2SHQ +RXVH 3UHVHQWDWLRQ - WordPress.com · Draft Plan Presentation January 25, 2018 6:00 PM. Survey...

Post on 07-Jun-2018

213 views 0 download

Transcript of 2SHQ +RXVH 3UHVHQWDWLRQ - WordPress.com · Draft Plan Presentation January 25, 2018 6:00 PM. Survey...

downtown kingsport master plan

Agenda

Where are we in the process?ScheduleSurvey resultsFramework PlanTransportationExercise

downtown kingsport master plan

Where are we in the process?

downtown kingsport master plan

Schedule

Draft Plan PresentationJanuary 25, 2018 6:00 PM

Survey Results

downtown kingsport master plan

Who is the typical Downtown visitor?

downtown kingsport master plan

What do people do Downtown?

RESIDENTS

WORKERS

OCCASIONALVISITOR

downtown kingsport master plan

What do people want to see more of in Downtown?

RESIDENTS

WORKERS

OCCASIONALVISITOR

downtown kingsport master plan

What do people think about Downtown?

downtown kingsport master plan

What do people think about Downtown?

Renovating older Renovating older buildings will increase buildings will increase the attractiveness of attractiveness

downtown.

I love the changes in downtown. We come

so much more often. We would love for thegrowth to continue.

We need housing…but it has to be the right type

of housing.

The needs for fine The needining

eds for fine neegg and a “night diningg and a nighta

life” for young life for young professionals should rofessionals shou

be considered.

I love the old with the new. Don’t tear

down all the old stuff that makes the downtown what it is.

I think it’s important to bring new attractions to downtown that will

make people spend long periods of time

there.

I would love to see something that is a

draw for families with children.

We have no green space We have no green space that invites you to linger hat invites you to linger

for more than a few for moreminutes.

e than a few ores.s We need more minutess. We need more W

parks and recreational and recreareas.

downtown kingsport master plan

What improvements will be most appropriate?

Image Preference Survey

0 to 3 – Not Appropriate

4 to 6 – Somewhat Appropriate

7 to 10 – Very Appropriate

Adaptive ReuseVery Appropriate

Very Appropriate Very AppropriateV

Commercial/Mixed Use Infill

Very Appropriate Very AppropriateV

Renovated BuildingsSomewhat Appropriate omewhat AppropriateS

Residential Infill

Somewhat Appropriate

Residential Infill

Somewhat Appropriate

Student Housing

Somewhat Appropriate

Alley-Loaded Single Family Homes

Green Spaces

Very Appropriate

Amphitheater

Very Appropriate

Small Courtyards

Very Appropriate

Wide Sidewalks with Seating and Landscaping

Very Appropriate

Somewhat Appropriate

Buffered Bike Lanes

Somewhat Appropriate

Cycle Tracks

Framework Plan

INNOVATION DISTRICT

RESIDENTIAL SUMMARY

A

B

E

C

Building A75 units; 1.5 spaces per unit113 parking spaces

Building B: Senior Living65 units; 0.75 spaces per unit50 parking spaces

Building C: Townhomes + Flats20 units; 2 spaces per unit40 parking spaces

Building D:165 Units; 1.5 spaces per unit248 parking spaces

Building E: BreweryCurrently post office

Total Units: 325

D

downtown kingsport master plan

Mill Park Before

downtown kingsport master plan

Mill ParkAfter

Mill Park Food & Art

Theatre & the Arts

Brewery/Distillery

downtown kingsport master plan

Academic Park Before

downtown kingsport master plan

Academic Park After

Academic Park Amphitheatre

Academic Park Amphitheatre

downtown kingsport master plan

Co-working/Incubator Spaces

Maker’s Spaces

ARTS & ENTERTAINMENT DISTRICT

1

2

Movie Theatre

Deck 1

Deck 2

5 Points ParkBefore

5 Points ParkAfter

5 Points ParkLights

5 Points ParkOutdoor Dining

Mixed Use Entertainment

Theatre & the Arts

Hotel

Mixed-Use Entertainment

Residential above Commercial

Renovated Facades

Renovated Facades

Renovated Facades

WAREHOUSE DISTRICT

RESIDENTIAL SUMMARY

G

H

3

I

J

K

L

M N

Building I76 units; 1.5 spaces per unit114 parking spaces

Building J10 units; 2 spaces per unit20 parking spaces (self park)

Building K114 units

Building L25 units; 2 spaces per unit50 parking spaces (self park)

Total Units: 437

Building M28 units; 2 spaces per unit56 parking spaces (self park)

Building N24 units; 2 spaces per unit48 parking spaces (self park)

Building G148 units

Building H12 units; 2 spaces per unit24 parking spaces (self park)

Multi-Family

Artist Studio

Warehouse Park Before

Warehouse Park After

Warehouse Park Play

downtown kingsport master plan

Total Residential Summary

Innovation District: 325 dwelling units (265 under construction)

Arts & Entertainment District: Dwelling units above commercial spaces

Warehouse District:437 dwelling units

TOTAL: 762 Units

Transportation

downtown kingsport master plan

Streetscape Standards

Benches

Trash ReceptaclesLightsTree Grates

Bike Racks

Broad St. (from Main St. to Sullivan St.)EXISTING PROPOSED

Cherokee St. (from Main St. to Market St.)EXISTING PROPOSED

Shared Streets

Framework Feedback

downtown kingsport master plan

Directions

1. Please pick up a comment form and stickers.2. Pinned up are printed maps of the framework plan we

presented earlier this evening.3. Using the stickers provided, indicate what you like and

what you don’t like. You may use the stickies provided to write out additional ideas, if you wish.

= I like this. This is an appropriate land use for this area.

= I don’t like this. This is NOT an appropriate land use for this area.

Directions