Post on 07-Jun-2018
downtown kingsport master plan
Agenda
Where are we in the process?ScheduleSurvey resultsFramework PlanTransportationExercise
downtown kingsport master plan
Where are we in the process?
downtown kingsport master plan
Schedule
Draft Plan PresentationJanuary 25, 2018 6:00 PM
Survey Results
downtown kingsport master plan
Who is the typical Downtown visitor?
downtown kingsport master plan
What do people do Downtown?
RESIDENTS
WORKERS
OCCASIONALVISITOR
downtown kingsport master plan
What do people want to see more of in Downtown?
RESIDENTS
WORKERS
OCCASIONALVISITOR
downtown kingsport master plan
What do people think about Downtown?
downtown kingsport master plan
What do people think about Downtown?
Renovating older Renovating older buildings will increase buildings will increase the attractiveness of attractiveness
downtown.
I love the changes in downtown. We come
so much more often. We would love for thegrowth to continue.
We need housing…but it has to be the right type
of housing.
The needs for fine The needining
eds for fine neegg and a “night diningg and a nighta
life” for young life for young professionals should rofessionals shou
be considered.
I love the old with the new. Don’t tear
down all the old stuff that makes the downtown what it is.
I think it’s important to bring new attractions to downtown that will
make people spend long periods of time
there.
I would love to see something that is a
draw for families with children.
We have no green space We have no green space that invites you to linger hat invites you to linger
for more than a few for moreminutes.
e than a few ores.s We need more minutess. We need more W
parks and recreational and recreareas.
downtown kingsport master plan
What improvements will be most appropriate?
Image Preference Survey
0 to 3 – Not Appropriate
4 to 6 – Somewhat Appropriate
7 to 10 – Very Appropriate
Adaptive ReuseVery Appropriate
Very Appropriate Very AppropriateV
Commercial/Mixed Use Infill
Very Appropriate Very AppropriateV
Renovated BuildingsSomewhat Appropriate omewhat AppropriateS
Residential Infill
Somewhat Appropriate
Residential Infill
Somewhat Appropriate
Student Housing
Somewhat Appropriate
Alley-Loaded Single Family Homes
Green Spaces
Very Appropriate
Amphitheater
Very Appropriate
Small Courtyards
Very Appropriate
Wide Sidewalks with Seating and Landscaping
Very Appropriate
Somewhat Appropriate
Buffered Bike Lanes
Somewhat Appropriate
Cycle Tracks
Framework Plan
INNOVATION DISTRICT
RESIDENTIAL SUMMARY
A
B
E
C
Building A75 units; 1.5 spaces per unit113 parking spaces
Building B: Senior Living65 units; 0.75 spaces per unit50 parking spaces
Building C: Townhomes + Flats20 units; 2 spaces per unit40 parking spaces
Building D:165 Units; 1.5 spaces per unit248 parking spaces
Building E: BreweryCurrently post office
Total Units: 325
D
downtown kingsport master plan
Mill Park Before
downtown kingsport master plan
Mill ParkAfter
Mill Park Food & Art
Theatre & the Arts
Brewery/Distillery
downtown kingsport master plan
Academic Park Before
downtown kingsport master plan
Academic Park After
Academic Park Amphitheatre
Academic Park Amphitheatre
downtown kingsport master plan
Co-working/Incubator Spaces
Maker’s Spaces
ARTS & ENTERTAINMENT DISTRICT
1
2
Movie Theatre
Deck 1
Deck 2
5 Points ParkBefore
5 Points ParkAfter
5 Points ParkLights
5 Points ParkOutdoor Dining
Mixed Use Entertainment
Theatre & the Arts
Hotel
Mixed-Use Entertainment
Residential above Commercial
Renovated Facades
Renovated Facades
Renovated Facades
WAREHOUSE DISTRICT
RESIDENTIAL SUMMARY
G
H
3
I
J
K
L
M N
Building I76 units; 1.5 spaces per unit114 parking spaces
Building J10 units; 2 spaces per unit20 parking spaces (self park)
Building K114 units
Building L25 units; 2 spaces per unit50 parking spaces (self park)
Total Units: 437
Building M28 units; 2 spaces per unit56 parking spaces (self park)
Building N24 units; 2 spaces per unit48 parking spaces (self park)
Building G148 units
Building H12 units; 2 spaces per unit24 parking spaces (self park)
Multi-Family
Artist Studio
Warehouse Park Before
Warehouse Park After
Warehouse Park Play
downtown kingsport master plan
Total Residential Summary
Innovation District: 325 dwelling units (265 under construction)
Arts & Entertainment District: Dwelling units above commercial spaces
Warehouse District:437 dwelling units
TOTAL: 762 Units
Transportation
downtown kingsport master plan
Streetscape Standards
Benches
Trash ReceptaclesLightsTree Grates
Bike Racks
Broad St. (from Main St. to Sullivan St.)EXISTING PROPOSED
Cherokee St. (from Main St. to Market St.)EXISTING PROPOSED
Shared Streets
Framework Feedback
downtown kingsport master plan
Directions
1. Please pick up a comment form and stickers.2. Pinned up are printed maps of the framework plan we
presented earlier this evening.3. Using the stickers provided, indicate what you like and
what you don’t like. You may use the stickies provided to write out additional ideas, if you wish.
= I like this. This is an appropriate land use for this area.
= I don’t like this. This is NOT an appropriate land use for this area.
Directions