Proposal for
Construction Estimating Services
High School Modernization Program
quandel.com
Higher Education ExperienceTable of Contents
quandel.com
1 |
2 |
3 |
4 |
5 |
6 |
Cover Letter
Methodology
Personnel
Consultants
K-12 Experience
Fee
Proposal for
Construction Estimating Services
High School Modernization Program
September 13, 2013
quandel.comquandel.comquandel.com
1 | Cover Letter
Building Integrity Since 1882
QUANDEL CONSTRUCTION GROUP, INC.
3003 North Front Street, Suite 201 Harrisburg, PA 17110
P 717.657.0909 | F 717.652.6282 hgmanning@quandel.com
quandel.com September 13, 2013 Mr. Ed Poprick Director of Physical Plant State College Area School District 131 West Nittany Avenue State College, PA 16801 Re: High School Modernization Program Construction Estimating Services Dear Ed: We were pleased to receive your Request for Proposal for Construction Estimating Services. We will be honored to represent the interests of your District. The following material describes our differentiating qualifications, school construction management staff experience and ability to successfully work with your project Team while providing the services you have requested and cost control results that your deserve. We offer you a unique choice, as evidenced by the information that follows:
Foremost, our proven experience as Construction Manager on 122 K-12 projects, within Pennsylvania, beginning in 1989, represents nearly $1.5 billion in construction value.
We were the first construction firm to specialize in the management of K-12 construction projects in Pennsylvania.
Our 131 years of experience as a general contractor provides a valuable complement to our services, particularly in the areas of design reviews, systems evaluations, constructability reviews and value engineering.
We have 23 LEED accredited professionals and 15 Green Advantage professionals on staff.
We have successfully managed the construction of 11 K-12 projects with Crabtree Rohrbaugh in a similar role. All were highly successful and several are repeat clients.
Our Professionals that you will be working with represent a total of 82 years of experience with Quandel.
All of the Team members listed in Section 3 have worked together on dozens of K-12 projects on similar assignments.
Through our continuous involvement in PASBO and PSBA events, we stay current on relevant trends and technology. Thank you for considering Quandel Construction Group. We hope to have the opportunity to discuss your High School Modernization Program and our credentials in further detail. Sincerely,
QUANDEL CONSTRUCTION GROUP, INC. H. Glenn "Bub" Manning, P.E. Principal kc
quandel.comquandel.comquandel.com
2 | Methodology
Estimating Process
Our Estimating Process is a proven, deliberate process of predicting future performance based on present criteria provided by
our clients. With nearly $1.5 billion of school construction management throughout Pennsylvania, our cost database enables
us to update projected cost of renovations, additions and/or new construction with exceptional accuracy. The procedure that
we use has been refined over many years, to provide a consistent format to minimize errors and assure accuracy. In managing
the overall project cost during the Estimating Process, we use software such as Excel, Timberline, Roctek (site work analysis),
SmartBid (subcontractor solicitation & notification) and On-Screen Take-Off. These software tools help the estimators
efficiently and effectively understand the quantities associated with your project and communicate this information to
potential subcontractors during the scope review process. Our Estimating Process is illustrated below:
A brief summary of the effort involved during the successive steps shown above follows:
Project Engagement – The decision has been made, by management, to pursue the opportunity and the estimating process is
initiated.
Scope Definition – Meaningful discussions have occurred with the District and Design Professionals about the building
program, location, scope of work, unique aspects of design, procurement strategy, strategies for success in estimating,
resource demands, roles and responsibilities of estimating team, etc.
Pre-Estimate Planning – Discussions occur on how the estimate will be compiled, e.g., low bid, negotiated opportunity,
conceptual budget, detail required, etc. Low bid opportunities require a higher level of detail and effort than conceptual
budgeting exercises. Estimate reviews are scheduled. Important subcontractors, suppliers, equipment vendors and other
project participants are identified and contacted.
Methodology
1quandel.com
PROGRAMENGAGEMENT
PRE-ESTIMATEPLANNING
QUANTITYTAKEOFFS
VALIDATION
MANAGEMENTINPUT
ESTIMATESUMMARY
COSTINGAPPLICATION
"ES
SCOPEDEFINITION
ESTIMATEFINALIZATION
PERFORMANCEFEEDBACK
OURESTIMATINGPROCESS
Methodology
2quandel.com
Quantity Takeoffs – A major internal effort is underway to understand and quantify the
project. The estimating team gathers all available scope definition and assembles the
details of the estimate (scoping). Takeoffs may be manual, but are increasingly
accomplished electronically with on-screen takeoff capabilities. Ambiguous or vague
details are noted. Qualifications, assumptions and potential adjustments are identified.
Costing Application & Quotes – It is during this phase that the financial composition of
the project begins to take shape. Initially, the financial input can vary from finite, or
certain, to best guess values – all to be confirmed or validated later. Direct and indirect
costs are quantified. Reality checks are performed against past history and market conditions. Contingencies are established,
although different costing conditions allow/permit different levels of contingency.
Estimate Summary – Comprehensive spreadsheet delineating all cost elements of the estimate or bid. This remains a working
document and the level of detail and certainty increases with time. The estimating and operations team may now focus on
critical evaluations of cost against schedule. With a more complete picture of the effort required to execute the project,
decisions on indirect, or support costs can be made.
Validation – All efforts during this phase are aimed at identifying and eliminating risk. Calculations are verified, coverage
across all disciplines assured and category ratios are confirmed as reasonable for the project. Peer reviews are conducted and
discussions occur between estimating staff assembling the estimate and operations staff who will be responsible for building
the project – they have to live with it!
Management Review – Projects are never executed exactly as the estimating team
envisioned them. They always turn out better or worse than expected – rarely with the
exact relationship of initial cost and final cost that was included in the estimate.
Management review and input serves to establish the official corporate offering for any
given opportunity. The experience of these individuals offers an unbiased view of the
estimate and fosters valuable discussions about the contents of the estimates and their
accompanying schedules.
Estimate Finalization – A formal document is produced providing the budget in the format required by the District. This is a
formal offering of our firm's services to complete a finite assignment. When appropriate, clarifications to the estimate are
clearly delineated, so the District knows:
§ What is included
§ What is excluded
§ What assumptions have been made
§ What clarifications are appropriate to define scope
§ What allowances are provided where not properly defined
Performance Feedback – Our proven management system allows for, and in fact encourages, constant input and feedback to
operations and accounting, to compare estimated versus actual performance on all projects. This information benefits
operations staff in their execution of the project, but just as importantly, adds value to our estimating function on future
opportunities with proven pricing information, unit costing, productivity, etc.
quandel.comquandel.comquandel.com
3 | Personnel
We have selected the following personnel to deliver our estimating services to State College Area School District, based on
their similar experience on other K-12 projects, time with Quandel and proven ability to work together. They are also
accustomed to working collaboratively with our school district clients, community advisory committees, Crabtree Rohrbaugh
and other design professionals.
You can also see that we are proposing a valuable combination of in-house talent in the disciplines of civil, architectural,
mechanical and electrical and field construction experience. The provision of our services will be led by John Koury, Project
Executive. John has been with Quandel for 23 years and oversees all of our K-12 construction management assignments,
which all have included comprehensive estimating.
Personnel
1quandel.com
Thank you for the contribution
you made to our successful
building project. Our new
elementary school is beautiful and
visible reminder of the
renaissance of excellence here at
Steelton-Highspire. Quandel was a
big part of making that happen
beginning with our relationship
with John Koury, your project
executive.Dr. Norma H. Mateer
Retired SuperintendentSteelton-Highspire School District
“
John E. Koury, CCM, LEED AP
2quandel.com
John has served in the construction industry since 1984, and has held a variety of assignments since
that time. A graduate engineer, John has large project experience on various types of building
products, including churches, healthcare, correctional and school facilities. He has been a member of TM the Quandel team since 1990. John is a Certified Construction Manager as well as a LEED Accredited
Professional.
Scranton School District Wellsboro Area School DistrictLincoln/Jackson Elementary Renovations Athletic Facilities Improvement Program
Scranton, PA Wellsboro, PA$5 Million $5 Million
Gettysburg Area School District Conrad Weiser Area School DistrictNew Middle School East Elementary School
Gettysburg, PA Alterations & Upgrades$35 Million Robesonia, PA
Contract Administrative ServicesDelaware Valley School DistrictNew Elementary School & Conrad Weiser Area School DistrictHigh School Addition West Elementary School
Milton, PA Additions & Renovations$24 Million Womelsdorf, PA
$18 MillionExeter Township School DistrictNew Owatin Creek Elementary School Wyalusing Area School District
Reading, PA New Elementary School$23 Million Wyalusing, PA
$21.1 MillionMidd-West School DistrictMiddleburg Elementary School Tulpehocken Area School DistrictAdditions & Renovations Bethel Elementary School
Middleburg, PA Additions & Renovations$18.5 Million Bethel, PA
$12.4 Million Midd-West School DistrictHigh School Additions & Renovations Central Dauphin School District
Middleburg, PA Central Dauphin East Middle School $34 Million Addition & Renovations
Harrisburg, PADallastown Area School District $18.6 MillionNew Intermediate School
Dallastown, PA Central Dauphin School District$49.8 Million Central Dauphin East High School
Alterations & AdditionsPleasant Valley School District Harrisburg, PAMiddle School Addition & Renovations $18.6 Million
Brodheadsville, PA$18 Million
Select Project Experience
Project Executive
EDUCATION
University of Pennsylvania Bachelor of Science Degree, Civil & Urban Engineering | 1984
AFFILIATIONS
CMAA (Construction Management Association of America) Member | 2006 to Present
Certified Construction Manager (CCM) | 2005 to Present
LEED Accredited Professional | 2008 to Present
LCI (LEAN Construction Institute) Member | 2012 to Present
Quandel Enterprises, Inc. Board of Directors
Modern Transit Partnership, Board Member | 2011
Easter Seals of Western & Central Pennsylvania, Board Member | 2010 to Present
Holy Name of Jesus Parish Eucharistic Minister | 2000 to Present
Holy Name of Jesus Religious thEducation Instructor 8 Grade
Confirmation | 2000 to Present
Knights of Columbus | 2000 to Present
John M. Murphy, LEED AP
3quandel.com
John has extensive experience in construction cost estimating, bidding, purchasing and value
engineering. His diverse capabilities include competitive bidding, conceptual estimating, utilizing in-
house historical cost data, construction systems and assemblies value analysis, contractor
prequalification and contract negotiations. John will oversee all estimating, purchasing and value TM engineering activity. John is a LEED Accredited Professional. He has 26 years of construction
industry experience and has been with Quandel since 1991.
Dallastown Area School District Exeter Township School DistrictNew Intermediate School New Owatin Creek Elementary School
Dallastown, PA Reading, PA$49.8 Million $23 Million
Dallastown Area School District Pleasant Valley School DistrictHigh School and Middle School Connecting Middle School Addition & Renovations Corridor Brodheadsville, PA
Dallastown, PA $18 Million$961,000
Central Dauphin School DistrictCentral Dauphin School District Swatara Middle School RenovationsCentral Dauphin Middle School Renovations Harrisburg, PA
Harrisburg, PA $11.7 Million$25.7 Million
Greencastle-Antrim School DistrictCentral Dauphin School District Facilities Improvement ProgramCentral Dauphin East Middle School Greencastle, PAAddition & Renovations $15.3 Million
Harrisburg, PA$18.6 Million Hazleton Area School District
Arthur Street ElementaryCentral Dauphin School District Hazleton, PALinglestown Middle School $2.8 MillionAddition & Renovations
Harrisburg, PA Wayne Highlands School District$14.9 Million New Elementary School and High School /
Middle School Additions & RenovationsCentral Dauphin School District Honesdale, PACentral Dauphin East High School $17 MillionAlterations & Additions
Harrisburg, PA Northeastern School District$18.6 Million Stadium Upgrades
Manchester, PA Gettysburg Area School District $408,000Facilities Improvement Program
Gettysburg, PA University of Scranton$44 Million New Loyola Science Center
Scranton, PAThe Commonwealth Medical College $82.5 MillionNew Commonwealth Medical College
Scranton, PA$115 Million
Select Project Experience
Vice President of Estimating
EDUCATION
Pennsylvania State UniversityBachelors of Architectural Engineering | 1989
AFFILIATIONS
U.S. Green Building Council | LEED Accredited Professional
Society of American Value Engineers (S.A.V.E.)
Board of Directors | Pennsylvania State University's Kappa Sigma Fraternity, Alumni Board
Board of Directors | United Cerebral Palsy of Central PA
Past Chairman of the Board | United Cerebral Palsy (UCP) of Central PA
Past Chairman of the Board | UCP Foundation of Central PA
Past Chairman | United Cerebral Palsy Golf Tournament
John J. Bashago
4quandel.com
John started his career in construction in 1969 as a carpenter apprentice. He has a number of years
of field experience as a carpenter and carpenter foreman. He joined Quandel in 1984 as a carpenter,
where his keen talents were observed by management, and he was promoted to an estimating
position. Since then, John has had experience as estimator, project manager and purchaser.
North Schuylkill School District School District of the City of YorkNew Elementary School New William Penn Sr. High School
Ashland, PA York, PA$17 Million $40 Million
Scranton School District Mahanoy Area School DistrictNew High School New School Facility
Scranton, PA Mahanoy City, PA$56 Million $9.4 Million
Gettysburg Area School District Wayne Highlands School DistrictFacilities Improvement Program Elementary / Middle School
Gettysburg, PA Damascus, PA$44 Million $3 Million
Gettysburg Area School District Wayne Highlands School DistrictAdditions & Renovations to 2 Elementary Middle / High School Schools Honesdale, PA
Gettysburg, PA $5 Million$8 Million
Bucks County Technical School AuthorityWilson School District New Vocational-Technical SchoolNew Elementary School / Fairless Hills, PAHigh School Additions & Renovations $38 Million
West Lawn, PA $24.1 Million University of Scranton
New Patrick & Margaret DeNaples Commonwealth Medical Education Corp. Student CenterNew Medical College Scranton, PA
Scranton, PA $34.8 Million$115 Million
East Stroudsburg University of PennsylvaniaUniversity of Scranton New Science & Technology CenterNew Rehabilitation Center East Stroudsburg, PA
Scranton, PA $23 Million$35 Million
Lock Haven UniversityUniversity of Scranton Student Recreation CenterNew Loyola Science Center Lock Haven, PA
Scranton, PA $6.2 Million$82.5 Million
EDUCATION
Bloomsburg State College 1967 to 1969
Marian High School | 1967
Attended continuing education courses sponsored by the following:
The Pennsylvania State University | Schuylkill Campus & Hazleton Campus
The Hartford Graduate Center
Temple University
Keystone District Council of Carpenters
Achievement Alliance
Select Project Experience
Senior Estimator
Douglas J. Aldinger, PE, LEED AP (BD+C)
5quandel.com
Doug has 38 years of mechanical engineering and design experience and has served as the principal
MEP Design Engineer on numerous projects. He will utilize his MEP expertise in assessing the MEP
systems selected for the project. He has focused on finding and developing energy strategies,
projects, and portfolios for clients. Doug will also be involved in our MEP estimating process, bidding TM process and quality control during construction. He is also a Professional Engineer and a LEED
Accredited Professional since 2002.
Tulpehocken Area School District Whitehall-Coplay Area School DistrictBethel Elementary School Gockley & Steckel Elementary SchoolsAdditions & Renovations Comprehensive Energy Study
Bethel, PA Whitehall, PA $12.4 Million $10 Million
Lower Dauphin School District Newport School DistrictLower Dauphin Middle School Newport Middle/High School
Hummelstown, PA Newport, PA$15 Million $22 Million
East Pennsboro Area School District Berwick School DistrictMiddle School Improvements Berwick Middle School HVAC Replacement
Enola, PA Berwick, PA$1.8 Million $2.5 Million
East Pennsboro Area School District Greenwood School DistrictMiddle School Auditorium Improvements Elementary School Alterations
Enola, PA Millerstown, PA$750,000 $2.0 Million
Milton Hershey School Selinsgrove Area School DistrictPurcell Friendship Hall Renovation Elementary School Addition & Renovations
Hershey, PA USGBC LEED Silver Certified$5.0 Million Selinsgrove, PA
$14.1 MillionNewport School DistrictAddition & Alterations Selinsgrove Area School DistrictUSGBC LEED Silver Certified High School Addition & Renovations
Newport, PA USGBC LEED Silver Certified$19.5 Million Selinsgrove, PA
$9.1 MillionJuniata Area School DistrictBoilers Repairs and Replacements Gettysburg Area School District
Millerstown, PA Gettysburg Area Middle School$1.1 Million Gettysburg, PA
$35.0 MillionCommonwealth of VirginiaPepco Performance Contract Midd-West Area School DistrictValidation of Work Prince William & Midd-West High SchoolMontgomery Co. Schools Middleburg, PA
Various Sites, VA $34 Million $5.0 Million
EDUCATION
Pennsylvania State UniversityBachelors of Science in Mechanical Engineering Technology | 1983
Harrisburg Area Community CollegeAssociate Degree in Civil Engineering Technology | 1974
Professional Engineer Licensed in PA, NY, MD and NJ
LEED Accredited Professional Building Design + Construction
AFFILIATIONS
Chair, Commonwealth Recycled Energy and Economic Development Alliance
Vice Chairman, Association of Energy Engineers of Central PA
Hawk Mountain Boy Scout Council Advisory Board
ASHRAE Member; Keystone ABC Green Building Education Subcommittee Chairperson
Association of Energy Engineers, Senior Member
Cogeneration & Distributed Generation Institute of AEE, Senior Member
Alternative & Renewable Energy Development Institute, Senior Member
Green Building Association of Central Pennsylvania, Member (former Vice Chairperson)
Select Project Experience
Vice President of MEP SystemsMEP Design Review
Rick Shank
6quandel.com
Rick has served in the construction industry for 40 years. His skills in running efficient and timely
projects have made him a very valuable member of the Quandel team. He has served as a carpenter,
Director of Buildings & Grounds, construction manager, project manager, project superintendent
and is experienced in all facets of construction. Rick has been with Quandel since 2004.
Gettysburg Area School District Gettysburg Area School DistrictNew Middle School Franklin Township Elementary School
Gettysburg, PA Renovations$35 Million Gettysburg, PA
$5.2 MillionThe Hershey CompanyHershey 19 East Offices Gettysburg Area School District
Hershey, PA James Gettys Elementary School Renovations$6 Million Gettysburg, PA
$1.2 MillionCentral Dauphin School DistrictCD East High School Additions & Alterations Northeastern School District
Harrisburg, PA New Middle School$6.6 Million Manchester, PA
$27 MillionTuscarora School DistrictAddition & Renovations to James Buchanan Northeastern School DistrictMiddle School, Mountain View and New Intermediate SchoolMontgomery Elementary Schools Manchester, PA
Mercersburg, PA $15.8 Million$16.2 Million
Greencastle-Antrim School DistrictLower Dauphin School District Middle School RenovationsNye Elementary School Greencastle, PA
Hummelstown, PA $3 Million$2.4 Million
Greencastle-Antrim School DistrictGettysburg Area School District High School Addition & RenovationsJames Gettys Elementary School Alterations Greencastle, PA
Gettysburg, PA $8.3 Million$1.1 Million
Greencastle-Antrim School DistrictGreencastle-Antrim School District Greencastle-Antrim Primary School AdditionGreencastle-Antrim Primary School Greencastle, PA
Greencastle, PA $3 Million$5.6 Million
Greencastle-Antrim School DistrictLower Dauphin School District Elementary School AlterationsHigh School and Middle School Greencastle, PAAlterations & Additions $1 Million
Hummelstown, PA$2.5 Million
EDUCATION
South Hagerstown High School | Graduated 1971
CERTIFICATION
30 Hour OSHA Certification
Select Project Experience
Project SuperintendentConstructability Review
quandel.comquandel.comquandel.com
4 | Consultants
Consultants
1quandel.com
Quandel will not be using any
consultants, as we have the internal
capability to provide all services
requested within your Request for
Proposal.
quandel.comquandel.comquandel.com
5 | K-12 Experience
Quandel Construction Group was chosen to be Gettysburg Area School District’s Construction
Manager to oversee the construction of their new Middle School, which will contain 34 classrooms,
an auditorium, gymnasium, auxiliary gymnasium, locker rooms, cafeteria with food court, kitchen,
media center, Tech Ed room and lab, Family Consumer Sciences, band, orchestra and choral rooms
as well as an Administration Area. The total new two-story, 188,000 square foot Middle School will
be built adjacent to the existing middle school. The project value is approximately $36,000,000.
Construction is anticipated to be complete for the start of the 2014 school year. This is Quandel's
eighth consecutive assignment for this District.
Owner:Larry R. ReddingSuperintendent
Gettysburg Area School District900 Biglerville Road
Gettysburg, PA 17325717.334.6254
lredding@gettysburg.k12.pa.us
Architect: Anthony Colestock
Project ManagerCrabtree Rohrbaugh & Associates
401 East Winding Hill RoadMechanicsburg, PA 17055
717.458.0272acolestock@cra-architects.com
Anticipated Completion Date: November 2014
Project Size: 188,500 SF
27 Acres1,200 to 1,400 Students
Percent New and Renovation:New 100%
Renovation 0%
Final Construction Cost:Projected $32,000,000
Total Project Cost:Projected $33,212,000
Estimates Delivered:Design Development $35,064,500
Construction Document $33,212,000
Gettysburg Area School District
1
quandel.com
Project:
New Middle School
The additions and renovations to Franklin Township
Elementary School consisted on a new 3,000 square foot
addition and renovation to the existing 63,000 square foot
school. The addition consisted of three new kindergarten
classrooms. Renovations included the complete removal of
the existing HVAC system and replacement, plumbing
upgrades in restrooms, a complete lighting and fire alarm
upgrade, replacement of the existing automated
temperature control system, abatement of the existing
gym floor and replacement, and kitchen renovations, including new equipment. All classrooms
received new ceilings, light fixtures and countertops.
stThe project was a phased renovation beginning in November and completing on August 21 .
Owner: Larry R. Redding
SuperintendentGettysburg Area School District
900 Biglerville RoadGettysburg, PA 17325
717.334.6254lredding@gettysburg.k12.pa.us
Architect: Robert J. Nesbit
Construction Field AdministratorCrabtree Rohrbaugh & Associates
401 East Winding Hill RoadMechanicsburg, PA 17055
717.458.0272bnesbit@cra-architects.com
Completion Date: August 2013
Project Size: 66,000 SF
400 Students
Percent New and Renovation:Addition 5%
Renovation 95%
Final Construction Cost:$4,100,000
Total Project Cost: $4,800,000
Estimates Delivered:Design Development $5,254,037
Construction Document $4,628,739
Gettysburg Area School District
2quandel.com
Project:
Franklin Township Elementary School Renovatons
Quandel completed interior renovations to the Cafeteria and Kitchen at James Gettys Elementary
School. These renovations included the complete demolition of this space and re-orientation of
the Cafeteria and Kitchen to allow for natural daylight into the Cafeteria.
Also include was the installation of walk-in coolers and freezers for food storage, installation of a
new kitchen hood and make-up air system to improve energy efficiency, existing concrete slab
removal and replacement with upgraded floor finishes, and new serving lines and orientation.
The project was completed on a tight time schedule over summer as the District did not have the
option of shutting the Kitchen down for an extended period of time while students were in session.
Owner: Larry R. Redding
SuperintendentGettysburg Area School District
900 Biglerville RoadGettysburg, PA 17325
717.334.6254lredding@gettysburg.k12.pa.us
Architect: Mark Barnhardt
Crabtree Rohrbaugh & Associates401 East Winding Hill RoadMechanicsburg, PA 17055
717.458.0272mbarnhardt@cra-architects.com
Completion Date:August 2012
Project Size: 4,741 SF
Percent New and Renovation:New 100%
Renovation 0%
Final Construction Cost:$1,190,000
Total Project Cost:$1,490,000
Estimates Delivered:Design Development $1,000,000
Construction Document $1,200,000
Gettysburg Area School District
3quandel.com
Project:
James Gettys Elementary School Renovation
Quandel was contracted by Conrad Area School District to manage the additions and renovations to
West Elementary School, located in Womelsdorf, Berks County, PA.
The project included construction of a full-size Gymnasium as well as additions to the Kindergarten,
Library/Media Center, Administration and Kitchen/Café areas. Renovations occurred throughout
the entire existing building including upgrades to the electrical and mechanical systems. This was a
LEED Silver project and included the installation of a geothermal well system.
Quandel also served as the Construction Manager for Conrad Weiser Area School District for a
major renovation program to their Middle School.
Owner:Mr. Eric Lutz
Director of FacilitiesConrad Weiser Area School District
44 Big Spring RoadRobesonia, PA 19551
610.693.8507e_lutz@conradweiser.org
Architect: Mr. John R. Hill, AIA
Muhlenberg Green Architects, Ltd.400 Washington Street
Reading, PA 16901610.376.4927
jhill@mgarchitects-ltd.com
Completion Date:October 2012
Project Size: 98,000 SF
New 16,000 SFRenovation 82,000 SF
Percent New and Renovation:New 16%
Renovation 84%
Final Construction Cost:$18,259,000
Total Project Cost:Projected $22,000,000
Estimates Delivered:Design Development $17,502,000
Construction Document $18,285,000
Conrad Weiser Area School District
4quandel.com
Project:
West Elementary School Addition & Renovations
Photo byMuhlenberg Green Architects
Quandel provided construction management services for Midd-West School District’s additions
and renovations to their Middleburg Elementary School, located in Middleburg, PA.
(Leadership in Energy and Environmental Design)
Quandel also completed the Midd-West School District High School addition and renovation
project.
The elementary school project consisted of 51,200 square feet of renovations and 60,200 square
feet of new construction. The facility includes a new cafeteria and kitchen facilities, classroom and
administrative additions, additional parking and playground areas.
This $18.5 million project will achieve LEED
certification.
Owner:Dr. Wesley Knapp
SuperintendentMidd-West School District
568 East Main StreetMiddleburg, PA 17942
570.837.0046wknapp@mwsd.cc
Architect: Mr. Jeffrey Straub, AIA, LEED AP
Crabtree Rohrbaugh & Associates401 East Winding Hill RoadMechanicsburg, PA 17055
717.458.0272JStraub@cra-architects.com
Completion Date:August 2013
Project Size: 111,400 SF
Percent New and Renovation:New 54%
Renovation 46%
Final Construction Cost: $22,205,000
Total Project Cost:Projected $25,500,000
Estimates Delivered:Design Development $18,631,000
Construction Document $18,631,000
Relevant Information:Additional scope added after bids to
completely replace the roof structure, insulation drains and
membrane roof system. Also added scope to completely abate and fill in
concealed existing pipe tunnels.
Midd-West School District
5quandel.com
Project:
Middleburg Elementary School Additions & Renovations
quandel.comquandel.comquandel.com
Relevant K-12 Experience
CENTRAL DAUPHIN SCHOOL DISTRICTTotal Building Program - $127.9 Million- New High School - $40 Million- Central Dauphin Middle School Renovations - $25.7 Million- Central Dauphin East Middle School Addition & Renovations - $18.6 Million- Central Dauphin East High School Additions & Renovations - $17 Million- Linglestown Middle School Addition & Renovations - $14.9 Million- Swatara Middle School Renovations - $11.7 MillionHarrisburg, PAMr. Gilbert Tunney, Director of Buildings & Grounds(717) 545-4703
K-12 Experience
1quandel.com
WILSON SCHOOL DISTRICTTotal Building Program - $121.5 Million- New Green Valley Middle School - $43.9 Million- Senior High School Addition - $21.9 Million- New Green Valley Elementary School - $13.5 Million- Cornwall Terrace Elementary School - $12.2 Million- New Shiloh Hills Elementary School - $8.7 Million- Spring Ridge Elementary School - $7.4 Million- Southern Junior High School Additions - $7.3 Million- Central Junior High School - $6.6 MillionWest Lawn, PAMr. Larry Bortz, Director of Plant Management(610) 670-9640
K-12 Experience
2quandel.com
SCRANTON SCHOOL DISTRICTTotal Building Program - $98.5 Million- New High School - $56 Million- New Isaac Tripp Elementary School - $20 Million- New Whittier Elementary School - $9 Million- JFK Elementary School Addition & Renovations - $8 Million- Lincoln/Jackson Elementary School Renovations - $5 Million- Scranton Memorial Stadium - Phase 3 - $3.2 Million- Memorial Stadium Renovations - $2.3 MillionScranton, PAMr. Gregg Sunday, CFO(570) 348-3496
GETTYSBURG AREA SCHOOL DISTRICTTotal Building Program - $95.3 Million- New High School - $38 Million- New Middle School - $35 Million- Renovate Existing High School into Middle School - $11 Million- Franklin Township Elementary Schools Renovations - $5.2 Million- Eisenhower Elementary School Renovations - $4.9 Million- James Gettys Elementary School Renovations - $1.2 MillionGettysburg, PAMr. Brad Hunt, Business Manager(717) 334-6254
K-12 Experience
3quandel.com
MIDD-WEST SCHOOL DISTRICT Total Building Program - $52.5 Million- High School Additions & Renovations - $34 Million- Middleburg Elementary Additions & Renovations - $18.5 MillionMiddleburg, PADr. Wesley Knapp, Superintendent(570) 837-0046
WHITEHALL-COPLAY SCHOOL DISTRICT Total Building Program - $51.5 Million- Whitehall High School Additions & Alternations - $28 Million- New Zephyr Elementary School - $19.5 Million- Transportation Building - $5 MillionWhitehall, PAMr. Gary J. Behr, Director of Operations & Transportation(610) 439-1431
DALLASTOWN AREA SCHOOL DISTRICT Total Building Program - $57.7 Million- New Intermediate School (Grades 4-6) - $49.8 Million- Alterations to Loganville-Springfield Elementary and Leader Heights Elementary Schools - $4.5 Million- Photovoltaic Solar Panels - $2.4 Million - H.S. & M.S. Connecting Corridor - $961,000Dallastown, PAStewart Weinberg, Ph.D., Superintendent(717) 244-4021
NORTHEASTERN SCHOOL DISTRICT Total Building Program - $43.9 Million- New Middle School - $27 Million- New Intermediate School - $15.8 Million- High School Connecting Corridor - $700,000- Stadium Upgrades - $408,000Manchester, PADr. Robert Tabachini, Superintendent(717) 266-3667
Copyright Crabtree, Rohrbaugh & Associates – Architect
K-12 Experience
4quandel.com
CONRAD WEISER AREA SCHOOL DISTRICTTotal Building Program - $35 Million- Conrad Weiser Middle School Alterations - $17 Million- West Elementary School Additions & Renovations - $18 Million- East Elementary School Contract Administration Robesonia, PAMr. Eric A. Lutz, Director of Facilities (610) 693-8507
K-12 Experience
5quandel.com
WYALUSING AREA SCHOOL DISTRICT New Elementary School - $21.1 MillionWyalusing, PAMr. Ray Fleming, Superintendent (570) 746-1605
EXETER TOWNSHIP SCHOOL DISTRICT New Owatin Creek Elementary School - $23 MillionReading, PADr. Beverly A. Martin, Superintendent(610) 779-0700
Gold LEED Certification
DELAWARE VALLEY SCHOOL DISTRICT New Elementary School & High School Addition - $24 MillionMilford, PADr. Candis Finan, Superintendent(570) 296-1800
PLEASANT VALLEY SCHOOL DISTRICTMiddle School Addition & Renovations and WWTP Facility Upgrades - $18 MillionBrodheadsville, PAMr. Chris Fisher, Assistant Superintendent(570) 402-1000 x1201
CAREER & TECHNOLOGY CENTER OF LACKAWANNA COUNTYTechnical School Addition & Renovations - $20 MillionScranton, PAMr. Vincent P. Nallo, Administrative Director(570) 342-8471
K-12 Experience
6quandel.com
TULPEHOCKEN AREA SCHOOL DISTRICT Bethel Elementary School Addition/Renovations - $16 MillionBethel, PADr. Edward Albert, Superintendent(610) 933-4611
AVON GROVE CHARTER SCHOOLKemblesville Elementary School Improvements - $6.7 MillionWest Grove, PAMs. Donna Archer, Business Manager(484) 667-5001
WELLSBORO AREA SCHOOL DISTRICTAthletic Facility Improvement Program - $5 MillionWellsboro, PAMr. Christopher R. Morral, Superintendent (570) 724-0303
K-12 Experience
7quandel.com
quandel.comquandel.comquandel.com
6 | Fee
Fee
1quandel.com
Quandel’s fixed fee to provide the Estimating
Services requited within your Request for Proposal
(RFP), including reimbursable expenses, is $30,000.
Additional services required by the District outside
of those defined in your RFP will be billed at cost or
in accordance with the attached list of hourly billing
rates.
State College Area School District Billing Rates Page 1
Staff Direct Personnel Billing Rates Fixed Rates for Additional Services to March 1, 2014 Vice President ................................................................................................................................................... $175/Hour Senior Project Manager ..................................................................................................................................... $160/Hour Project Manager 2 ............................................................................................................................................. $130/Hour Project Manager 1 ............................................................................................................................................. $110/Hour Project Engineer ................................................................................................................................................ $85/Hour Project Superintendent ...................................................................................................................................... $130/Hour Assistant Project Superintendent ...................................................................................................................... $125/Hour General Superintendent .................................................................................................................................... $150/Hour Vice President of Operations ............................................................................................................................. $175/Hour Corporate Safety Directory ................................................................................................................................ $130/Hour Vice President of Estimating.............................................................................................................................. $140/Hour Senior Estimator ................................................................................................................................................ $130/Hour Estimator ........................................................................................................................................................... $110Hour Senior Scheduler ............................................................................................................................................... $130/Hour Scheduler .......................................................................................................................................................... $110/Hour Accountant......................................................................................................................................................... $75/Hour Project Administrator ......................................................................................................................................... $75/Hour Non-Staff Reimbursable Billing Rates Fixed Rates for Additional Services to March 1, 2014 Office Trailer Package - PM @ Home Office .............................................................................................. $650/Month Vehicle Mileage (Allowable per IRS regulations)........................................................................................ $0.565/Mile Superintendent Pick-Up Truck (Superintendent mileage included in monthly rate) ................................... $7.50/Hour Plain Paper Fax Machine - Job Site ........................................................................................................... $60/Month Copier ......................................................................................................................................................... $100/Month Computer System ...................................................................................................................................... $250/Month All rates will be escalated by 5% on March 1, 2015 All rates will be escalated, again, by 5% on March 1, 2016
quandel.com