Post on 19-Aug-2018
Long Beach Unified School District 1
Bancroft and Hoover Middle SchoolsConstruction
Bancroft and Hoover Middle School Construction Project: Gym Seismic Upgrades
Community Update June 11, 2014
Long Beach Unified School District 2
Bancroft and Hoover Middle SchoolsConstruction
TEAM MEMBERS
Meet the Team
• Tova K. Corman – Executive Director, Facilities, Development & Planning
• Tom Rizzuti – Administrative Coordinator• Tracy Nishihira – Project Manager• Tim Smallwood - LPA, Inc.• Jenae Benner – Bernards - Construction Manager
Long Beach Unified School District 3
Bancroft and Hoover Middle SchoolsConstruction
Project Goals
• Seismic retrofit • Restroom and shower upgrades• New bleachers, lockers, doors and hardware, and
signage• Upgrade of existing fire alarm system and
emergency lighting• Upgrade of existing plumbing systems• New ceilings and painting of exterior and interior
throughout (existing graphics to be protected in place)
• New floor finishes. (Existing wood flooring to be protected in place)
• Hazardous materials abatement• Exterior walkways and parking lot improvements • Campus directional signage and assistive listening
system• Demolition of portable building 900 at Hoover
Middle School
PROJECT GOALS & OBJECTIVES
Bancroft MS
Hoover MS
Long Beach Unified School District 6
Bancroft and Hoover Middle SchoolsConstruction
Bancroft Middle School - Site Plan
Long Beach Unified School District 7
Bancroft and Hoover Middle SchoolsConstruction
Bancroft MS – Temporary Facilities
Long Beach Unified School District 8
Bancroft and Hoover Middle SchoolsConstruction
Hoover Middle School - Site Plan
Long Beach Unified School District 9
Bancroft and Hoover Middle SchoolsConstruction
Hoover MS – Temporary Facilities
Long Beach Unified School District 10
Bancroft and Hoover Middle SchoolsConstruction
Bancroft MS - Logistics Site PlanContractor/Project Inspector Trailer & Construction Mgr/District TrailerExisting School Fencing
New Construction Fencing
Construction Entrance
Laydown Area
Contractor Parking
Student Entrance to Play Yard
Long Beach Unified School District 11
Bancroft and Hoover Middle SchoolsConstruction
Hoover MS - Logistics Site Plan
Contractor Trailer & Project Inspector Trailer
Existing School Fencing New Construction Fencing
Construction Entrance Laydown Area
Contractor Parking
Long Beach Unified School District 12
Bancroft and Hoover Middle SchoolsConstruction
Bancroft MS - Delivery Route & Signage
Long Beach Unified School District 13
Bancroft and Hoover Middle SchoolsConstruction
Hoover MS – Delivery Route & Signage
Long Beach Unified School District 14
Bancroft and Hoover Middle SchoolsConstruction
Construction Safety and Logistics• District site supervision• Full time on site Construction Management firm• Monitor and control construction traffic • Hours of operation are: Monday – Friday: 7:00 am – 7:00 pm; Saturday:
9:00 am – 6:00 pm• Install fencing and barricades to separate construction from the students,
staff, and community• Keep site and surrounding areas clean of construction debris and dust
control• Implement continuous safety training of construction personnel• Maintain open communication with the community
Equipment you may see: Trucks hauling in and out, back hoes, cranes, various equipment/machinery, and water trucks
CONSTRUCTION SAFETY & LOGISTICS