DEF(AUST) 5679A Rough Guide
Matthew Squair
www.criticaluncertainties.com
2 November 2014
1
1 Introduction
2 The DEF (AUST) 5679 safety requirements
3 System integrity assessment
4 Components design & implementation assurance
5 Equivalence with other standards
6 Independent safety evaluation
7 COTS criticality assessment
8 Experience and feedback
9 Changes
10 Conclusions and references
2
DEF(AUST) 5679 A User’s guide
Nulka, the first project to use DEF(AUST) 5679
3 Introduction
Why a rough guide?
This guide represents lessons learned in the application of the standard
As all standards are interpreted there is, inevitably, a likelihood that theusers interpretation does not exactly reflect the writers intent
This guide discusses some of the area’s of ambiguity and interpretation, aswell as delving into ’how to do it’
We’ll be discussing Issue 1 of the standard (1998). Issue 2 was publishedin 2008. That’s because that’s when I wrote this document :)
4 Introduction
The history of the standard
Originally published in August 1998 by the then Army Engineering Agency
Developed by DSTO to address perceived shortfalls in the then extant setof system and software safety standards
A system standard it considers people, hardware and software althoughthe focus is on software
Published after an extensive period of consultation with variousgovernment, defence, industry and academic experts
In practice its used by Army and Navy
Air Force still cleaves to DO-178 for software and MIL-STD-882C forsystem safety
5 Introduction
A comparison with MIL-STD-882D
MIL-STD-882D is a goal based standard
Focus on broad principles
Not prescriptive as to method and processes applied
Eight general system safety requirements
No detailed requirements, up to the program manager to define
Task descriptions such as Design and Integration in Annex A
Inherently requires tailoring
DEF (AUST) 5679 is a process based standard as the authors did notbelieve the time was right to move to a goal based standard
Does not allow tailoring
Considers operators as an integral part of the system
Process and task specific
6 Introduction
Safety caseProvides detailed requirements for a safetycase
Requires a component level of design(SW, HW & human)
Use of a high level argument (can usegoal structuring notation)
Supporting documents (analyses) e.gPHAR, SHA, SIAR etc
Progressive review (safety assessmentgroup, independent assessor (interim))
Section 11.4 of the standard cross referencesother standard document requirements tothe DEF (AUST) 5679 safety case
7 The DEF (AUST) 5679 safety requirements Safety case
Preliminary hazard analysis
PHA defines system boundary, accidents and their severity
Focus is on the system, it’s interaction with the environment and externalevents and how these can combine to cause an accident
Interfaces establish the system boundary
The set of system functions defines the scope of the system
The system functions also serve to define the system interfaces and thusthe boundary
Anything outside the system which can affect it are termed the operationalcontext
8 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
HRI and LOT mismatch
Problem: Accident severities may not match the safety program’s ororganisational definition of the severity component of risk
Example - The RAN’s Hazard Risk Index severities versus 5679:
Example (RAN) accident severity and and 5679 mismatch
Problem 1: Only hazards to personnel covered by 5679 not eqpt or mission
Problem 2: Probabilities are not expressed in terms of duration of exposure
9 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
HRI and LOT mismatch (part II)
What to do about it:
Use subzone in the risk matrix to capture multiple fatalities, i.e. ’Ia’oraugment the risk matrix with a multiple fatalities row
Define the exposure duration for risk
Add equipment and mission targets to LOT definition
10 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
Preliminary hazard analysis (cont’d)
System hazards are identified which are top level system states from whichan accident could result (sometimes in combination with a set of externalevents termed an accident sequence)
Quantitative assessment of hazard likelihood is excluded
Each system hazard generates safety requirements:
System Safety Requirements = Hazard X should not occur
Level of Trust (LOT) assigned for each accident sequence, hazardtuple
LOT = f(severity, external mitigators)
A default LOT is selected if we do not know the probability of ahazard propagating to an accident
The LOT matrix therefore needs to correlate with the organisational riskmatrix contours
11 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
HRI and LOT matrices mismatch (example)LOT matrix does not correlate to the RAN’s Hazard Risk Index
Treatment contours do not strictly correlate to traditional iso-riskcontours
Difficult to correlate between hazard risk zone and LOT selected
Example (RAN) risk matrix and and 5679 LOT matrix mismatch
12 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
LOT to risk reduction problems
This makes it difficult to argue from a LOT backwards to show that thesoftware hazard now has a reduced likelihood and therefore a reduced risk
How do we argue from a LOT back to a level of risk reduction?
What then is the safety claim, e.g ’residual risk of a software hazard’,being made?
13 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
Harmonisation of HRI and LOT (example)What to do about it:
Harmonise DEF AUST 5679 LOT zones with the risk matrix
Bin* both severity and probability ranges into qualitative ranges
Define the duration of exposure i.e. X years of system life
Harmonisation of LOT with example (RAN) risk matrix
14 The DEF (AUST) 5679 safety requirements Preliminary hazard analysis
System hazard analysis (analysis part)
System Hazard Analysis (SHA)
System decomposed to components (human, hardware & software)
Establishes component hazards that could lead to a system hazard
Component level hazard = Component Safety Requirement
Decompose and allocate system safety requirements to components
Component Y should not cause system hazard X
15 The DEF (AUST) 5679 safety requirements System hazard analysis
System hazard analysis (design part)
SHA includes architectural requirements
Analysis is a bit of a misnomer as SHA contains system design activities
Architecture safety requirements 14.3.10/12
14.3.10 Localise and isolate safety critical functions
14.3.10 Keep as small as possible
14.3.10 Separately identified functions
14.3.10 Keep as simple as possible
14.3.12 Loosely coupled
16 The DEF (AUST) 5679 safety requirements System hazard analysis
Strengths and weaknesses of the process
Thoroughness and completeness (effects to causes)
But your Hazards list scales up with number of components
Does not identify requirements incompleteness/inconsistency as a hazard
Dormant specification fault
Upto 70% of all software related accidents originate with specificationerrors
SHA doesnt address traditional common cause effects
Zonal hazard analysis?
Dependence of hardware (common power supplies, cabling etc)
See DEF STAN 00-56 (the early issues) for how these can be covered
17 The DEF (AUST) 5679 safety requirements System hazard analysis
DEF(AUST) 5679 accident sequence model
Models are important, they define what we pay attention to and what wedon’t
Standard is not clear on:
Can multiple hazards lead to the same accident?
Can one hazard can lead to multiple accidents?
Hazard propagation within system
Excludes environmental hazards but allows environmental mitigators(which is inconsistent)
18 The DEF (AUST) 5679 safety requirements Accident sequence model
DEF(AUST) 5679 accident sequence model
DEF(AUST) 5679 original accident sequence
19 The DEF (AUST) 5679 safety requirements Accident sequence model
An alternative accident sequence model
Work by J.C Laprie as part of IEEE-CS TC on Fault-Tolerant Computing in1970 and IFIP WG 10.4 produced a set of standard terms and definitions:
Fault. A fault is the adjudged or hypothesised cause of an error
A fault is active when it produces an error otherwise it is dormantFaults can be grouped as, design, physical or interaction
Error. An error is that part of the system state that may cause asubsequent failure
Error propagation. Within a given component (i.e., internalpropagation) is caused by the process: an error is successivelytransformed into other errors
Failure. A system failure is a transition event that occurs when thedelivered service deviates from correct service and results in a systemfault state
20 The DEF (AUST) 5679 safety requirements Accident sequence model
An alternative accident sequence model (Part II)
Giving us:
Hazard. A sequence of faults, events and error states causally linkedto an accident
Accident. A system failure with defined loss conditions (fault states)
Accident sequence. The set of events and intermediate states thatpropagate a system hazard state to an accident
21 The DEF (AUST) 5679 safety requirements Accident sequence model
An alternative accident sequence (part III)
Accident sequence based on Laprie (IFIP WG 10.4)
22 The DEF (AUST) 5679 safety requirements Accident sequence model
Accident sequence issues
Standard does not allow qualitative assessment of external events
But this may be all you have
Also introduces an inconsistency in arguing between qualitative versusquantitative criteria
What to do about it:
Develop quantitative probability bins and equate them to a qualitativecriteria ala MIL-STD-882
Using the qualitative likelihood reduce the LOT by one level for eachdecade in reduced likelihood
Apply the no more than 2 levels rule to this means of reducing LOT
23 The DEF (AUST) 5679 safety requirements Accident sequence model
Safety Assurance Level (SAL) assignment
There are six SAL’s corresponding to the six LOT’s:
De minimis SAL is equivalent to LOT associated to CSR
Defined by a set of design & analysis techniques
This is also a circular argument, and a weakness of SAL’s in general
Each SAL has design and implementation requirements
Protective measures are assigned to reduce the LOT:
Undesirable to have components with a SAL of 4 or higher
Can only reduce a SAL two levels i.e. SAL5 to SAL3
If you start with a SAL 6 component you can only reduce it to SAL 4
The rules imply redesign of the system architecture
Operator components should not be allocated a SAL higher than 3
If so then their use must be justified in the safety case
24 System integrity assessment Safety integrity levels
Rules for assigning SALs
Can reduce SALs through employing independent components
Independence argument must be part of the justification for a SALassignment that relies on it
Techniques
Redundancy (function and data)
Design redundancy (i.e. dissimilar techniques)I Cannot be used alone to reduce the SAL value
Safety kernel
Use of lower software control categories i.e. requiring operator inputI Can reduce the SAL of the control component value by oneI Cannot be used alone to reduce the SAL two levels below the default
SAL
Software that can be user modified must be assigned a SAL of 0
Again there is an implied architectural design step
25 System integrity assessment SAL assignment rules
LOT to SAL flowdown
26 System integrity assessment SAL assignment rules
Component design assurance
Design assurances objective is to reduce to the minimum the likelihood ofdesign flaws that could cause hazardous faults
Flaws is an interesting term, used through the standard but not defined
For discussion we’ll treat flaws as a latent design fault
Component System Assurance Levels (SALs)
Formal, rigorous etc terms are defined in standard
Note the amalgamation of SAL levels into common assurance strategies
27 Components design & implementation assurance
SALs - some questions
Assumption that formality costs more, but some case studies indicate not?
What is the acceptable level of design faults?
Should the safety specification be separated from the softwarespecification?
Is indirect traceability acceptable for design verification?
28 Components design & implementation assurance
Component implementation assurance
The objective of implementation assurance is to reduce to the minimumthe likelihood of detail design and implementation flaws that could causehazardous faults
What are detailed design products? Not specified in the standard
What is detailed, ”that which follows the PDR and precedes CDR”?
See below for a definition of preliminary versus detailed design in an OODcontext
Preliminary versus detailed software design
29 Components design & implementation assurance
Component implementation assurance
Three component classes are defined (does not include procedures)
Three generic safety case patterns are discussed
Allows separation of concerns and a modularised safety case
30 Components design & implementation assurance
Software assurance
Of the three, software is the most well developed
As with design assurance there is a significant watershed at SAL3,4
Notionally each SAL is an order of magnitude greater if so why doesonly one attribute differentiate SAL 5 from 6?
SAL aggregation for tests does not follow that of other softwareattributes
31 Components design & implementation assurance Software assurance
Operator assurance
Only training and skill level requirements are specified
These are not independent, nor are they the only factors!
In the real world we also use:
Currency e.g. ’hours flown lately’ is important especially for experts
Independent certification e.g. ’check rides’ and the like
Personnel selection and psychological aptitude tests
Procedures are not covered as a separate component class
But errors in procedures can lead to hazards and accidents...
Should be given their own CSR
32 Components design & implementation assurance Operator assurance
Operator assurance
Human error is difficult to predict, but not random
We need a reasonable process of identifying possible human error that atleast includes:
A formal model of human error
Error affordances (procedure design, simple errors, mode confusion,decision bias)
Workload including management of the HMI
Performance shaping factors (fatigue, lighting, stress etc)
Team interaction effects
33 Components design & implementation assurance Operator assurance
Operator assurance
What to do about it:
Augment existing assurance requirements including:
I Task analysis and allocation (more than just Fitts list)I Error analysisI Defensive techniquesI Team dynamics/interaction design (including the software agent)
For design conduct human error analysis (informal (S1,S2), semiformal (S3,S4) & formal (S5, S6))
Address procedures in operator SAL tasks, or develop separate CSRfor procedures
Use interfaces to establish human factors contracts between operatorand hardware/software
34 Components design & implementation assurance Operator assurance
Hardware assurance
Even more austere than operator assurance, revolves around hardwareverification from informal to formal
Focuses on custom hardware not Non Development Items (NDI)
NDI hardware implicitly covered in section 11.2 of the standard
For lower integrity levels (S1,2) provide evidence the componentmeets the supplier specification
For higher levels (>S3) treat as a developmental item,but section6.4.2.2 states
Clause 6.4.2.2
For non-custom (NDI) hardware, it is required that reliable, thoroughlytested and robust equipment is used. Such equipment must be analysedwith respect to safety, including the potential interaction betweencomputing systems.
35 Components design & implementation assurance Hardware assurance
Hardware assurance
There appears to be some confusion in the NDI(xOTS) definitions
On paper provides little incentive to select a simple hardware design tospecifically replace a complex software design
36 Components design & implementation assurance Hardware assurance
NDI integrity level ambiguity resolution
Partial solution to NDI (COTS/MOTS) integrity level ambiguity
See xOTS section for further discussion
37 Components design & implementation assurance Hardware assurance
General comments and recommendations on SALs
Definition of SAL requirements is not entirely convincing
No transparency in the standard as to how they were arrived at
Focuses on process i.e. test coverage versus outcome i.e. freedom fromfaults (i.e. N faults per 1000 SLOC)
A risk of people ’gaming’ the standard (but DEF(AUST) 5679 is not alonein this, all risk based integrity level standards suffer from this problem)
Simplicity requirement (para 3.3.3) is not linked to SALs
38 Components design & implementation assurance Hardware assurance
General comments and recommendations on SALs
What to do about it:
Simplify LOT and SAL zones in line with risk matrices such as thosein MIL-STD-882 or DEF STAN 00-56
SAL assignments should be independently assessed and approved tominimise ’gaming’
Define a critical fault density level e.g. ’0.1 per KSLOC’ for SAL 6
Let the developer select the methods to achieve same
Clarify and supply missing definitions if invoking the standard
Require simple software e.g a McCabe Cyclomatic Complexity Metricof < 20 for safety critical modules 1
1But refer to Les Hattens work on what really works as an indicator39 Components design & implementation assurance Hardware assurance
Equivalence with other standards
Its not
Because of 5679s rigour it is difficult to argue equivalence
Some guidance on other standard tasks that may equate to DEF(AUST)5679 is provided in table 1 of Part 2 Section 11
DEF STAN 00-55 (cancelled) is probably closest in process structure
The standard does not allow tailoring making it difficult to argueequivalence at a process level
ALARP principles are not invoked (or SFAIRP)
Does not allow acceptance of higher risk by a higher authority as perMIL-STD-882
40 Equivalence with other standards
Equivalence with other standards
Its not
Because of 5679s rigour it is difficult to argue equivalence
Some guidance on other standard tasks that may equate to DEF(AUST)5679 is provided in table 1 of Part 2 Section 11
DEF STAN 00-55 (cancelled) is probably closest in process structure
The standard does not allow tailoring making it difficult to argueequivalence at a process level
ALARP principles are not invoked (or SFAIRP)
Does not allow acceptance of higher risk by a higher authority as perMIL-STD-882
40 Equivalence with other standards
Equivalence with other standards
Its not
Because of 5679s rigour it is difficult to argue equivalence
Some guidance on other standard tasks that may equate to DEF(AUST)5679 is provided in table 1 of Part 2 Section 11
DEF STAN 00-55 (cancelled) is probably closest in process structure
The standard does not allow tailoring making it difficult to argueequivalence at a process level
ALARP principles are not invoked (or SFAIRP)
Does not allow acceptance of higher risk by a higher authority as perMIL-STD-882
40 Equivalence with other standards
Equivalence with other standards
The equivalence problem is significant
In Australia we spend very little time developing a system from scratch
Mostly we take an existing product and tailor it to our unique needs
The project is not the systems ’parent’ but the parent of a change to thesystem, usually coupled with a different role and environment
Safety programs for modified systems:
start with an existing safety baseline
evaluate whether changes introduce new hazards
evaluate whether changes are removing existing hazard controls
41 Equivalence with other standards
Equivalence with other standards
What to do about it:
Don’t argue equivalence of process:
Instead consider whether the application of another standard hasachieved the required outcome
Base the safety argument around a change management process
Obtain agreement to work with the existing systems safety standard& case from the regulator or independent safety evaluator
Based on the extant safety case it is assumed the system is safe
The intent of any change is to maintain the current levels of (accepted)risk. Analyse changes individually and as a cohort for:
New hazards introduced
The reduction in control and mitigation measures for extant hazards
42 Equivalence with other standards
Independent audit and certification
Auditor function
Independent of the developer and acquirer
Monitors the safety management process
Acts as the independent arbitrator
Tasks the evaluator to evaluate the safety case
Evaluator
Actually a body rather than a single person
Checks the detail and validity of the Developers arguments that thesystem will meet its safety critical requirements
There may also be a certifier role (i.e. TAR, DOS)
43 Independent safety evaluation
Independent audit and certification
Staged and independent evaluation of the safety case
Independence of the evaluator must be demonstrated
No commercial/management relationship with projects safetymanagement group
No involvement in the system development
Formal evaluation reports are required:
Describes evaluation activities
Findings of each activity
Identifies specific recommendations and concerns
Recommendations (Essential, desirable and optional)
Standard implies that these are binding on all parties (possibly contentious)
Needs to be made an explicit clause of the contract
44 Independent safety evaluation
’x’ Off The Shelf (xOTS)
Many similar terms (COTS, MOTS, GOTS, NDI2 & SOUP3)
DEF(AUST) 5679 does not deal comprehensively with xOTS
So what is ’Off The Shelf’?
COTS is:
sold, leased, or licensed to the general publicoffered by a vendor trying to profit from itsupported and evolved by the vendor, who retains IP rightsavailable in multiple, identical copies used withoutmodification of the internals[Mayer & Oberndorf 01]
The paradigm according to Tim Kelly [Ye & Kelly 04]
The attraction is...
they were developed by someone else
The problem is...they were developed by someone else
2Non Developmental Item3Software of Uncertain Pedigree
45 COTS criticality assessment
’x’ Off The Shelf (xOTS)
Many similar terms (COTS, MOTS, GOTS, NDI2 & SOUP3)
DEF(AUST) 5679 does not deal comprehensively with xOTS
So what is ’Off The Shelf’?
COTS is:
sold, leased, or licensed to the general publicoffered by a vendor trying to profit from itsupported and evolved by the vendor, who retains IP rightsavailable in multiple, identical copies used withoutmodification of the internals[Mayer & Oberndorf 01]
The paradigm according to Tim Kelly [Ye & Kelly 04]
The attraction is...they were developed by someone else
The problem is...they were developed by someone else
2Non Developmental Item3Software of Uncertain Pedigree
45 COTS criticality assessment
’x’ Off The Shelf (xOTS)
Many similar terms (COTS, MOTS, GOTS, NDI2 & SOUP3)
DEF(AUST) 5679 does not deal comprehensively with xOTS
So what is ’Off The Shelf’?
COTS is:
sold, leased, or licensed to the general publicoffered by a vendor trying to profit from itsupported and evolved by the vendor, who retains IP rightsavailable in multiple, identical copies used withoutmodification of the internals[Mayer & Oberndorf 01]
The paradigm according to Tim Kelly [Ye & Kelly 04]
The attraction is...they were developed by someone else
The problem is...
they were developed by someone else
2Non Developmental Item3Software of Uncertain Pedigree
45 COTS criticality assessment
’x’ Off The Shelf (xOTS)
Many similar terms (COTS, MOTS, GOTS, NDI2 & SOUP3)
DEF(AUST) 5679 does not deal comprehensively with xOTS
So what is ’Off The Shelf’?
COTS is:
sold, leased, or licensed to the general publicoffered by a vendor trying to profit from itsupported and evolved by the vendor, who retains IP rightsavailable in multiple, identical copies used withoutmodification of the internals[Mayer & Oberndorf 01]
The paradigm according to Tim Kelly [Ye & Kelly 04]
The attraction is...they were developed by someone else
The problem is...they were developed by someone else
2Non Developmental Item3Software of Uncertain Pedigree
45 COTS criticality assessment
xOTS ’hazards’
xOTS doesn’t really introduce new software hazards but it does possesstraditional ones to a much greater degree than bespoke software:
xOTS usually does much more than you ask of it
Added complexity both from the COTS item and handlers
So the likelihood of getting into trouble is much greater, usually in theform of emergent interaction style hazards
Some other ’gotchas’ in COTS use:
There may be backdoors and attendant safety/security issues
There is the risk attendant on modifying without insight (integration)
There may be existing design faults, of which you are unaware
46 COTS criticality assessment
The safety challenge for xOTS
All of the preceding presents some fundamental problems for a safetyprogram:
How do we assure freedom from faults with little to no influence over(or insight) into the product
Manage context hazards i.e integration hazards
Preclude inadvertent interactions
Avoid or manage un-needed complicatedness or functionality
However in other domains COTS items are used all the time. For examplestandard bolts, rivets, lamps etc (usually built to a published standard)
47 COTS criticality assessment
Justifying xOTS safety
Role of historical / operational / usage data:
potentially the most compelling evidence
hard to get enough data, of adequate quality
Rough rules of thumb [Ye & Kelly 2004]. If operated N hours withouthazardous failure
50% confidence will operate safely for next N hours
90% confidence will operate safely for N/3 hours
Assumes random time independent failure (is this valid?)
Critical assumptions:
That the operational environment is representative (Design margins?)
That failures are logged and assessed (Active safety program?)
We neither add or modify functions nor correct design faults
48 COTS criticality assessment
Two distinct ways in which we apply xOTS
1 New start system which we want to future proof
2 Legacy systems which we want to refresh with COTS technology
New start systems lend themselves to architecture solutions
Objective is a fault coverage equivalent to a bespoke system
Dependably modify the system during development and sustainment
Legacy systems are more problematic
Inherently a greater risk
Greater effort involved
May have to modify the COTS component
49 COTS criticality assessment
Simplex Architecture (JSF, NSSN, F16 INSERT)
Use dynamic binding to allow components to be added/deleted at runtime
Replacement unit containers enforce firewalls for address space faults
Provide real time group communication
Dynamic real time resource management using GRMS theory
Use analytic redundancy to assure continued performance if COTScomponent or upgraded component fails
Partition each function into two domains that are analyticallyredundant:
High assurance simple functional kernel - MUST ALWAYS WORK
High assurance container for upgrades/COTS - MUST PERFORM
There are also significant payoffs in terms of maintenance and upgrade
50 COTS criticality assessment Simplex architecture approach - New start
Simplex Architecture (with annotated LOT & SALs)
51 COTS criticality assessment Simplex architecture approach - New start
Contract Based (x)COTS Product Selection (CBCPS)
Technology refresh of an existing architecture [Ye & Kelly 2004]
If we want safe xOTS we have to buy the right (safe) xOTS
Principal of a defined software contract established at acquisition
Three streams of parallel activities
xOTS assessment and acquisition
software engineering
safety engineering
52 COTS criticality assessment Contract Based COTS Product Selection (CBCPS) - Legacy
CBCPS process adapted to DEF(AUST) 5679
53 COTS criticality assessment Contract Based COTS Product Selection (CBCPS) - Legacy
CBCPS criticality assessment methodology
General method
Design process is used to generate evaluation criteria for COTS item
There is an explicit decision to use xOTS and manage attendant risksI Proactive approach, we don’t just ’buy then justify’I Assurance evidence will need to be tailored to the SAL
It may be necessary to modify the xOTS item to meet the SALI Modifiability should also be a criteria
54 COTS criticality assessment Contract Based COTS Product Selection (CBCPS) - Legacy
Industrial experience with the standard
The following projects have applied the standard
RAN Nulka EU2 Autopilot
Stonefish Exercise Mine
Navigation Display System
Digital Hydrographic Database
SEA 1429 Collins Class Replacement Combat System (partial)
55 Experience and feedback
Project/industry feedback on the standard
Comments received on Issue 1 and 2 of the standard:
Solid standard for development
Demanding at higher LOTs
How do we mantain 60 page spec in Z?
Initial support from DSTO required
Not as prescriptive as DEF STAN 00-55
NULKA safety case lacked design level
Acceptable for the WSERB?
Issue of financial independence of auditor, evaluators?
Simple and clear on application
How to use in sustainment not clear
Tailored application, endorsed by evaluator
56 Experience and feedback
Mooted changes [Cant et al. 2005]
Accident sequences to be clarified
Use of qualitative estimates of external mitigating factors
Better definition of what is meant by semi-formal and rigorous proofs
Removal of ability to modify the strength of assurance
Terminology changes
57 Changes
Conclusions
Though well thought through, the standard is still based on safety integritylevels, with all their problems:
Circular definition
Focus upon processes rather than outcomes
The number of SALs does not correlate to actions required
Problematice probability:
Ignores qualitative assessments
Does not consider units of duration for probability
Be prepared to tailor
Not much support for acquisition of xOTS solutions
Your certifier will need to approve tailoring of the standard
58 Conclusions and references
Bibliography
[Cant et al. 2005] Cant, T. Mahoney, B. and Atchison, B., Revision of AustralianDefence Standard DEF (Aust) 5679, 10th Australian workshop on Safety RelatedProgramming systems, Sydney, CRPIT, Vol XX. Tony Cant Ed., 2005.
[DEF (AUST) 5679 1998] DSTO, DEF(Aust) 5679, The Procurement ofComputer-Based Safety-Critical Systems, Defence Science and TechnologyOrganisation, Australia, Australian Defence Standard, Issue 1, August 1998.
[Mayer & Oberndorf 01] Meyer B. and Oberndorf P., Managing Software Acquisition:Open Systems and COTS Products Addison- Wesley, 2001.
[Ye & Kelly 2004] Ye, F., Kell, T., Criticality Analysis for COTS Software Components,University of York, York, UK, ISSC 2004.
59 Conclusions and references