APTS-PHILEAS: Clean- HighTech PT-system. Phileas 18 m Fuel Cell Vehicles. VDL is a consortium of companies. 20 companies belong to the VDL Bus & Coach group Production in 2010:1,800 coaches & buses Turnover $ 600 million. VDL in the year 2010 79 companies Turnover $ 1,9 billion - PowerPoint PPT Presentation

Transcript of APTS-PHILEAS: Clean- HighTech PT-system

1

J os J ansen Advanced Public Transport Systems

APTA 2011 - 5 October ‘11

Phileas 18 m Fuel Cell Vehicles

2

VDL is a consortium of companies

VDL in the year 2010• 79 companies• Turnover $ 1,9 billion• 16 countries• Export 70%• 9 million sq ft production area• 7,400 employees

22 april 2023 General presentation VDL Groep2

20 companies belong to the VDL Bus & Coach group

• Production in 2010: 1,800 coaches & buses• Turnover $ 600 million

3

Phileas has been developed as an affordable alternative for tram systems (SIL 2 and SIL 4 level)

Available versions of the Phileas vehicle• Length: 60’, 80’ and 85’

• Hybrid propulsion versions– Parallel hybrid diesel (Allison)– Serial Hybrid fuel cell (Ballard / Vossloh Kiepe)– Serial Hybrid trolley (Vossloh Kiepe)– Primove Induction 80‘ (Bombardier)

4

5

6

Why Phileas platform for the H2 buses of Amsterdam and Cologne?

Innovative and futuristic design

Light weight body construction (sandwich panels); lifetime > 20 year

All wheel steering

Flexibility in design; interior, exterior and system lay-out

Independent wheel suspension

Large capacity 18m (up to 140 passengers)

Maximum weight 27,000 kg

7

Specification Phileas H2 for GVB & RVK

First 18 m Fuel Cell vehicle in the world!

8

System lay-out of the Phileas

9

GVB Amsterdam: • 2 buses from 15 Aug.’11• Testing phase on the line

RVK Cologne: • 2 buses from 1 June ’11• Testing phase completed• Driving in service

10

Future feasibility of fuel cell projects

• Price fuel cell and hybrid system should go down

• Life time has to raise; 12,000 hours means approximately $ 2,00/km; incl. hybrid $ 3.50/km. This will never affordable to the operators.

• Lot of improvements made last years in size, costs, weight, etc. Still not enough! Maybe technology should be improved.

• Very poor infrastructure of fuelling stations for H2.

• We are running out of time! Battery developments will catch up with H2 rapidly.

11

Phileas Phileas The beginning of The beginning of

the end of iron rail the end of iron rail in city transportin city transport

Thank you foryour attention!