
re S
trip
Each
N/A
Dri
-Ve
nt
Ve
nte
d C
losu
reEa
ch
N/A
Do
ub
le B
ub
ble
Ro
ll
N/A
Vin
yl B
ack
Insu
lati
on
Ro
ll
N/A
Re
x Sy
n U
nd
erl
aym
en
tR
oll
10 S
Q p
er
roll
Pre
miu
m s
ynth
eti
c fe
lt r
oo
f u
nd
erl
aym
en
t
4' o
r 6'
by
125'
ro
llR
efl
ect
ive
fo
il in
sula
tio
n d
esi
gne
d t
o r
efl
ect
he
at
6' b
y 10
0' r
oll
Stan
dar
d d
ep
th is
3"
thic
k, R
10 v
alu
e.
*Te
mp
is H
igh
Te
mp
Co
nti
nu
ou
s/In
term
itte
nt
AC
CES
SOR
IES
SCR
EWS
PIP
E FL
ASH
ING
Spe
cial
Ord
er
Scre
ws
(de
scri
be
/co
lor/
len
gth
/siz
e):
*Te
mp
is H
igh
Te
mp
Co
nti
nu
ou
s/In
term
itte
nt
Acr
ylic
Mo
de
lB
reak
s u
p s
lid
ing
sno
w t
o p
rote
ct t
rim
an
d g
utt
ers
De
scri
pti
on
Ap
pli
cati
on
Ap
pli
ed
to
Am
eri
Rib
Re
du
ces
con
de
nsa
tio
n &
dri
pp
ing
fro
m m
eta
l ro
ofs
10.3
ou
nce
tu
be
sM
eta
l ro
of
grad
e s
eal
ant
- co
lor
mat
che
d o
r cl
ear
Pe
nC
olo
r m
atch
ed
pai
nt
pe
n -
te
st c
olo
r o
n r
oo
f fi
rst
Co
lor
mat
che
d s
pra
y p
ain
t -
test
co
lor
on
ro
of
firs
t
Me
tal M
od
el
Bre
aks
up
sli
din
g sn
ow
to
pro
tect
tri
m a
nd
gu
tte
rs
3' in
len
gth
Seal
s th
e g
ap b
etw
ee
n t
rim
& t
he
un
de
rsid
e o
f p
ane
l
3' in
len
gth
Seal
s th
e g
ap b
etw
ee
n t
he
to
p o
f p
ane
l & t
rim
3' in
len
gth
Clo
sure
s th
at a
llo
w b
reat
hin
g fr
om
rid
ge v
en
ts
¾”
x 40
’ ro
llA
pp
lie
d t
o t
he
to
p o
f m
ajo
r ri
bs
to s
eal
tri
m la
id o
ver
1" x
1"
x 20
' ro
llSe
als
the
sp
ace
be
twe
en
W v
alle
y tr
im a
nd
pan
el