BALLISTICS TEST REPORT

Post on 28-Feb-2022

6 views 0 download

Transcript of BALLISTICS TEST REPORT

BALLISTICS PERFORMANCE TEST REPORT

Rendered to:

CR LAURENCE CO., INC.

SERIES/MODEL: BR1G600 PRODUCT: Storefront Window Assembly

Summary of Results

Title

Ballistic Resistance Test Method UL-752

Ballistic Resistance Level/Class Level 1/Level 3

Ballistic Resistance Test Results Pass

Report No.: G7823.01-119-12 Test Dates: 02/17/17 Report Date: 06/12/17 Test Record Retention Date: 02/17/21 Revision 1: 06/14/17

Reference should be made to Intertek-ATI Report No. G7823.01-119-12 for complete test specimen description and data.

130 Derry CourtYork, PA 17406

p. 717.764.7700f. 717.764.4129

www.archtest.com www.intertek.com/building

BALLISTICS PERFORMANCE TEST REPORT

Rendered to:

CR LAURENCE CO., INC. 2503 East Vernon Avenue

Los Angeles, CA 90058

Report No.: G7823.01-119-12 Test Dates: 02/17/17 Report Date: 06/12/17 Test Record Retention Date: 02/17/21 Revision 1: 06/14/17 Series/Model: BR1G600 Product: Storefront Window Assembly Project Summary: Architectural Testing, Inc., an Intertek company ("Intertek-ATI") in York, Pennsylvania, was contracted by CR Laurence Co., Inc. to perform ballistics resistance testing on storefront window assembly. Test Procedure: The test specimen was evaluated in general accordance with:

UL-752, Bullet-Resisting Equipment, Underwriters Laboratories, Inc., Eleventh Edition, September 2005 (Revised December 2006)

Qualifications: Intertek-ATI in York, Pennsylvania has demonstrated compliance with ISO/IEC International Standard 17025 and is consequently accredited as a Testing Laboratory (TL-144) by International Accreditation Service, Inc. (IAS). Intertek-ATI is accredited to perform all testing reported herein. Test Specimen Source: The test specimen was provided by the client in good condition. Representative samples of the test specimens will be retained by Intertek-ATI for a minimum of four years from the test completion date. Limitations: It is our understanding from CR Laurence Co., Inc. that the acrylic and polycarbonate glazing was previously evaluated for UL 752, Level 1 and Level 3, respectively; therefore, the laminated glazing was not part of this evaluation and only the frame was shot.

130 Derry CourtYork, PA 17406

p. 717.764.7700f. 717.764.4129

www.archtest.com www.intertek.com/building

G7823.01-119-12 Page 2 of 5

Revision 1: 06/14/17

Firearm/Ammunition:

Test Ammunition: Level 1: 9mm, 124 grain, full metal copper jacket with lead core Level 3: .44 Magnum, 240 grain, lead semi-wadcutter gas checked

Test Specimen Description:

Product Type: BR1G600 Storefront Window Assembly

Overall Size: 62-1/2" wide by 120" high

Top Fixed Day Lite Opening: 57-1/2" wide by 79" high

Bottom Fixed Day Lite Opening: 57-1/2" wide by 32-7/8" high

Frame Construction: See Drawings in Appendix B

Glazing Description: Level 1: 1-1/4" Acrylic

Level 3: 1-1/4" Polycarbonate Installation: The specimen was installed into a Spruce-Pine-Fir wood buck. Conditions of Testing: Ambient laboratory temperatures were in the range of 68 ±4°F for the duration of all testing reported herein. Test Set-up: The sample was rigidly mounted for ballistics resistance testing. The muzzle of the test firearms were set at 15 feet from the sample at zero degree obliquity. Oehler Model 57 infrared ballistic screens were set at 5 feet and at 10 feet from the muzzle of the firearm. Per UL-752, Section 17.1.2, a 1/8" thick cardboard indicator was positioned 18" from the protected side of the specimen. Test ammunition was reloaded to conform to UL-752, Table 3.1 requirements.

G7823.01-119-12 Page 3 of 5

Revision 1: 06/14/17

Shot Locations: See Shot Location Drawing in Appendix C. Test Results: The results are tabulated as follows:

Storefront Window - Level 1

Shot No. Shot Locations Temp.

(°F) Velocity

(fps) Results Pass/Fail

1 Jamb- Center 72 1264

No penetration or spalling.

P

2 Jamb/Sill Seam 72 1215 P

3 Sill 71 1239 P

4 Jamb- Edge 69 1281 P

5 Jamb/Intermediate

Rail Seam 69 1249 P

6 Intermediate Rail 69 1255 P

Storefront Window - Level 3

Shot No. Shot Locations Temp.

(°F) Velocity

(fps) Results Pass/Fail

1 Intermediate Rail 71 1435

No penetration or spalling.

P

2 Jamb/Intermediate

Rail Seam 69 1427 P

3 Jamb- Edge 69 1457 P

4 Jamb 72 -- 1 P

5 Jamb/Sill Seam 72 1455 P

6 Sill 72 1448 P 1 Equipment malfunction - ballistic screen error, no velocity recorded.

Both Level 1 and Level 3 ballistic testing utilized the same specimen. List of Official Observers:

Name Company

Isaiah Gebhart Intertek-ATI Travis Hoover Intertek-ATI

G7823.01-119-12 Page 4 of 5

Revision 1: 06/14/17

Intertek-ATI will service this report for the entire test record retention period. Test records that are retained such as detailed drawings, datasheets, representative samples of test specimens, or other pertinent project documentation will be retained by Intertek-ATI for the entire test record retention period. Results obtained are tested values and were secured using the designated test methods. This report does not constitute certification of this product nor an opinion or endorsement by this laboratory. It is the exclusive property of the client so named herein and relates only to the specimens tested. This report may not be reproduced, except in full, without the written approval of Intertek-ATI. For INTERTEK-ATI: Isaiah W. Gebhart Travis A. Hoover Technician II Program Manager IWG:tah/aaa Attachments (pages): This report is complete only when all attachments listed are included. Appendix A - Photographs (6) Appendix B - Drawings (5) Appendix C - Shot Location Drawing (1)

G7823.01-119-12 Page 5 of 5

Revision 1: 06/14/17

Revision Log

Rev. # Date Page(s) Revision(s)

0 06/12/17 N/A Original report issue

1 06/14/17 1,2 Limitations and Glazing Description updated to include acrylic and polycarbonate glazing

This report produced from controlled document template ATI 00469, revised 12/19/16.

G7823.01-119-12-R1

APPENDIX A

Photographs

G7823.01-119-12-R1

Photo No. 1 Pre-Test Exterior

Photo No. 2 Post-Test Exterior (Level 1 - Shot Nos. 1-3)

G7823.01-119-12-R1

Photo No. 3 Post-Test Exterior (Level 1 - Shot No. 4)

Photo No. 4 Post-Test Exterior (Level 1 - Shot No. 5)

G7823.01-119-12-R1

Photo No. 5 Post-Test Exterior (Level 1 - Shot No. 6)

Photo No. 6 Post-Test Exterior (Level 3 - Shot No. 1)

G7823.01-119-12-R1

Photo No. 7 Post-Test Exterior (Level 3 - Shot No. 2)

Photo No. 8 Post-Test Exterior (Level 3 - Shot No. 3)

G7823.01-119-12-R1

Photo No. 9 Post-Test Exterior (Level 3 - Shot Nos. 4 and 5)

Photo No. 10 Post-Test Exterior (Level 3 - Shot No. 6)

G7823.01-119-12-R1

Photo No. 11 Witness Panel - After Level 1 and Level 3 Ballistic Testing

G7823.01-119-12-R1

APPENDIX B

Drawings

G7823.01-119-12-R1

APPENDIX C

Shot Location Drawing