AIESEC I

Post on 17-Jul-2015

33 views 0 download

Tags:

Transcript of AIESEC I

Team Structure: Marketing

oGCDP Cluster 4 is not recommended to have a

PM Marketing.

iGCDP Cluster 4 is not recommended to have a

PM Marketing.

ogip Cluster 3 is not recommended to have a

PM Marketing.

igip Cluster 4 is not recommended to have a

PM Marketing.