Audited Project Financial Statements · Mr. Abdul Rasheed Mughal *Project Director Line Mr Fazal...

Post on 18-Jul-2020

8 views 0 download

Transcript of Audited Project Financial Statements · Mr. Abdul Rasheed Mughal *Project Director Line Mr Fazal...

Audited Project Financial Statements

The audited project financial statements are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Access to Information Policy and as agreed between ADB and the Sindh Mass Transit Authority.

Project Number: 47279-003 Loan Number: 6008 Period covered: 1 July 2018 to 30 June 2019

PAK: Karachi Bus Rapid Transit Project – Project Design Advance

Prepared by Sindh Mass Transit Authority

For the Asian Development Bank Date accepted by ADB: 3 February 2020