Board Update – September 23, 2019

Assessment, Engagement, Masterplanning, and

Capital Improvements Plan

LEWISVILLE AREA MASTERPLANNING

OVERALL EXISTING CAMPUS

DRAFT

New Outdoor Baseball/Softball Toilets

New Baseball Fieldhouse

New Baseball Batting CageNew HOME SIDE Facilities

New Softball Batting Cage

New Team Rooms

New Entry & Ticketing

Expanded Drive and Parking

Expanded Parking

New Service Drive

New District-wide Performing Arts Center

New Classroom Addition

New Addition

LEWISVILLE AREA MASTERPLANNING

Lewisville Elementary School- Add (4) New Classrooms. New Classrooms

accommodate +85 additional students.- Relocate 5th Grade on the Lewisville ES campus.- Site Improvements for Access, Parking, and

Emergency Service Circulation

Lewisville High School- Classroom Additions, Kitchen/Dining Addition.- New Car Pick-up/Drop-off Loop. Additional Parking.- New Visitor Toilets, Team Rooms, Entry and Ticketing

areas at the LHS Stadium- New Fieldhouses, toilets, and batting cages at the

Baseball/Softball fields.

District-wide PAC at Lewisville HS- 1,000-seat theater with fly loft. Include rooms for

Drama, Costume Storage, Scenery, Performer Dressing, and Storage

OVERALL CAMPUS MASTERPLAN

MAIN ENTRY

RECPT.

MEDIA CENTER

Cla

ssro

om

Win

g

Student Pick-up Drop-off

KITCHEN

ROTC

OVERALL EXISTING FLOOR PLAN

EVENT ENTRY

Existing Condition Considerations:- LHS campus is in the best condition of the three high

schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed

MAIN ENTRY

EVENT ENTRY

Class Class

Class

Class

Teacher WkRm

Security Vestibule

RECPT.

MEDIA CENTER

Cla

ssro

om

Win

g

Student Pick-up Drop-off Canopy

Outdoor Courts and CTE Work Area

OVERALL FLOOR PLAN

Existing Condition Considerations:- LHS campus is in the best condition of the three high

schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed

New Drive and Parking

New

Faç

ade

Academic Storage

Enlarge and Add Toilets

Security Fencing

Additions and Renovations- New Student Dining with Seating for up to

500 students. New Kitchen.- (6) New Classrooms and Additional Storage.- Convert existing Kitchen and Cafeteria into

(4) New Classrooms, Teacher Work Rooms, Staff Toilets, and Academic Storage.

- Increase Student Enrollment: New Classrooms accommodate +165 additional students (a +40% increase in possible school enrollment).

- Relocate ROTC Program inside of school. Remove Portable Classrooms.

- Add New Secure Entry and “New Look”- Add Covered Entries at Bus and Car Pick-

up/Drop-off Areas

Upgrades and Maintenance- New Interior Finishes (ie. Remove carpet, new flooring,

new paint, etc.)- Correct Damaged Roofing (Leaks) and Complete

Reroofing Project- Upgrade and Reconfigure Reception Area- Add and Improve Landscaping at the school perimeter

EXISTING FRONT DOOR

NEW FRONT ENTRY

NEW FRONT ENTRY

NEW STUDENT PICK-UP/DROP-OFF