Post on 07-Apr-2017
1
Continuity and Resilience (CORE)
ISO 22301 BCM Consulting Firm Presentations by speakers at the
5th Middle East Business & IT Resilience Summit 20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033 Fax: ++91 11 41055535
Email: neha@continuityandresilience.com
Continuity and Resilience
P. O. Box 127557 Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530 Tel: +971 2 8152831 Fax: +971 2 8152888
Email: info@continuityandresilience.com
Please write to us if you would like to get in touch with the Speaker
Why Projects Fail
All rights reserved to Pillar Total Solutions s.a.l.
Material extracted from PMBOK® Guide, is PMI copyright and used with their permission .
Conducted by:
Imad Jomaa
3
Your Host
• Imad Jomaa.
• Education:
o Telecommunications & Electronics Engineer – 1980 – Cairo
University
• Employers:
o Pillar Total Solutions s.a.l. (PTS) Beirut (since 2010), The National
Commercial Bank (NCB) – Jeddah (24 years), CHUBB Alarms – Jeddah,
Schlumberger – Shetland Islands – Oil Rigs.
• Professional Certifications:
o PMP , ITIL, COBIT , TOGAF9.1, Management Consulting Essentials.
4
Your Host – 2
• Professional Memberships:
o Syndicate of Lebanese Engineers (OEA), IEEE, PMI , PMO CoP,
ISACA – Lebanon Chapter – Vice President, KOUDOURAT (NGO)
Anti Unemployment Association – Member of Executive Committee,
Chartered Management Institute , Association of Enterprise
Architects (AEA), Lebanese Management Association (LMA).
5
What is Work?
• Work involves either operations (routines) or
projects.
6
What are Operations?
• Operations are an organizational
function performing the ongoing
execution of activities that
produce the same product or
provide a repetitive service.
7
What is a Project?
• As per the definition of PMI
(Project Management
Institute), a project is a
temporary endeavor
undertaken to create a
unique product, service, or
result.
8
The Project Challenge – Your Plan
9
The Project Challenge – Reality
10
• Lack of a senior management support.
• Weak Change or transition
Management.
• Poor project management.
• Business politics & Power Struggle.
Reason for Projects’ Failure – 1
11
• Ignoring Risk Management.
• Unrealistic:
o timelines or schedules.
o Budget.
o Scope or requirements.
Reason for Projects’ Failure – 2
12
• Lack of Team members commitment.
• Unclear roles and responsibilities.
• Poor communication.
• Scope creep.
Reason for Projects’ Failure – 3
13
• Under estimating the complexity of the project.
• Lack of end-user involvement.
• Stakeholders conflict.
• Lack of prioritisation.
Reason for Projects’ Failure – 4
14
• Inadequate testing processes.
• Not meeting expectations.
• Insufficient resources.
• Bad decisions.
Reason for Projects’ Failure – 5
Q & A Thank You
16
Continuity and Resilience (CORE) ISO 22301 BCM Consulting Firm Presentations by speakers at the
5th Middle East Business & IT Resilience Summit 20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033 Fax: ++91 11 41055535
Email: neha@continuityandresilience.com
Continuity and Resilience
P. O. Box 127557 Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530 Tel: +971 2 8152831 Fax: +971 2 8152888
Email: info@continuityandresilience.com
Please write to us if you would like to get in touch with the Speaker