Post on 10-Jun-2015
description
1
Bonnenberg+ Drescher
Projektentwicklung GmbH
Bonnenberg + DrescherProjektentwicklung GmbH
Industriepark Emil MayrischD – 52457 Aldenhoven
acoustic gas temperature measurement system agam
manfred.deuster@budi.dewww.info@budi.deTelefon: 0049-(0)2464-5810Fax: 0049-(0)2464-58136
Bonnenberg+ Drescher
Projektentwicklung GmbH
2
Bonnenberg+ Drescher
Projektentwicklung GmbH
C = speed of sound
T = “true" gas temperature
M = molecular weight
R = universal gas constant
æ = specific heat
T = 1000 °C C = 686 ±±±± ? m/s
TM
RC .
.æ=
3
Bonnenberg+ Drescher
Projektentwicklung GmbH
temperature = 1000 °c
speed of sound = 686 ±±±± ? m/s
CO2 = 18-14 Vol. %O2 = 2 - 6 Vol. %CO = 100-1000 mg/Nm3
H2O = 19-21 Vol. %dust = 10-15 g/Nm3
unaccuracy < 1,5 %
±±±± 5 m/sgas composition (lignite)
4
Bonnenberg+ Drescher
Projektentwicklung GmbH
acoustic gas temperature measurement system
TM
RC .
.æ=
4 Transceiver, 6 paths 8 Transceiver, 21 paths
6 Transceiver, 12 paths 8 Transceiver, 24 paths
5
Bonnenberg+ Drescher
Projektentwicklung GmbH
6
Bonnenberg+ Drescher
Projektentwicklung GmbH
Transceiver unit
7
Bonnenberg+ Drescher
Projektentwicklung GmbH
transition cone
8
Bonnenberg+ Drescher
Projektentwicklung GmbH
Transceiver unit above SNCR
Transceiver unit below SNCR
9
Bonnenberg+ Drescher
Projektentwicklung GmbH
PCU
Außenansicht Innenansicht Rückwand
Innenansicht Tür
10
Bonnenberg+ Drescher
Projektentwicklung GmbH
PCU and evaluation unit (2 lines) (19“ rack)
11
Bonnenberg+ Drescher
Projektentwicklung GmbH
Evaluation unit(19“ rack)
12
Bonnenberg+ Drescher
Projektentwicklung GmbH
3 evaluation units (one 19“ rack)
13
Bonnenberg+ Drescher
Projektentwicklung GmbH
13Bi directional measurement of an acoustic path
wasteaux. Burner
(gas)
14
Bonnenberg+ Drescher
Projektentwicklung GmbH
15
Bonnenberg+ Drescher
Projektentwicklung GmbH
16
Bonnenberg+ Drescher
Projektentwicklung GmbH
configuration at the furnace exit in 800 to 930 MWel.lignite with display of temperature results (isothermal
map and deviation from average in 4 zones),
furnace exit
100 m
OFA 3
OFA 2
OFA 1
burner level 2
burner level 1
30 m
17
Bonnenberg+ Drescher
Projektentwicklung GmbH
results of temperature balancing control in waste to energy (AZN Moerdijk)
600
700
800
900
1000
1100
120000:0
0
01:3
9
03:1
8
04:5
8
06:3
7
08:1
6
09:5
5
11:3
4
13:1
2
14:4
7
16:1
5
17:0
1
17:4
6
18:3
0
19:1
4
19:5
8
20:4
2
21:2
6
22:1
0
22:5
6
23:4
1
time
tem
pera
ture
in
°C
without agam control with agam control
18
Bonnenberg+ Drescher
Projektentwicklung GmbH
temperature differences between front and rear wall in a hard coal furnace
Backwall
Frontwall
∆T
in
K
12
3
4
65
7
8
19
Bonnenberg+ Drescher
Projektentwicklung GmbH
Bonnenberg + DrescherProjektentwicklung GmbH
Industriepark Emil MayrischD – 52457 Aldenhoven
acoustic gas temperature measurement system agam
Your Local Contact:Hitech Systems & Services LtdWhite House 119,Park StreetKolkata-700016 IndiaTel;91-11-22290045 Fax;91-11-22291264E-mail: info@hitech.inweb:www.hitech.in
Bonnenberg+ Drescher
Projektentwicklung GmbH