Atrium and Bubble

Post on 10-May-2015

1.171 views 5 download

Tags:

Transcript of Atrium and Bubble

Brickyard Bubble with Insulation July 15, 2010

The Bubble was designed to Blend Well with Brickyard July 15, 2010

Crews Working Diligently July 15, 2010

The Bubble Seats 250 July 15, 2010

The Left Side Currently Undergoing Heavy Construction July 15, 2010

The Left Side will Feature the New Concepts July 15, 2010

Heavy Construction July 15, 2010

New Carpet in Temporary Serving Area July 15, 2010

New Serving Line for Faster Service July 15, 2010

Chick-fil-A and a Wrap Bar will be Served on the Line July 15, 2010

Li’l Dinos will be Served Here July 15, 2010

Students will Check Out Here July 15, 2010