Post on 27-Jan-2021
AdvanTEC Solutions
CASE STUDY ON TAJ PALACE
40%
ORGANIZATION
Buildings
16% Lighting
9% IT / electronics
10% Water heating
25% Other
40%
32%
28%
Transportation
Industry
100%
ENERGY CONSUMPTION
Energy Pockets
Chiller70%
Chilled Water Pump12%
Condenser Water Pump
12%
Cooling Tower6%
40% HVAC
SUCCESS STORIES
4
CASE STUDY - TAJ PALACE, NEW DELHI
5
6
METHODOLOGY
Min Load: 200 TR, Maximum Load: 1100 TR
PLANT PERFORMANCE PROFILE
58%
5%
20%
12% 5%AC Plant Power Consumption
Chiller CHWP CHWS
0.57
1.00
0.70
1.17 1.1
-
0.20
0.40
0.60
0.80
1.00
1.20
1.40
Chiller 1# Chiller 2# Chiller 3# Chiller 4# Chiller 5#
IKW
/TR
Individual Chiller Performance
Plant Room Upgrade/ECM IMPLEMENTED
Equipment
• High Efficient Chiller • New Variable Pumps• CTI certified Cooling Tower• Anti Fouling Devices on heat exchanger
System Level
• Dedicated Pumping for Zero Bypass/Leakage• All Variable system design to sustain plant performance• System Designed for < 0.8 IKW/Tr Performance
Integration
• Chiller Plant optimizer• Real Time data logging• Advance Remote monitoring• Adaptive Algorithms for continuous performance improvement
PLANT ROOM OPTIMIZATIONINTEGRATED SYSTEM
9
10
ENERGY SUSTENANCE
Carrier RMS Center / Customer Center ADSL ModemWireless Modem 3G Router
A remote monitoring unit SIM/LGR (iVu/WebCTRL) is installed in your chiller plant
A communication link with the Chillers / Pumps / Cooling Tower / AHU / Others
Option
Internet
Site3 Site2 Site1
Varity Internet access typesDedicated IP
RMS - Help to know the chiller plant status & performance from anywhere through variety of devices, from PCs to web-based cell phones.
SIM/LGR
OR+
WebCTRLi-Vu
Remote Monitoring / Diagnostics
http://www.dell.com/content/products/category.aspx/precn?c=us&cs=04&l=en&s=bsdhttp://www.dell.com/content/products/category.aspx/precn?c=us&cs=04&l=en&s=bsd
C0MPLETE SYSYTEM SOLUTIONS
11
Visualization Optimization Benchmark Diagnostics
Plant system manager
+
Chiller plant health manager
Focus on
• Cost / Energy savings
• System performance
• Diagnostics
ENERGY SAVINGS ACHIEVED
ikW/ton
Over 37% Improvement
1.1
0.7
Chiller Plant Efficiency Chart(As per current performance)
0.6
Actual 0.64
Old 1.44
Target0.65
12
PLANT ROOM PERFORMANCE
VERIFICATION –EARTHCHECK DATA
RECOGNISED BY BEE
15
RECOGNISED BY BEE
Thank you
Retrofitting Existing Building = Asset Enhancement
Integrated Solution for Building = Sustainability
Benefits - Integrated System Concept
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6PLANT PERFORMANCE PROFILEPlant Room Upgrade/ECM IMPLEMENTEDSlide Number 9ENERGY SUSTENANCEC0MPLETE SYSYTEM SOLUTIONSENERGY SAVINGS ACHIEVEDPLANT ROOM PERFORMANCEVERIFICATION – EARTHCHECK DATASlide Number 15RECOGNISED BY BEESlide Number 17