A DYNAMIC AND MODERN COMPANY ACTING FOR ROMANIAN … · A DYNAMIC AND MODERN COMPANY ACTING FOR...

Post on 06-Sep-2019

0 views 0 download

Transcript of A DYNAMIC AND MODERN COMPANY ACTING FOR ROMANIAN … · A DYNAMIC AND MODERN COMPANY ACTING FOR...

A DYNAMIC AND MODERN COMPANY ACTING FOR

ROMANIAN ROADS

Gura Humorului, June 14th 2011Eugen C. FLORESCU, Ph.D.

Technical Manager – Iasi Bypass

VEGA 93 Galati is recognised on the civil engineering market as a very stable and strong company by means of the civil, administrative and industrial buildings that were made at a special qualitative level with a modern architecture.

At the very beginning of its activity, Vega 93 was acting on building works and hydro technical field.

Viva Club in Galati – your

perfect destination for

business or leisure…do not

miss it if you travel to Galati !

As the Romanian market changed and evolved, we had to adapt our vision and strategy to new reality, and to develop (mainly since 2006) the branch of roads and bridges construction.

The turnover of the company evolved as follows:

…and we expect to reach 100 M euros in 2011, mainly due to our bridge and roads activity.

Indicator 2006 2007 2008 2009 2010

Turnover lei 191.673.579 230.754.489 266.110.768 373.709.795 356.099.029

Turnover euro 56.679.652 63.917.370 66.794.759 88.385.080 83.037.736

Bridges – with precast beams

Bridges – with post-stressed beams

High productivity concrete and asphalt plants

Modern equipment and trucks adapted for earthworks

On site crushing equipment for foundation layer

Fabrication and laying gravel stabilized with road binders

Reinforced soil with geogrid

Vega 93 – vector for sustainable development- Use of granulated slag for foundation layers

Vega 93 – vector for sustainable development- Cold recycling of old road structures

Cold recycling of a rigid pavement in Iasi using foamed bitumen

The most valuble resource – our people• We are 2200 people proudly working in Vega 93• Management: - general manager

- economical manager - 1- marketing manager - 1- technical manager - 3

• Production: - Chief Engineers – 2- project managers – 6

• working points supervisors (engineers, sub engineer, foremen) – 35

• expert on roads and bridges – 1• expert on public acquisitions – 4

Iasi Bypass – site in progress…• Iasi – one of the largest cities in Romania, 400.000 people• Technical figures:

– length 14 km– Earthworks 450,000 cum– Granular layers 120,000 cum– Asphalt 50,000 tons– Ditches and gutters 22,000 m– Drainage 5,400 m– Bridges/overpass 8 pcs (1600 m)– Environmental devices 12 pcsA section of 6 km is in use, 8 km to be finished by the end of

this year.

...remaining bombs from the World War 2...

Constant support from local and central

authorities

June 2009

October 2009 August 2010

Your trustworthy Romanian partner

Gura Humorului – in the very heart of Romanian spirituality

(Voronet Monestery)

…the famous Dracula Castle…not very far!

Thanks for your kind attention !