Bangkok | Mar-17 | Aleutia Scaling Village Energy Access

Post on 06-Apr-2017

39 views 0 download

Transcript of Bangkok | Mar-17 | Aleutia Scaling Village Energy Access

LITHIUM STORAGE CHANGES EVERYTHING

TECTONIC SHIFT IN OFF GRID ECONOMICS < $1 per Watt

Utility Scale

Typical Off Grid Projects

27kWp Off Grid School, Lagos

($50M for 5MWp across 183 sites)

http://bit.ly/2eLFvDo

SolarEnabler

w/ 3kWp Solar,

5kWh Battery,

Installation

$0.21 per kWh

LCOE

< $1.60 per Watt $10 per Watt

CHALLENGING ENVIRONMENTS

EACH ONE A PROJECT

EMR FOR 33 CLINICS IN OYO STATE NIGERIA

$8000 FILING CABINET

(AC) ELECTRICITY IS LIFE

WHO CERTIFIED

100L Vaccine Fridge

700 Wh per 24 Hours

SURGICAL LIGHTING

100 W

SUCTION APPARATUS

50 Watts

LED MICROSCOPY

Grid Tie Only

ECONOMICS OF SOLAR STORAGE

$120 100Ah 12V (1200Wh)

50% DoD, 450 Cycles

LEAD ACID BATTERY

$200 per kWh

$0.44 Lifetime

kWh Cost

$620 32Ah 51V (1630Wh)

90% DoD, 5000 Cycles

LG Chem Lithium Ion Battery

$422 per kWh

$0.08 Lifetime

kWh Cost

LITHIUM 5X

BETTER

SOLAR: FROM PROJECT TO PRODUCT

SolarEnabler: AFFORDABLE GENSET KILLER

IoT & BIG DATA ANALYTICS

LET‘S TALK ABOUT LCOE

SolarEnabler

w/ 3kWp Solar,

5kWh Battery,

Installation

$0.21 per kWh

LCOE

Retail: THB 2.2

($0.06) per kWh

Retail: £0.12

($0.14) per kWh

Generator

Fuel, Maintenance,

Depreciation

$0.60 per kWh

LCOE Kenya

$0.20 per kWh

DIESEL DISPLACEMENT FOR MSF

LOKICHOGGIO, KENYA

LOGISTICS HUB

$5 per Liter Diesel

Monthly Savings: $1800

Lifetime: $115K

Breakeven in 3 Months

0

5

10

15

20

25

30

35

40

chikafa clinic chirunya clinic mahuwe clinic masomo clinic masoka clinic musengezi clinic nyambudzi clinic

Oct to Dec 2015

100 Deliveries per Month, Mostly at Night “Candles are not appropriate to suture an episiotomy.” Hurungwe Rural Hospital , Zimbabwe

ZIMBABWE: CLINIC ELECTRIFICATION

THANK YOU Mike Rosenberg

Founder, Aleutia

aleutia.com aleutia.energy

mr@aleutia.com

SolarEnabler