Alliant Energy Field Renovation

September 2005

Work area blocked off Pitching mound is flattened

September 2005

Exterior wall removed on 6th Ave. North

Field is removed

September 2005

Future site of the berm

Center field is removed and leveled

September 2005

Hot Box is demolished

3rd Base Concession trailer removed

October 2005

View from Riverview Drive

Field is level

October 2005

Removal of field drains

Crushed stone pillars for foundation

October 2005

Irrigation lines laid out

Future site of Baseball Office

October 2005

Trenches for drainage tiles

Drainage coils laid out

October 2005

Field lay out for drainage tiles

November 2005

Parking lot entrance Aerial view of Picnic Garden

November 2005

Right Field demolition and construction

Infield sod started

November 2005

Sod installation and first watering

First snowfall on field

November 2005

Sod installation complete

Drainage installation continued

December 2005

Continued work on Grill / Picnic Garden

Foundation of Baseball Office

December 2005

Berm wall constructed

Walls for Clubhouse / Batting Tunnel

December 2005

Continued construction on Clubhouse / Batting Tunnel

December 2005

Blocks being laid for Baseball Office

View towards Left Field

January 2006

Baseball Office work continues

Root growth on sod

January 2006

Berm wall construction continues Future expansion for

Lumber Lounge

January 2006

Baseball Office roof installed

Lumber Lounge expansion continues

January 2006

Front Entrance formedView from home

plate to Right Field

January 2006

View from berm to Picnic Garden

Clubhouse construction continues

January 2005

Lumber Lounge expansion continues

January 2006

Steps and ramp to Picnic Garden

poured

Inside the Baseball Office

January 2006

Front Entrance and Baseball Office construction continued

February 2006

Lumber Lounge expansion continued

Grill being painted

February 2006

Front Entrance and Baseball Office construction continued

February 2006

Ground being prepared for cement

February 2006

Lumber Lounge expansion continues

Front Entrance construction

continues

February 2006

Grill stucco completed

Concrete walkway to Picnic Pavilion poured

February 2006

Lumber Lounge expansion continued

Sod taking shape

February 2006

Concourse cement poured

Unique Left Field configuration

February 2006

Baseball Office wall construction

3rd Base Concession remodeling

February 2006

Picnic Pavilion construction begins

Picnic Garden cement poured

February 2006

Aerial of Picnic Garden

Aerial of Baseball Office

February 2006

Aerial of Infield and Left Field

Lumber Lounge expansion continues

March 2006

Stucco work completed on Front Entrance and Baseball Office

March 2006

Fence along home bullpen started

Right Field wall installation

March 2006

1st Base Concourse fence started

Lumber Lounge expansion continued

March 2006

Lumber Lounge expansion continued

March 2006

Outfield wall construction

Lumber Lounge expansion continued

March 2006

Front Entrance gates installed

1st Base Concourse cement completed

March 2006

Outfield wall construction continued

March 2006

Lumber Lounge expansion near completion

March 2006

Clubhouse carpet installed

March 2006

Batting Tunnel near completion

Baseball Office near completion

April 2006

Box seats removed

April 2006

Score board removed

New mesh banner installed

April 2006

View of berm from Picnic Garden

New box seats installed

April 2006

Front Entrance Parking lot entrance from 6th

Ave. North

April 2006

Front EntranceLocker

installation in Clubhouse

April 2006

Landscaping started New windows in old Baseball Office

April 2006

Front Entrance completed

New scoreboard installed

April 2006

View from berm Picnic Garden complete

April 2006

Field ready to go Lumber Lounge expansion completed

April 2006

1st Base Concourse Front Entrance

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Opening Day

Club House

Player Locker Room

Club House

Player Locker Room

Club House

Coaches Office

Club House

Managers Office Trainers Room

Club House

Training Room / Weight Room

Batting Tunnel

Batting Tunnel

Batting Tunnel

Batting Tunnel

Playing Field

Playing Field

Playing Field

Playing Field

Playing Field

Playing Field

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans

LumberKingFans