Anna Osello BIM: Il Catasto del futuro BIM:The Cadastre of ... - MADE...

Post on 17-Jul-2020

0 views 0 download

Transcript of Anna Osello BIM: Il Catasto del futuro BIM:The Cadastre of ... - MADE...

In collaborazione con

BIM: Il Catasto del futuroBIM:The Cadastre of the future

Milano, 10 marzo 2017

Anna Osello

• drawing TO the future

• BIM – Tradition and Innovation

• BIM Process

• Building Information Modelling

• Data Collection

• Use of BIM Models

• BIM: the cadastre of the future

• Technologies for Augmented and Virtual Reality

• What the cadastre of the future is?

• Conclusions

Summary

drawing TO the future

BIM – Tradition and InnovationInnovationTradition

Drawing CAD BIMPolyhedral forms

1960 1970 1980 2000 2016

Object-basedparametricmodelling

BIM – Tradition and Innovation

Existing 3D models

Facility Management

ParametricModel

BIM

3D Interoperability

Levels of Development/Levels of Detail

Construction drawingsPlants

ElevationsSectionsShedules

Data Collection Data Restitution Simulation tests

Urban Land data(shapefiles, GIS model)

MEP systems drawings

Survey dataGeometricalPhotographic

Laser Scanner

Database

Lighting

Thermal

Structural

Workflow

Systems

Architecture

Energy Usage

AR

/ V

R V

isua

lizat

ion

the Technological dimension;the Organizational dimension;the Procedural dimension.

BIM PROCESS

LOD

Properties

Shared Parameters

Case Study: HistoricalArchives of the City of Turin

Building Information Modelling

Data Collection

Case Study:

Office building, Piazza di Città 7

GEOMETRY + DATA

BUILDING

SYSTEMSSPACES

BIMMODELS

SurveyCAD

Image-based modelling

As-Built

INDICATORS• % NFA/GFA• % NLA/NUA• % Utilization rate of spaces• m2/Zones - Tenant- Category - Type• m2Heated-Conditioned /Tenant-Zones• m3Heated-Conditioned /Tenant-Zones• m2 Public spaces/Zones-Tenant• m2 Suspended ceiling/NLA• # Occupants/Floor –Zones-Tenant• m2/per Occupants-Workstation• # Equipments /room-level-building

COSTS• € TCO/ m2 GFA• € Maintenance / m2 GFA-User-Tenant• € Cleaning /m2-User• € Utilities /m2-User• Electric energy consumption kWh/m2

GFA -User-Tenant

… Space Management

Case study: Office building, via Meucci 4

Use of BIM Models

… Energy Simulations

… Illuminotechnical Simulations

Use of BIM Models

Case study: Public Works Archive

Caso studio: Palazzo di CittàAs-is

Proposal #1: Relamping and devices increasing

Proposal #2: The LED technology

Use of BIM Models

VR

… Maintenance

AR

Case study: Santorre di Santarosa Primary School

Case study: Office building via Giolitti 42

BIM: The Cadastre of the future

New technologies

AUGMENTED REALITY “ AR is the integration of digital information with the user's environment in real time ”

� Aurasma App� QR Code

VIRTUAL REALITY“ VR is an realistic and immersive simulation of a three dimensional environment, created using interactive software and hardware, and experienced or controlled by movement of the

body ”

� A360 App� Oculus� Fire Protection App

Aurasma

Oculus

A360QR

Technologies for Augmented and Virtual Reality Case study: Palazzo di città

Case study: School «Primo Liceo Artistico»

Case study: Palazzo di Città 7

Case study: New Building Bertola

What the cadastre of the future is?

Conclusions

Conclusions

Contact