Post on 30-Jul-2020
ecocompSUSTAINABLE OUTDOOR PRODUCT RANGE
ecoproducts
APR | eco products
EngineeringProject BrochureDesign | Engineer | Manufacture | Construct
Company Profile
For further information please contact:
APR
Lot 9, 500 Churchill Road
Kilburn, South Australia 5084
T: +61 8 8359 4999
E: sales@a-p-r.com.au
www.a-p-r.com.au
Contents
Boardwalks ...................................... 2
Swale Bridges ................................. 4
Viewing Platforms .......................... 8
Professional Support Partners:
© APR | ABN 75 858 453 725
Front Cover: Swale Bridge, St Ignatius College, South Australia;
Boardwalk, San Remo, Victoria; Boardwalk, Port Wakefield, South Australia.
Back Cover: Parkland Footbridge, Adelaide, South Australia.
APR is a leading Australian designer and manufacturer of
wood plastic composite (WPC) products suited to a wide
range of industries within both local and international
markets.
The family owned business has invested significantly in
research and development, integrating reclaimed and
recycled plastics and wood using the latest technologies.
APR prides itself in delivering quality products for
individual residential sales or larger industry projects
such as Public Infrastructure, Parks and Gardens, Rail,
Marine and Transport.
APR manufactures to world standards and delivers
solutions which are leading edge, without compromise
in quality, all at an affordable price. With the ability
for clients to order to length, wastage is minimised; in
keeping with APR’s responsible approach to utilising
resources efficiently.
APR aligns with professional support partners, to ensure
a full range of services are available to fulfill turn-key
project requirements.
Services include, conceptual design consultancy,
engineering and design development, custom
manufacturing and assembly as well as onsite
commissioning during the early stages of your project.
With around the clock manufacturing capabilities, APR
has the superior ability to fulfill customer requirements.
To find more about how clients are utilising APR’s product
range, please visit www.a-p-r.com.au.
BoardwalksWPC boardwalks designed, engineered and manufactured in Australia by APR provide the perfect long term and environmentally sound solution for any application.
APR boardwalks are non-toxic and will not rot or splinter, making them ideal for coastal and marine environments.
On request, APR can provide a fully integrated design to meet your requirements. All posts, bearers, joists and decking can be supplied to ensure the project meets the highest standards for design and construction.
Page 2 | ENGINEERING PROJECTS | Design | Engineer | Manufacture | Construct
San Remo, Victoria
Margaret River, Western AustraliaPort Vincent, South Australia
Margaret River, Western Australia Robe, South Australia
Page 3
PRELIMINARYNOT FOR CONSTRUCTION
THIRD ANGLEPROJECTION
1955PILE CTS.
400
2090 WALKWAY(2000 TWO POSTS)
320
100
0
TO E
NG
INEE
RSSP
ECIF
ICA
TION
S
2330 OVERALL
50
MIN
.
E
HG
F1926
2000 TYP.SPAN
12125 OVERALL 489 TYP.
A B
K
C
GROUND PROFILE SHOWN FORILLUSTRATION ONLY
[5]TYPICAL GAP 190
DETAIL ASCALE 1 : 10
17
121324
2525
3
24
125 40
40 35
100
TYP
. 140
140
70
DETAIL ESCALE 1 : 10
27
8
24
144 25 TYP.
1
25
16
12
2425
25 3
6
DETAIL HSCALE 1 : 10
21
24
24
23
23
22
2218
4
17
200
6
0 TY
P.
60 TYP.
60
TYP.
85
DETAIL GSCALE 1 : 10
6
3
17 25
25
25
2323
[2.5]TYPICAL GAP
18
455
355
2
55
200
DETAIL FSCALE 1 : 10
21
2
25
25
18
6
17
4
22
22
22
25
1
20[2]
TYPICAL GAP
25 TYP.
DETAIL BSCALE 1 : 10
13
16
2424
25
25
2424
6
12
[2]TYPICAL GAP
35 TYP.
100
TYP
.
25 TYP.
DETAIL KSCALE 1 : 10
24
10
2515
2
31
78
DETAIL CSCALE 1 : 10
3
24
24
24
17
12
NOTES:1. COMPONENTS AND FIXINGS TO BE USED STRICTLY IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND RECOMMENDATIONS2. BOLTED CONNECTIONS TO USE APPROVED STRUCTURAL FASTENERS.3. INSTALLATION TO BE CONDUCTED IN CONSULTATION WITH LOCAL AUTHORITIES AND ADHERE TO RELEVANT AUSTRALIAN STANDARDS.4. PILES SHALL BE INSTALLED BY APPROVED CONTRACTOR.5. GROUND TO BE COMPACTED, ENGINEERED, CONTROLLED FILL.5. DEPTH, SIZE AND CAPACITY OF FOOTINGS TO BE PROVIDED BY A CERTIFIED CIVIL CONTRACT ENGINEER.ISSUE DESCRIPTION DRAWN DATE APPROVED DATE
D 3rd SHEET ADDED FOR BOM BRE 30/11/2015C UPDATES TO MARKUPS BRE 24/11/2015B CORRECTIONS TO MARKUPS BRE 17/11/2015
D
E
F
C
1 2 3 4
B
A
321 5
C
D
4 6 7 8
A
B
SHEET 1 OF 3
SCALE: 1:50
PART No.
APPROVED:
MATERIAL:
DIMENSIONAL TOL. U.N.O 10mm
5
E
APR-STD-BWK-02000BOARDWALK TYPICAL DETAIL, 2000 SPAN
SEE SUB BOM
WEIGHT (kg) APPROX: 73586
THIS DRAWING WAS PREPARED BY THE STAFF OF ADVANCED PLASTIC RECYCLING (APR) AND THE COPYRIGHT THERIN BELONGS TO THE COMPANY. ALL RIGHTS CONFERRED BY THE LAW OF COPYRIGHT AND BY VIRTUE OF INTERNATIONAL COPYRIGHT CONVENTIONS ARE RESERVED TO THE COMPANY. REPRODUCTION REQUIRES THE PRIOR WRITTEN CONSENT OF THE COMPANY. AS THE DRAWING MAY INCORPORATE CONFIDENTIAL INFORMATION OF THE COMPANY, ITS DISCLOSURE TO OTHERS REQUIRES THE COMPANY'S PRIOR WRITTEN CONSENT. ANY INFRINGEMENT OF THIS COPYRIGHT MAY RESULT IN LEGAL ACTION.
PROJECT No.ADVANCED PLASTIC RECYCLING PTY. LTD.LOT 9, 500 CHURCHILL ROADKILBURN,SOUTH AUSTRALIA 5084ABN 75 858 453 725T: (08) 8359 4999F: (08) 8359 4988sales@a-p-r.com.auwww.advancedplasticrecycling.com.au
NOTICE NOTES
DATE:
DESCRIPTION:
CHECKED:DRAWN:
DESIGNED:
6 7 8
A3
BRE
22/4/2015FINISH: N/A
PRELIMINARYNOT FOR CONSTRUCTION
THIRD ANGLEPROJECTION
11
8
8
14
9
14
7
10
15
DETAIL JSCALE 1 : 25
D
E
F
C
1 2 3 4
B
A
321 5
C
D
4 6 7 8
A
B
SHEET 2 OF 3
SCALE: 1:50
PART No.
APPROVED:
MATERIAL:
DIMENSIONAL TOL. U.N.O 10mm
5
E
APR-STD-BWK-02000BOARDWALK TYPICAL DETAIL, 2000 SPAN
SEE SUB BOM
WEIGHT (kg) APPROX: 73586
THIS DRAWING WAS PREPARED BY THE STAFF OF ADVANCED PLASTIC RECYCLING (APR) AND THE COPYRIGHT THERIN BELONGS TO THE COMPANY. ALL RIGHTS CONFERRED BY THE LAW OF COPYRIGHT AND BY VIRTUE OF INTERNATIONAL COPYRIGHT CONVENTIONS ARE RESERVED TO THE COMPANY. REPRODUCTION REQUIRES THE PRIOR WRITTEN CONSENT OF THE COMPANY. AS THE DRAWING MAY INCORPORATE CONFIDENTIAL INFORMATION OF THE COMPANY, ITS DISCLOSURE TO OTHERS REQUIRES THE COMPANY'S PRIOR WRITTEN CONSENT. ANY INFRINGEMENT OF THIS COPYRIGHT MAY RESULT IN LEGAL ACTION.
PROJECT No.ADVANCED PLASTIC RECYCLING PTY. LTD.LOT 9, 500 CHURCHILL ROADKILBURN,SOUTH AUSTRALIA 5084ABN 75 858 453 725T: (08) 8359 4999F: (08) 8359 4988sales@a-p-r.com.auwww.advancedplasticrecycling.com.au
NOTICE NOTES
DATE:
DESCRIPTION:
CHECKED:DRAWN:
DESIGNED:
6 7 8
A3
BRE
22/4/2015FINISH: N/A
Margaret River, Western Australia
Swale BridgesWPC swale bridges from APR are all Australian made, are non-permeable and designed to meet your specific requirements.
Low maintenance and splinter free, APR’s ecocomp swale bridges are perfect for a range of environments; from city parks to public recreation areas.
Available with slip-resistant coatings in a choice of colours, APR can supply the ideal fit for your area.
This page: Swale bridge, Singleton, New South Wales.
Design, engineer, manufacture and construct.
Page 4 | ENGINEERING PROJECTS | Design | Engineer | Manufacture | Construct
A 09.05.2015 ISSUED FOR APPROVAL
Rev Date Description
Notes
- ALL WELDS 6mm C.F.W. (SP) U.N.O.- DO NOT SCALE
Treatment
GRIT BLAST, INORGANIC ZINC SILICATE
FRAME MARK FR1 - 1 REQ'D AS DRAWNHorncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale Bridge
Advanced Plastic Recycling
ASSEMBLY
Drg #
1163-FR1 A
Rev
Size: A3
Drawn: CH
Date: May '15
Scale: 1:30
-Client Job #
TOTAL MATERIAL LIST FOR 1 ASSEMBLY
Mark Profile GradeLengthNo. Area per item (m2) Weight per item (kg)
M1 313.7PFC300*90 300PLUS1 7819 7.3
M2 313.7PFC300*90 300PLUS1 7819 7.3
M3 99.5PFC300*90 300PLUS2 2480 2.3
M4 250.5UB310*32 300PLUS2 7819 9.1
M5 4.6SHS75*75*2.5 3506 820 0.2
M6 4.5SHS75*75*2.5 3503 811 0.2
39.4 1368.2Total
Qty Bolt Dia. Bolt Grade
Bolts
204 8.8S
90 3820 180 3820 90
A - A
2480
832
817
832
90
4545
H.D. BOLT ARRANGEMENTTO BE RESOLVED WITH CLIENT2x ø22 BTM. FLANGE
2x ø22 BTM. FLANGE
1x ø20
M2
B
B
M3
M4
M4
M1
A A
M5
M5
M5
M5
M5
M5
M6
M6
M6
8000
90 1892 75 1906 75 1906 75 1891
FLUSH TO U/S
B - B
Horncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale Bridge
Advanced Plastic Recycling
MARKING PLAN
Drg #
1163-MP1 A
Rev
Size: A3
Drawn: CH
Date: May '15
Scale: 1:50
Client Job #
-Notes
- DO NOT SCALE
A 09.05.2015 ISSUED FOR APPROVAL
Rev Date Description
9074
281
774
290
90 1891 75 1906 75 1906 75 1892 90
8000
2480
H.D. BOLT ARRANGEMENTTO BE RESOLVED WITH CLIENT
FR1
B
B
A APLAN VIEW
DECKING HIDDEN FOR CLARITY
4000 4000
300
190
8000
FR1
OPTIONAL LEGS TO STABALISE FR1 IF REQUIRED.CONCRETE INTO POSITION ON SITE.
2x L1
A - A
2480
300
190
50
5045
45
CONTINUOUS RUNNERS4x 90 x 50 PLASTIC
EACH SIDE
5mm GAPS
CONTINUOUS EACH SIDE90 x 45 PLASTIC KICK RAIL
190 x 50 DECKING
13x 90 x 45 PLASTIC PACKERS
B - B
OPTIONAL LEGS TO STABALISE FR1 IF REQUIRED.
A 09.05.2015 ISSUED FOR APPROVAL
Rev Date Description
Notes
- ALL WELDS 6mm C.F.W. (SP) U.N.O.- DO NOT SCALE
Treatment
GRIT BLAST, INORGANIC ZINC SILICATE
LEG MARK L1 - 2 REQ'D AS DRAWNHorncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale Bridge
Advanced Plastic Recycling
ASSEMBLY
Drg #
1163-L1 A
Rev
Size: A3
Drawn: CH
Date: May '15
Scale: 1:10
-Client Job #
TOTAL MATERIAL LIST FOR 2 ASSEMBLIES
Mark Profile GradeLengthNo. Area per item (m2) Weight per item (kg)
F1 1.8FL10*90 2502 250 0.1
M7 3.2SHS75*75*3.0 3502 0 0.1
0.4 10.0Total
Qty Bolt Dia. Bolt Grade
Bolts
10 T.B.C. ON SITE
M7
A
A
9090
F1
A - A
Singleton, New South Wales
Page 5
A 09.05.2015 ISSUED FOR APPROVAL
Rev Date Description
Notes
- ALL WELDS 6mm C.F.W. (SP) U.N.O.- DO NOT SCALE
Treatment
GRIT BLAST, INORGANIC ZINC SILICATE
FRAME MARK FR1 - 1 REQ'D AS DRAWNHorncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale Bridge
Advanced Plastic Recycling
ASSEMBLY
Drg #
1163-FR1 A
Rev
Size: A3
Drawn: CH
Date: May '15
Scale: 1:30
-Client Job #
TOTAL MATERIAL LIST FOR 1 ASSEMBLY
Mark Profile GradeLengthNo. Area per item (m2) Weight per item (kg)
M1 313.7PFC300*90 300PLUS1 7819 7.3
M2 313.7PFC300*90 300PLUS1 7819 7.3
M3 99.5PFC300*90 300PLUS2 2480 2.3
M4 250.5UB310*32 300PLUS2 7819 9.1
M5 4.6SHS75*75*2.5 3506 820 0.2
M6 4.5SHS75*75*2.5 3503 811 0.2
39.4 1368.2Total
Qty Bolt Dia. Bolt Grade
Bolts
204 8.8S
90 3820 180 3820 90
A - A
2480
832
817
832
90
4545
H.D. BOLT ARRANGEMENTTO BE RESOLVED WITH CLIENT2x ø22 BTM. FLANGE
2x ø22 BTM. FLANGE
1x ø20
M2
B
B
M3
M4
M4
M1
A A
M5
M5
M5
M5
M5
M5
M6
M6
M6
8000
90 1892 75 1906 75 1906 75 1891
FLUSH TO U/S
B - B
Swale BridgesAPR was approached by St Ignatius College to assist with the construction of a swale bridge on college grounds.
Requiring a 4 tonne load rating, this meant APR’s design team and engineering partners had to work closely to come up with a solution.
A detailed engineering design to meet council requirements was provided and APR continued with the supply and installation of the swale bridge, resulting in the perfect solution for the
College.
Page 6 | ENGINEERING PROJECTS | Design | Engineer | Manufacture | Construct
Page 7
M7
100
833
833
833
100
2700
M6
M6
M6
M6
M6
M4
M4
M4
M2
M1
M3
M3
1x ø24
1x ø24
1x ø24
1x ø24
1x ø24
1x ø24
1x ø24
1x ø24
1537
1974
8000
M5
M5
M5
M5
M5
M5
M6
69 1537 1537 1537
90 1935 1974
DETAIL C
10x M8
10x M7
1537 63
1937 90
675
675
675
675
125
6
75 150 75
2x ø12
M7
M8
2x ø12 THRU
FLUSH TO U/S
6 125 6
125
6
6363
2x ø12 THRU
M7
M8
1 21.12.2015 ISSUED FOR FABRICATION SUBJECT TO APPROVAL
Rev Date Description
Notes
- ALL WELDS 6mm C.F.W. (SP) U.N.O.- DO NOT SCALE
Treatment
GRIT BLAST, INORGANIC ZINC SILICATE
FRAME MARK FR1 - 1 REQ'D AS DRAWNHorncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale BridgeSt Ignatius
Advanced Plastic Recycling
ASSEMBLY
Drg #
1208-FR1 1
Rev
Size: A3
Drawn: CH
Date: Dec '15
Scale: 1:10
-Client Job #
TOTAL MATERIAL LIST FOR 1 ASSEMBLY
Mark Profile GradeLengthNo. Area per item (m2) Weight per item (kg)
M1 313.7PFC300*90 300PLUS1 7819 7.3
M2 313.7PFC300*90 300PLUS1 7820 7.3
M3 108.3PFC300*90 300PLUS2 2700 2.5
M4 250.5UB310*32 300PLUS3 7819 9.1
M5 9.4SHS100*100*5.0 3506 664 0.3
M6 9.5SHS100*100*5.0 3506 669 0.3
M7 5.5FL6*300 25012 375 0.2
M8 0.1FL6*25 25012 125 0.0
52.8 1776.5Total
Qty Bolt Dia. Bolt Grade
Bolts
208 CHEMSET
A - A
B
B
A A
B - B
DETAIL- C
Horncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale BridgeSt Ignatius
Advanced Plastic Recycling
MARKING PLAN
Drg #
1208-MP1 1
Rev
Size: A3
Drawn: CH
Date: Dec '15
Scale: 1:50
Client Job #
-Notes
- DO NOT SCALE
1 21.12.2015 ISSUED FOR FABRICATION SUBJECT TO APPROVAL
Rev Date Description
FR1
B
B
A A
PLAN VIEWDECKING HIDDEN FOR CLARITY
1537 1537 159
675
675
675
675
2700
90 1891 75 1906 75 1906 75 1892 90
8000
159 1537 1537 1537
8000
A - A
300
190
2700
300
190
50
5045
45
CONTINUOUS RUNNERS4x 90 x 50 PLASTIC
EACH SIDE
5mm GAPS
CONTINUOUS EACH SIDE90 x 45 PLASTIC KICK RAIL
190 x 50 DECKING
13x 90 x 45 PLASTIC PACKERS
B - B
Horncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Swale BridgeSt Ignatius
Advanced Plastic Recycling
H.D. BOLT PLAN
Drg #
1208-HD1 1
Rev
Size: A3
Drawn: CH
Date: Dec '15
Scale: 1:50
Client Job #
-Notes
- DO NOT SCALE
1 21.12.2015 ISSUED FOR FABRICATION SUBJECT TO APPROVAL
Rev Date Description
100
833
833
833
100
A A
4x ANCHORS EACH SIDE
H.D. BOLT LAYOUT
100
833
833
833
100
2700
40 7920
BOLT CTRS
40
8000
50 40
M20 CHEM. ANCHOROR H.D. BOLT CAST IN AS REQ'DTO CONCRETE BRIDGE END SUPPORTS8x TOTAL
A - A
St Ignatius College, South Australia
Viewing PlatformsWhether it be for bird watching or integrated with a boardwalk, APR’s custom-made viewing platforms are the ideal product to help you enjoy the Australian landscape.
APR will work with you to design a WPC viewing platform that meets your needs and compliments your area; and always made to order, so you won’t be paying for product you don’t need.
Page 8 | ENGINEERING PROJECTS | Design | Engineer | Manufacture | Construct
Margaret River, Western Australia
Waterfall Gully, South Australia
Robe, South Australia
Monash, South Australia
Page 9
A 29.11.2016 ISSUED FOR APPROVAL
Rev Date Description
Notes
- ALL WELDS 6mm C.F.W. (SP) U.N.O.- DO NOT SCALE
Treatment
GRIT BLAST, INORGANIC ZINC SILICATE
FRAME MARK FR1 - 1 REQ'D AS DRAWNHorncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Fish Cleaning Platform
Advanced Plastic Recycling
ASSEMBLY
Drg #
1246-FR1 A
Rev
Size: A3
Drawn: CH
Date: Nov '16
Scale: 1:10
-Client Job #
TOTAL MATERIAL LIST FOR 1 ASSEMBLY
Mark Profile GradeLengthNo. Area per item (m2) Weight per item (kg)
F1 1.6FL10*90 2502 220 0.0
M1 313.7PFC300*90 300PLUS1 7820 7.3
M2 313.7PFC300*90 300PLUS1 7820 7.3
M3 96.3PFC300*90 300PLUS2 2400 2.2
M4 250.5UB310*32 300PLUS3 7820 9.1
M5 8.4SHS100*100*5.0 3506 589 0.2
M6 8.4SHS100*100*5.0 3506 595 0.2
M7 5.5FL6*300 25010 375 0.2
M8 0.1FL6*25 25010 125 0.0
51.5 1731.5Total
Qty Bolt Dia. Bolt Grade
Bolts
208 CHEMSET
204 8.8S
A - A
100
733
733
733
100
2400
1x ø24
1x ø24
1x ø24
M5 M5
M5
M5
M5
M6
M6
M6
M6
M6
M6
M4
M4
M4
M2
M1
M3
M3
1x ø24
1x ø24
B
B
A A
1325
1974
5650
8000
M7
F1F1
DETAIL C
10x M8
10x M7
M5
69 1537 1295 1990
90 1935 1974
5555
D
D1537 69
1937 90
600
600
600
600
1x ø24
1x ø24
1x ø24
125
6
75 150 75M7
M8
2x ø12 THRU
FLUSH TO U/S
B - B
6 125 6
125
6
6363
2x ø12 THRU
M7
M8
DETAIL- C
55
75 150 75
F1
D - D
Horncastle Drafting
0402 543 711
email@horncastle.com.au
www.horncastle.com.au
Project
Client
Fish Cleaning Platform
Advanced Plastic Recycling
H.D. BOLT PLAN
Drg #
1246-HD1 A
Rev
Size: A3
Drawn: CH
Date: Nov '16
Scale: 1:50
Client Job #
-Notes
- DO NOT SCALE
A 29.11.2016 ISSUED FOR APPROVAL
Rev Date Description
4059
8810
073
373
373
310
0
6028
2400A A
4x ANCHORS
H.D. BOLT LAYOUT
100
733
733
733
100
4x ANCHORS
100 733 733 733 100
4x ANCHORS
8000
40 7920
BOLT CTRS
40
50 40
M20 CHEM. ANCHOROR H.D. BOLT CAST IN AS REQ'DTO CONCRETE BRIDGE END SUPPORTS12x TOTAL
A - A
Waterfall Gully, South Australia
Kangaroo Island, South Australia
San Remo, Victoria Robe, South Australia
For further information please contact:
APR
Lot 9, 500 Churchill Road
Kilburn, South Australia 5084
T: +61 8 8359 4999
E: sales@a-p-r.com.au
www.a-p-r.com.au
All WPC products shown in this brochure have been designed, engineered and manufactured in Australia by APR – an Australian owned and operated company.
© APR | Last Updated June 2017
Adelaide, South Australia