Post on 28-Jan-2016
04/22/23 1
How Bangkok Port tackle with How Bangkok Port tackle with Climate ChangeClimate Change
04/22/23 2
OutlinesOutlines
Port Traffic managementPort Traffic management
Activities concernedActivities concerned
Green AreaGreen Area
Cargo HandlingCargo Handling
National PolicyNational Policy
Policy StatementPolicy Statement
04/22/23 3
National PolicyNational Policy
Ministry of Natural Ministry of Natural Resources and Resources and EnvironmentEnvironment
Thailand Greenhouse Gas Thailand Greenhouse Gas Management Org. (Public )Management Org. (Public )
Office of Natural Office of Natural Resources and Resources and
Environmental Policy and Environmental Policy and PlanningPlanning
Climate Change Climate Change Management Management
National National Strategy PlanStrategy Plan
2009-20122009-2012
Sustainable Sustainable Management Management
of Green of Green Space in Space in
Urban Area Urban Area 20072007
National Climate Change National Climate Change Policy CommitteePolicy Committee
National Environmental National Environmental Management CommitteeManagement Committee
4
Sustainable Management of Green Space Sustainable Management of Green Space in Urban Area, 2007in Urban Area, 2007
Green Area for Government Sector Green Area for Government Sector
Revise concerned law and regulation Revise concerned law and regulation
Encourage Private SectorEncourage Private Sector
Economic MotivationEconomic Motivation
Local Local Government Government
Capacity BuildingCapacity Building
Public Public AwarenessAwareness
Climate Change Management Climate Change Management National Strategy Plan 2009-2012National Strategy Plan 2009-2012
• Strategy 1 Increasing the capacity for adaptation and risk Strategy 1 Increasing the capacity for adaptation and risk reductionreduction
• Strategy 2 Reduction of GHG emission/ increasing of Strategy 2 Reduction of GHG emission/ increasing of absorption mechanismabsorption mechanism
• Strategy 3 promoting research and development on Strategy 3 promoting research and development on consequence of climate changeconsequence of climate change
• Strategy 4 Public relation and supporting role on climate Strategy 4 Public relation and supporting role on climate change problem solvingchange problem solving
• Strategy 5 Capacity building for institute and personnel Strategy 5 Capacity building for institute and personnel concernedconcerned
• Strategy 6 International cooperationStrategy 6 International cooperation
04/22/23 5
Source of Emission from Port Source of Emission from Port ActivitiesActivities
• Emission from vesselEmission from vessel
• Emission from harbor shipEmission from harbor ship
• Emission from cargo handling equipmentEmission from cargo handling equipment
• Emission from cargo truckEmission from cargo truck
04/22/23 6
Measures undertakenMeasures undertaken
• Cargo handling equipment standard -EURO IIICargo handling equipment standard -EURO III• Increasing green areaIncreasing green area• Activities concerned promotion of Activities concerned promotion of
environmental awarenessenvironmental awareness• Port Traffic Management PlanPort Traffic Management Plan• Review the Port Safety, Health and Review the Port Safety, Health and
Environmental Policy StatementEnvironmental Policy Statement
Cargo Handling Equipment Cargo Handling Equipment Standard - EURO III Standard - EURO III
Emission of CO2 from 2.72 g/kg to 0.64 g/kgPM from 0.14 g/kg to 0.05 g/kg
Electric Folk liftElectric Folk lift
Gantry CraneGantry Crane
04/22/23 10
Increasing green area (Internal)Increasing green area (Internal)
• The Thai Government introduce a new The Thai Government introduce a new policy concerned the environment.policy concerned the environment.
• Green space up to 30% of it’s total area. Green space up to 30% of it’s total area.
• Bangkok Port, as a state enterprise has Bangkok Port, as a state enterprise has adopted this policy by launching a 5 year adopted this policy by launching a 5 year project for increasing green space.project for increasing green space.
พื้��นที่�� (1)
พื้
• พื้��นที่�� (1)
พื้��นที่�� (2)
พื้��นที่�� (2)
พื้��นที่�� (3)
Increasing green area (External)Increasing green area (External)
• Mangrove ForestMangrove Forest
Bird Observation TowerBird Observation Tower
Activities concerned Activities concerned Environmental AwarenessEnvironmental Awareness
• An exhibition “Love our World, Help tackle An exhibition “Love our World, Help tackle Climate Change”Climate Change”
• Campaign to reduce car uses Campaign to reduce car uses
“ “Cycling to Protect our World”Cycling to Protect our World”
““Love our World, Help tackle Love our World, Help tackle Climate Change”Climate Change”
““Cycling to Protect our World”Cycling to Protect our World”
Port Traffic Management PlanPort Traffic Management Plan
• Project under the project “Sustainable Port Project under the project “Sustainable Port Development in the ASEAN Region”Development in the ASEAN Region”
• Aims to assess the existing traffic situationAims to assess the existing traffic situation
• Prepare a streamlined emission inventory Prepare a streamlined emission inventory – Emission Reduction Plan– Emission Reduction Plan
• Work program for Port Traffic Work program for Port Traffic management Planmanagement Plan
Activities covered by this projectActivities covered by this project• Collection and analysis of existing Collection and analysis of existing
informationinformation
• Critical assessment of existing traffic Critical assessment of existing traffic management systemmanagement system
• Identification and description of operation Identification and description of operation efficiency and performance problemefficiency and performance problem
• Preparation of streamlined emission Preparation of streamlined emission inventoryinventory
• RecommendationsRecommendations
Recommendations
• Short term – low cost measureShort term – low cost measure
• Medium term – significant changeMedium term – significant change
• Long term – major changeLong term – major change
Review the PSHE Policy Review the PSHE Policy StatementStatement
• Added a statement indicated that Bangkok Added a statement indicated that Bangkok Port is willing to improve the quality of air Port is willing to improve the quality of air and best use of energy. and best use of energy.