April 12, 2018 Robert Rodgers - C.E. Manager 2 TDOT Region ... · 18/12/2004  · S.R. 317 BONNY...

Post on 10-Oct-2020

1 views 0 download

Transcript of April 12, 2018 Robert Rodgers - C.E. Manager 2 TDOT Region ... · 18/12/2004  · S.R. 317 BONNY...

April 12, 2018 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development

• To provide the public with up-to-date information on the proposed project.

• To display the ROW Plans for

SR-17 (Bonny Oaks Drive) from near Adamson Circle to West of Bonnyshire Dr.

• To solicit comments and concerns from the public regarding this project.

• To create a consistent five lane roadway along Bonny Oaks Drive.

• To provide additional lanes for safe traffic operations.

• Improve major Intersections along Bonny Oaks Drive.

• To improve the connectivity between I-75 and SR 153.

BEGIN CORRIDOR

END CORRIDOR

END PROJECT

BEGIN PROJECT

This project is

currently in the

design phase

Design

Planning

Environmental

Right-of-Way

Construction

Representatives from TDOT are present to answer your questions regarding:

• General project limits

• Major design elements

What you can do to help us get your input:

• Oral Comments - Court Reporter

• Written Comments - Comment Cards

• Mail-in Comments - (Within 21 days)

Thank you for your attendance and participation in the

Public Meeting