ACCC® ConductorImproving the Efficiency, Capacity and Reliability of the Grid
Deployed to over 475 project sites in 40 countries by over 150 utilities
• Privately held Delaware Corporation • Headquartered in Irvine, California• R&D began in 2003• Trial Lines Installed in 2004• Commercially Deployed in 2005• ISO Certified Production in 2006• Stranding Partners Worldwide• 43,000 km at over 475 project sites
CTC Global Corporation
ACCC
Its hybrid carbon fiber core is 70% lighter and 50% stronger than steel. Its has a coefficient-of-thermal-expansion about 10 times less than steel. This allows the use of 28% more aluminum which helps increase capacity, improve efficiency & mitigate thermal sag.
High Performance Conductor for a Modern Grid
Greater Strength & Reduced Sag
Higher Ampacity Limits at Cooler Temperatures
Able to Tolerate N-1 Conditions
Increased Spans on Fewer / Shorter Structures
Proven Reliability with Reduced Line Losses
Selected as the Most Cost Effective Solution
High-Capacity, Low-Sag ACCC Offers:
The world’s most efficient conductor
10 years of Installation & Operating Experience
Carbon Fiber Widely Utilized
High Strength, Light Weight & Excellent Resistance to Cyclic Load Fatigue
0
10
20
30
40
50
60
70
80
0 20 40 60 80 100 120 140 160 180 200 220 240 260
Cab
le S
ag (I
nche
s)
Temperature (C)
ACCC
GAP
Invar
ACCR
ACSS
ACSR
How Does it Compare to Other Conductors?
Comparison testing performed by Hydro One on a 65 meter span, 1600 amps, Drake size
Cooler operating temperatures underscore improved efficiency and reduced losses
Example of sag differences in the field (UK)
Substantial Experience 43,000 km at 475 project sites
Over 45,000 Dead-Ends & Splices in service
Countries:• USA• China• France• UK• Poland• Spain• Scotland • Portugal• Mexico• Chile• Qatar• Indonesia• Belgium• Brazil• Germany• South Africa• South Korea• Russia• Costa Rica
• India• Columbia• Congo• Ireland• Mozambique• Netherlands• Nigeria• Vietnam• Australia• Malaysia• Croatia• Kazakhstan• Panama• Estonia• Laos• Serbia• New Zealand• Paraguay• Bangladesh*
Utah, USA
Reconductor Project
Project Name: PacifiCorp 90 South to Oquirrh, UtahProject Goal: Increase Ampacity (use existing structures) Conductor Size: Drake Conductor Length: 30 kmVoltage: 138 kVEnergized: 2005Over 100 existing structures saved
Kansas, USA
New Line
Project Name: Kingman to Cunningham, KansasProject Goal: Install New Line Conductor Size: Hawk Conductor Length: 108 kmVoltage: 34.5 kVEnergized: 2006
Nevada, USA
Heavy Ice Application
Project Name: NV Energy Line 107 (Reno to Carson City)Project Goal: Increase Ampacity (existing structures) Conductor Size: Linnet Conductor Length: 90 kmVoltage: 120 kVEnergized: 2009
Mexico Bay
Corrosive Marine Environment
Project Name: CFE Carmen to NoresteGoal: Increase ampacity reduce line sag, avoid corrosionConductor Size: HawkConductor Length: 32 kmVoltage: 230 kVEnergized: 2009
Chile
Long Span Application
Project Name: Chilectra El Salto to Torre 8 LineProject Goal: Increase Ampacity – (existing structures)Conductor Size: LinnetConductor Length: 28 kmVoltage: 110 kVEnergized: 2009
Spain
Wind Farm Link
Project Name: NEO Energia 80 turbine upgradeProject Goal / Type: Increase Ampacity (existing structures)Conductor Size: AmsterdamConductor Length: 57 kmVoltage: 66 kVEnergized: 2008
Germany
Extra High Voltage Application
Project Name: Amprion GmbhProject Goal / Type: Trial LineConductor Size: Oslo (bundled)Length: 8.6 kmVoltage: 400 kVEnergized: 2009
Nevada, USA
Extreme Wind Survival
Project Name: NV Energy Line 107 (Reno to Carson City)Project Goal: Increase Ampacity (existing structures) Conductor Size: Linnet Conductor Length: 90 kmVoltage: 120 kVEnergized: 2009100+ mph Winds: 2010 Conductor Undamaged
Nevada, USA
Fire Storm Survival
Project Name: NV Energy Line 107 (Reno to Carson City)Project Goal: Increase Ampacity (existing structures) Conductor Size: Linnet Conductor Length: 90 kmVoltage: 120 kVEnergized: 2009Firestorm: 2012 – ACCC CONDUCTOR UNDAMAGED
Portugal
River Crossing
Project Name: River MondegoProject Goal: Increase Amps - Reduce Sag Conductor Size: AmsterdamSpan Length: 475 MetersVoltage: 60 kVEnergized: 2012
Fujian Provence, China
Typhoon Survival (2,600’ spans)ED
Tornado Toughness
UKFrance
California
Kansas
Ice & Wind Load Testing
A few of CTC’s International Customers:
Why Did These Utilities Choose ACCC?
Because, after discovering its technical merits and evaluating its durability, it provided the most economical solution for their specific projects
The Value of Line Loss Reduction
Reduced line losses saves money… every year
The Value of Generation Capacity Savings
Reduced line losses reduces generation capacity investmentIt is much less expensive to save energy than it is to produce it
The Value of Emission Reduction
Reduced line losses reduces fuel consumption …and associated emissions
Average car in US = 4.7 mt CO2 / scenario 1 = 13,513 cars / scenario 2 = 53,313 cars
345 kV Line – Replace ACSR with ACCC
• Increased line capacity by 75% with 625 amp emergency reserve• Reduced line losses by 30%• Line loss reduction saves 141,580 MWh / year (=$7.1M @ $50/MWh)• Emission reductions saves 83,316 Metric Tons CO2 / year• This equates to removing over 17,500 cars from the road• Line loss reduction also frees up over 17 MW of generation ($17 M+)
Notes: Double bundled Drake conductor. Load factor Assumption = 34% Texas State Average CO2 = 1.297# / kWh. (1 car = 4.75 MT CO2 / year) Cost of wire ~ $15.4M Assuming installation cost of $18.6 M – total project cost $34 Million Equals ~$285,000 per circuit mile (WECC Estimate basis)
120 Circuit Mile AEP Project Example
ACCC has become the first conductor in history to receive certification and validation for improved energy efficiency
• Over 7,000 circuit miles of ACCC in service • Estimated 3.4 Million Metric Tons CO2 saved annually• The equivalent of removing over 700,000 cars• Cumulative CO2 savings of over 12.5 Million Metric Tons
Environmental Impact… so far (December 2015)
Cost-Effective CO2 Emission Reduction Solution
-1,000
0
1,000
2,000
3,000
4,000
5,000
6,000
ACSR Retrofit
ACSS Retrofit
Landfill Gas
Biomass
Photovoltaic
Fuel Cells
Solar Thermal
Wind
Nuclear
Geotherm
al
NGCC
ACCC Retrofit
Metric Tons of Carbon saved (added)* per year per $1M Capital investment
* Savings vs. equivalent NG fired plant at 1.12 lbs/KWh and 75% Capacity (wind=35%, hydro=50%). Savings for transmission based on replacing “Drake” sized ACSR constrained line with Drake ACCC - resulting from lower line losses and CO2 emissions at NG generation pollution rates Source: US Dept of Energy 2005 and 2007 studies.
Replacement of a constrained transmission line with ACCC™ conductor saves more CO2 emissions per invested dollar than all other “clean” generation options or transmission solutions
ACCC™ is quick to market and requires limited capital commitment vs:
NGCC = $564M / 2yrsNuclear = $2.8B / 6yrsWind = $60M / 3yrsSolar = $315M / 3yrs
(Source: Energy Information Administration, 2007)
It is cheaper to save a “NEGAWATT” than it is to produce a MEGAWATT
• Over 60 standard conductor sizes• New ULS conductors for extreme spans• Design & Engineering Support• 24/7 Customer Service• Installation Training & Support• Extensive Engineering Database
GLOBAL Support
ACCC Engineering Manual:Helpful resource for understanding the unique attributes of ACCC Conductor
Stay Informed with our Monthly Newsletters:
CCP Software Program:
ACCC® ConductorImproving the Efficiency, Capacity, Reliability & Resilience of the Grid
CTC Global2026 McGaw Avenue Irvine, California 92614 USA+1 (949) 428-8500 www.ctcglobal.com