ApproachestoConvincingOthers

Selling Mitigation to Operators and Managers

NWHA 2020 Annual Conference

April 21, 2019

FERCLicenseCompliance

Cap

Cap Cap

Cap

Cap

Relicensing

CapitalRelicensing

Relicensing

Capital

Capital

Capital

Relicensing O&M

Capital

1998 2048Cushman: 50 yr License

Relicensing O&M

2003 2038Cowlitz: 35 yr License

RelicensingO&M

1997 2037Nisqually: 40 yr License

RelicensingO&M

1987 2037Wynoochee: 50 yr License

1995 2005 2015 2025 2035 20451990

NaturalResourcesO&MCostsandFTE

33

0

5

10

15

20

25

30

35

$-

$5.0

$10.0

$15.0

$20.0

$25.0

$30.0

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Staf

f (FT

E)

O&M

Cos

ts ($

M)

O&M Costs

Staff

AFERCLicense– ALivingDocumentArticles Clear Requirements

– River Flow and Lake Elevations – fish habitat and recreational uses – Fish Mitigation – fish facilities and programs – Wildlife Mitigation – elk forage fields, bird houses, tree thinning– Land Management – shoreline permits, utility easements– Water Quality – total dissolved gas production– Recreation – parks, boat launches, trails, etc.

General Obligations Requiring Plans– Plans approved by Regulators and FERC– Plans become part of License– Most Plans are updated periodically and change

4

Audiences

55

Contractors

Board of Directors Management

Regulators

Operators

Engineers

Stakeholders

LicenseImplementation

66

HowtoAchieveAgreementwithImplementingYourFERCLicense

77

Three Vital ElementsØTell the “Story”ØMake Relatable to AudienceØBenefits and Risk

StoryMapping

88

The Journey Move From . . . . . . . . . . . Move To

Who are the people you are presenting to?What are they like?Why are they here?What keeps them up at night?How can you solve their problem?What do you want from them?How might they resist?How can you best reach them?

Common GroundShared Experiences?Shared Goals?Qualification?

StoryMappingorBoarding

99

Training from www.Duarte.com

Book

Duarte, Nancy. 2008. Slide:ology The art and science of creating great presentations. O’Reilly Media. Sebastopol. 274pp.

Cushman Fisheries Program

AnalogyandStories

1111

Dictionary Definition

Analogy –a comparison between two things, typically for the purpose of explanation or clarification.

Use Analogy to:• Keep Interest• Provide a better understand

AnalogyExample

1212

Fish Hatchery Reform –Hatchery Science Review Group

Why the rules and changes? $ Lots of costs $

Analogy

Wolf

1313

Domestication

DomesticationofSalmon

1414

Wolf vs. Chiwawa

Wild vs. Hatchery

HSRG Rule intended to reverse domestication

Change chiwawa back into the wolf

BenefitsandRiskswithResponse

1515

BenefitsØ Why the proposed action?Ø What does it provide to you (audience)?Ø How does it benefit us?

Risks & ManagementØ Identify RiskØ Perform Risk AnalysisØ Plan Risk Responses

Adaptive Management

Risk Response Plan

Performance MonitoringFish Capture Efficiency (FCE)

Fish Collection Effectiveness (FCF)Retention Efficiency (RE)

Collection Contribution by each collector

Directed Studies(Considered Annually)

Entrance Efficiency (EE)Discovery Efficiency (DE)Approach Behavior (AB)Retention Efficiency (RE)

FishPassage Survival

By Species1

Continue Operation and Maintenance

Technical Work Group: Review/Analyze Data Results; FTC: Recommendation to Tacoma

Exceeds FHMP

Decision Rules2

Facility Modification

4 ,5, 6

(See Decision Keys

CFNSC, U

pper Riffe, and/or Existing System)

3 years of evaluations?

3 normal water years of evaluation (or 5 years

maximum)?

Additional Data

needed to Implement

Facility Adjustment

< 95%

> 95%

FPS < 75%

FPS 75% - 95%

Yes

NoNo

Yes

No

Yes

Yes

No

3 Normal water years of evaluations?

No Yes

Annual Facility A

djustment 4,5

(See Decision Keys

CFNSC, U

pper Riffe, and/or Existing System)

Significant Improvement 3

in FPS as determined by

TWG/FTC

5 water years(i.e. 3 Normal, 1 Wet and 1 Dry

years)(Or 10 year Maximum?)

Yes No

Yes

No

Facility Adjustment Addresses Problem

SpeciesSteelhead

CohoChinook

Annual Hydrograph Considerations

Operation Steelhead Coho Chinook

2 Units w/ spill X X

2 Units (full load) X X

2 Units (unequal load) X X X

1 Unit (2500-5000 cfs) X X X

1 Unit (1800-2500 cfs) X X

1 Unit (on/off operation) X X

Process Flow Chart7

Yes

No

Current Base pump

back operation

5 years of evaluations?

750 cfs

500 cfs

No

Yes