AMMUNITION ENTERPRISE EXCELLENCE...Enterprise Excellence is a disciplined, structured approach for...

Post on 12-Aug-2020

6 views 0 download

Transcript of AMMUNITION ENTERPRISE EXCELLENCE...Enterprise Excellence is a disciplined, structured approach for...

AMMUNITION ENTERPRISEEXCELLENCE

Ready for Tomorrow?

Robert CrawfordJoint Munitions Command

19 February 2004DSN 793-6899

2

• Kevin Fahey, Deputy PEO Ammunition

• Pat Serao, ARDEC

• Mark DeYoung, ATK

• Pierre Chao, Defense-Industrial Initiatives Center

• Jody Parker, Lockheed Martin

• Judy Solgaard, American Ordnance

3

The Ammunition Enterprise implementation ofThe Ammunition Enterprise implementation ofEnterprise Excellence is a Enterprise Excellence is a disciplineddisciplined, , structuredstructuredapproach for process and product optimization that isapproach for process and product optimization that isfocused on the focused on the effectivenesseffectiveness and and efficiencyefficiency of the of theorganization.organization.

Effectiveness x Efficiency = Enterprise ExcellenceEffectiveness x Efficiency = Enterprise Excellence

4

Ammunition EnterpriseAmmunition Enterprise

� Instilling discipline across the board� Permeate six sigma/lean into our business –

both Service and Production Processes� Kicked off a Ammunition Enterprise six

sigma/lean enterprise executive black beltprogram

� Using Lean/Six Sigma principles in theestablishment of Ammunition Enterprise wideprocesses

� Encouraging contractors to use Lean/Six Sigmatools

5

s

Lean Metrics

Lean WorkloadBalancing

• Focused Q$S-R

• Payback

• InfrastructureSupport

• Enterprise Map

• DMAIC Process

• AO

• MTBF

• MTTR

• Cycle Times

• TAKT Times

• Unit Cost

Process Metrics

• Yield

• Scrap

• Rework

• RTR

• Cost

• Cycle Time

Lean Process

• Routing Analysis

• Work Cells

• StandardizedActivities

• Line Balancing

Process Optimization

QualityManagement

System

• Work Cells

• StandardizedActivities

• One Piece Flow

• Automation

• Infrastructure

• ProcessDocumentation

• Management

• Implementation

• ISO-9000

Effectiveness

Efficiency

Voice of theCustomer

• IPPD

• Product to ProcessLink

• PerformanceRequirements

• ProcessRequirements

Six-SigmaProject

Selection

Six-SigmaProcess Control

Six-SigmaProcess

Improvement

• Process Mapping

• Process FMEA

• Statistical ProcessControl

• Measurement SystemsEvaluation

• Process Capability

• Descriptive Statistics

• Inferential Statistics

• Analysis of Variance

• Linear Contrasts

• Design ofExperiments

6

DevelopAmmunition

AcquisitionOf Ammunition

ProductionOf Ammunition

sRequirementsGenerationProcess - AAORequirementsDocumentFunded Program

• ProgramManagement/Planning/Control

• Contracting• System Engineering• Test and Evaluation• PPBES• Milestone Review Process

DP1 2

3

Yes

No

TechnicalDefinitionMilestone CIndustrial BaseStrategy

Funding• Acquisition Strategy /

Planning• Contracting• Program

Management/Planning/Control

• Review/Certification if TDP ifApplicable

• PPBES• Pre-production Engineering• Price & Availability• IM Strategy (legacy

systems)

Contract

Funding

StockpileManagement

• Production/Systems Engineering (ifApplicable)

• Design and Process Improvement• Production Testing• Production Monitoring• Configuration Management• Acceptance• Program

Management/Planning/Control• Manufacturing• Quality Assurance• First Destination Shipping• Contract Modification• Safety and Environmental

4

Ammunition/ComponentsSurveillanceRequirementContingency/Out-loadingRequirements

• ProgramManagement/Planning/Control

• Surveillance Program / QDRSuspensions

• Inventory Control/Accountability• Receipt and Issue• Distribution and Requisitioning• Out loading• Retrograde• Transportation• Maintenance of Storage Facilities• Safety/Security• Pre-positioning• Malfunction Investigation• PPBES

5/6

ServiceableObsoleteUnserviceableFunded ProgramTechnical definition

TechnologyDevelopment

• S and T• Systems

Engineering• Modeling and

Simulation• Technology

Transfer• Configuration

Management• New Technologies

• DevelopingTechnologies

7

Maintenanceof Stockpile

Sales

DemilitarizationOf Ammunition

MaintenanceRequired4

• Program Management/Planning/Control• Maintenance Planning• Parts Procurement• Contracting• Acceptance• Safety security environmental• Execute Program• Management Control

4

Yes

No

• ProgramManagement/Planning/Control

• Commercial Sale• Develop Demil Technologies and

Procedures• R3

• Contracting• Disposal• Recode to Stock

• FMS• Presidential Drawdown• Direct Sales• GFM

E

• Unserviceable• Recap• Modernization

Expended?

4

5

6

7 Expended?

3/4

No

No

Organic Issue

• Requisition• Training• Combat• Testing

8

SummarySummary

• Ammunition Enterprise serious about continuousimprovement

• Utilizing Lean/Six Sigma structured approach

• Expect all of ammunition enterprise to include industrypartners commitment to this journey

9

What makes up a “perfect contractor”to you?

10

What benefits has your Lean/SixSigma program had over otherimprovement programs you havetried in the past?

11

How have you and yourcustomers benefited from yourLean/Six Sigma program?

12

How will the Army use Lean/SixSigma as a factor in Best Valuecontracting if at all?

13

Is there a financial advantage to fullyimplementing Lean/Six Sigma toolsin a business?

14

How do you verify and track thegains made from implementation ofLean/Six Sigma within yourorganization?

15

What price premium are you willingto pay to ensure a quality product?

16

If you were interested in starting acontinuous improvement programtomorrow what are the first three thingsyou would do?

17

The other Service's perception is ourenterprise is not consistently makingquality ammunition. Based on yourexperience can a robust Lean/SixSigma program turn the tide on thequality of our products? How?

18

19

20

Ammunition Enterprise CommitmentThe PEO Ammunition, JMC and ARDEC are leading theway in implementing Enterprise Excellence in theAmmunition Enterprise:

� Executive Champions 147

� Green Belt Six Sigma Lean 638

� Black Belts Six Sigma Lean 189

� Total Productivity Maintenance 41

� Current Process Improvement ProjectsApproximately 200 within the AmmunitionEnterprise