3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco-...

Post on 03-Jan-2016

215 views 2 download

Tags:

Transcript of 3 RIP thematic categories: 11th Sept 2014, Varna (BG) I.Eco-Voucher schemes to foster eco-...

3 RIP thematic categories:

11th Sept 2014, Varna (BG)

I. Eco-Voucher schemes

to foster eco-management

and eco-innovation

Speakers: PL, CZ

II. Cluster development

for eco-innovation & eco-

management

Speakers:UK, SI

III. Stakeholder platform

for eco-innovation & eco-

management

Speakers:EE, AT

Regional Implementation Plans

I. Eco-Voucher schemes to foster eco-management and eco-innovation

Improvement of existing voucher schemesby

Kujawsko-Pomorskie Region Rafał Modrzewski

(PL, PP 02)

11th Sept 2014, Varna (BG)

RIP themes

* The Polish RIP THEME visualised *

A picture says more than 1.000 words

311th Sept 2014, Varna (BG)

I. WHY

The need for:

co-operation

innovation

knowledge transfer

411th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

Promoting regional R&D potential

Open for external SMEs

Pro-ecological services and products

511th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

good practice from the South Moravian

Innovation Center

Study visits and meetings with experts

Thematic talks with regional stakeholders

611th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

final version accepted

key stakeholders engaged

possible financing from regional and national

programmes

711th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

ROP manual – more specific info

Elaboration of criteria

Contest for operator

811th Sept 2014, Varna (BG)

* The Polish RIP THEME visualised *

A picture says more than 1.000 words

911th Sept 2014, Varna (BG)

I. Eco-Voucher schemes to foster eco-management and eco-innovation

Business Voucher schemeby

EkoportJan Jareš

(CZ, PP 04)

11th Sept 2014, Varna (BG)

RIP themes

* The Czech RIP THEME visualised *

A picture says more than 1.000 words

1111th Sept 2014, Varna (BG)

I. WHY

lack of collaboration between R&D and

industry

no tool / incentive available

level of transferability / simplicity

allready existing in other CZ regions

1211th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

RIP describes current situation and future goals including concrete measures (voucher schemes) best practices examples from other CZ regions action plan and management „eco“ enhancements possibilities risk analysis sustainability

1311th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

by initial monitoring of available tools

(Greenovate!)

by other regions in CZ – workshop in Brno

1411th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

just finalised document (study) elaborated by external expert (Subsidia)Regional Authority and Council have approved

and allocated ca 50k eur for the first call (October 2014)

RECOMMEND helped to initiate, establish and launch pilot voucher scheme in South Bohemia (www.inovoucher.cz)

1511th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

evaluation of the first call (2014)

monitoring of project implementations (2014 /

2015)

preparation of the second call (2015)

eco-enhancement (2015)

1611th Sept 2014, Varna (BG)

* The Czech RIP THEME visualised *

A picture says more than 1.000 words

1711th Sept 2014, Varna (BG)

II. Eco-Cluster developmentfor eco-management & eco-innovation

Eco-management Cluster

byOpportunity Peterborough

Rod Gilchrist

(UK, PP 09)

11th Sept 2014, Varna (BG)

RIP themes

* The British RIP THEME visualised *

A picture says more than 1.000 words

1911th Sept 2014, Varna (BG)

I. WHY

Lack of SME advice and support

Need to stimulate eco innovation and

efficiency

Need to improve networking and share good

practice

2011th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

Improve SME networking via Future City Demonstrator project

Provide additional advice support to SMEs via 2014-20 LEADER or ESF/ERDF funding

Utilise domestic/EU funding streams to stimulate eco innovation and efficiency

2111th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

Advice, presentations and good practice shared by Lead partner

Partner visits during Working Summits

Field mission to Estonia showed what can be acheved through partnership

2211th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

Local Enterprise Partnership involved

Future City Demonstrator project to progress work

Recommend is informing LEADER bid

2311th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

Future City Demonstrator Project

LEADER Programme

Local Enterprise Partnership

2411th Sept 2014, Varna (BG)

* The British RIP THEME visualised *

A picture says more than 1.000 words

2511th Sept 2014, Varna (BG)

II. Eco-Cluster developmentfor eco-management & eco-innovation

Eco-Innovation Cluster (Bionics)

byLEA Spodnje Podravje

Uroš Majerič

(SI, PP 05)

11th Sept 2014, Varna (BG)

RIP themes

* The Slovenian RIP THEME visualised *

A picture says more than 1.000 words

2711th Sept 2014, Varna (BG)

I. WHY

Lack of activities in the eco innovation field

Insufficient support enviroment

Small number of eco innovative SME’s

Not appropriate funding for eco innovation

2811th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

Establishment of Bionics Cluster

Target groups:

- Educational institutions in the field of Bionics

- Local SME’s

2911th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

Discussed best practice examples regarding

establishment of Cluster networks in the UK

3011th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

Finalizing the RIP

Evaluating the final draft of the RIP with

corresponding stakeholders

3111th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

Establishment of the Bionics Cluster

Development of 5 year long term strategy for

the Cluster Joint development of eco innovation with

different members of the Cluster Providing funds for the realization of Cluster

activities

3211th Sept 2014, Varna (BG)

* The Slovenian RIP THEME visualised *

A picture says more than 1.000 words

3311th Sept 2014, Varna (BG)

III. Eco-Stakeholder platform for eco-management & eco-innovation

Contest “eco-friendly company of the year”

byTartu Regional Energy Agency

Martin Kikas

(EE, PP 06)

11th Sept 2014, Varna (BG)

RIP themes

* The Estonian RIP THEME visualised *

A picture says more than 1.000 words

3511th Sept 2014, Varna (BG)

I. WHY

Low awareness

Low initiative on environmental friendly measures

3611th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

Contest „Eco-friendly company of the year“

To motivate companies to deal with eco-innovation and environmentally friendly measures

Recognition of good examples

3711th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

Mapping of best practices

ÖkoManagement Lower Austria + recognition ceremony

Seminar about Ökomanagement Lower-Austria program in detail and implementation of energy management and environmental management systems in Austria

3811th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

Terms and conditions of the contest are worked out

The contest is announced together with City of Tartu

Recognition event will take place on 3rd of October

3911th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

Publication of good practices sent to the award contest

Encouragement to take part on the national „Environmental friendly company“ contest and „Europen Business Award for the Environment“

Together with City of Tartu we plan to make it a yearly contest

4011th Sept 2014, Varna (BG)

* The Estonian RIP THEME visualised *

A picture says more than 1.000 words

4111th Sept 2014, Varna (BG)

III. Eco-Stakeholder platform for eco-management & eco-innovation

My eco-expertby

Regional Government of Lower Austria(RECOMMEND Lead Partner)

Benjamin Kuscher

(AT, PP 01)

11th Sept 2014, Varna (BG)

RIP themes

* The Austrian RIP THEME visualised *

A picture says more than 1.000 words

4311th Sept 2014, Varna (BG)

I. WHY

defragmentation of eco-consultancy programmes

Lack of cooperation between the institutions supporting eco-management and eco-innovation

Lack of transparent selection criteria for

eco-consultants

4411th Sept 2014, Varna (BG)

II. OUR SOLUTION (= our RIP measure)

One single selection tool for all eco-consultants

More transparent information about all eco-consultants

Awareness raising to inform about the selection tool

4511th Sept 2014, Varna (BG)

III. Inspired by RECOMMEND

e-mobility

Crowdfunding for energy

Eco-procurement

4611th Sept 2014, Varna (BG)

IV. STATUS QUO of our RIP implementation

Online tool ready

Data entered

Graphic design ready

4711th Sept 2014, Varna (BG)

V. Next steps in implementing our RIP

Awareness raising

Ongoing hosting

Pool of experts for any eco-consultancy

4811th Sept 2014, Varna (BG)

* The Austrian RIP THEME visualised *

A picture says more than 1.000 words

4911th Sept 2014, Varna (BG)

On behalf of the Lead Partner we wish all RECOMMEND partners

a successful implementation of their RIPS!

Thank you for your work & commitment

11th Sept 2014, Varna (BG)

Regional Implementation Plans