ANNEXURE INVENTORY

Annexure A – Public Participation Appendix A1 – Text of Newspaper Advertisements

Appendix A2 – Text of Site Notice and Flyers

Appendix A3 – Background Information Document

Appendix A4 – List of Registered I&APs

Appendix A5 – Issues Register

Appendix A6 – Map of Scoping Phase I&APs

Appendix A7 – Map of EIR Phase I&APs

Appendix A8 – Minutes of Public Meetings

Appendix A9 – Minutes of Focus Group Meetings

Appendix A10 – Correspondence

Appendix A11 – Petition

Appendix A12 – Mobile displays

Appendix A13 – Presentations

Annexure B – Technical Information Appendix B1 – Map of Study Area

Appendix B2 – Map of Proposed Corridor

Appendix B3 – Technical Specifications of the 400kV Transmission Line

Appendix B4 – Electromagnetic Fields Report

Appendix B5 – Need for the Mercury – Perseus 400kV Transmission Line

Appendix B6 – Environmental Management Plan (Draft)

Annexure C – Specialist Reports Appendix C1 – Agricultural Economic Impact of the Mercury

Appendix C2 – Socio-Economic Impact Assessment

Appendix C3 – Visual Impact Assessment

Appendix C4 – Ecological Assessment

Appendix C5 – Impacts on Soil and Landform

Appendix C6– Impacts on Bird Life

Appendix C7 – Engineering Geological Study

Appendix C8 – Impacts on Hydrology and Surface Water Resources

Appendix C9 – Impact on Tourism

Appendix C10– Impact on Cultural and Heritage Resources

ANNEXURE A – PUBLIC PARTICIPATION

Appendix A1 – Text of Newspaper Advertisements

Appendix A2 – Text of Site Notice and Flyers

Appendix A3 – Background Information Document

Appendix A4 – List of Registered I&APs

Appendix A5 – Issues Register

Appendix A6 – Map of Scoping Phase I&APs

Appendix A7 – Map of EIR Phase I&APs

Appendix A8 – Minutes of Public Meetings

Appendix A9 – Minutes of Focus Group Meetings

Appendix A10 – Correspondence

Appendix A11 – Petition

Appendix A12 – Mobile displays

Appendix A13 – Presentations

APPENDIX A1 TEXT OF NEWSPAPER ADVERTISEMENT

Prepared by Strategic Environmental Focus

APPENDIX A2 SITE NOTICE AND FLYERS

Prepared by Strategic Environmental Focus

APPENDIX A3 BACKGROUND INFORMATION DOCUMENT

Prepared by Strategic Environmental Focus

APPENDIX A4 LIST OF REGISTERED I&APS

Prepared by Strategic Environmental Focus

APPENDIX A5 ISSUES REGISTER

Prepared by Strategic Environmental Focus

APPENDIX A6 MAP OF SCOPING PHASE I&APS

Prepared by Strategic Environmental Focus

APPENDIX A7 MAP OF EIR PHASE I&APS

Prepared by Strategic Environmental Focus

APPENDIX A8 MINUTES OF PUBLIC MEETING

Prepared by Strategic Environmental Focus

APPENDIX A9 MINUTES OF FOCUS GROUPS

Prepared by Strategic Environmental Focus

APPENDIX A10 CORRESPONDENCE

Prepared by Strategic Environmental Focus

APPENDIX A11 PETITION

Prepared by Strategic Environmental Focus

APPENDIX A12 MOBILE DISPLAYS

Prepared by Strategic Environmental Focus

APPENDIX A13 PRESENTATIONS

Prepared by Strategic Environmental Focus

ANNEXURE B – TECHNICAL INFORMATION

Appendix B1 – Map of Study Area

Appendix B2 – Map of Proposed Alignment

Appendix B3 – Technical Specifications of the 400kV Transmission Line

Appendix B4 – Electromagnetic Fields Report

Appendix B5 – Need for the Mercury – Perseus 400kV Transmission Line

Appendix B6 – A generic Environmental Management Plan

APPENDIX B1 STUDY AREA MAP

Prepared by Strategic Environmental Focus

APPENDIX B2 MAP OF PROPOSED CORRIDOR

Prepared by Strategic Environmental Focus

APPENDIX B3 TECHNICAL SPECIFICATIONS OF THE 400 KV TRANSMISSION LINE

Drawing 1: Cross rope suspension type

Drawing 2: Compact cross rope type

Drawing 3: Guyed suspension type

Drawing 4: Self-supporting type

Drawing 5: Self-supporting strain tower type

Drawing 6: Comparison drawing and servitude of two 400 kV Transmission Lines

(Strain tower type).

Drawing 7: Comparison drawing and servitude of two 400 kV Transmission Lines

(Guyed suspension type).

Prepared by Strategic Environmental Focus

APPENDIX B4 ELECTROMAGNETIC FIELDS REPORT

Prepared by Strategic Environmental Focus

APPENDIX B5 THE NEED FOR THE MERCURY – PERSEUS 400 KV TRANSMISSION LINE

Prepared by Strategic Environmental Focus

APPENDIX B6 A GENERIC ENVIRONMENTAL MANAGEMENT PLAN

Prepared by Strategic Environmental Focus

ANNEXURE C – SPECIALIST REPORTS

Appendix C1 – Agricultural Economic Impact of the Mercury – Perseus Transmission Line

Appendix C2 – Socio-Economic Impact Assessment

Appendix C3 – Visual Impact Assessment

Appendix C4 – Ecological Assessment

Appendix C5 – Impacts on Soil and Landform

Appendix C6– Impacts on Bird Life

Appendix C7 – Engineering Geological Study

Appendix C8 – Impacts on Hydrology and Surface Water Resources

Appendix C9 – Impact on Tourism

Appendix C10– Impact on Cultural and Heritage Resources

APPENDIX C1 AGRICULTURAL ECONOMIC IMPACT

Prepared by Strategic Environmental Focus

APPENDIX C2 SOCIO-ECONOMIC IMPACT ASSESSMENT

Prepared by Strategic Environmental Focus

APPENDIX C3 VISUAL IMPACT ASSESSMENT

Prepared by Strategic Environmental Focus

APPENDIX C4 ECOLOGICAL ASSESSMENT

Prepared by Strategic Environmental Focus

APPENDIX C5 IMPACTS ON SOILS AND LANDFORM

Prepared by Strategic Environmental Focus

APPENDIX C6 IMPACTS ON BIRD-LIFE

Prepared by Strategic Environmental Focus

APPENDIX C7 ENGINEERING GEOLOGICAL STUDY

Prepared by Strategic Environmental Focus

APPENDIX C8 IMPACTS ON HYDROLOGY AND SURFACE WATER RESOURCES

Prepared by Strategic Environmental Focus

APPENDIX C9 IMPACT ON TOURISM

Prepared by Strategic Environmental Focus

APPENDIX C10 IMPACT ON CULTURAL AND HERITAGE RESOURCES

Prepared by Strategic Environmental Focus