KULIAH PENGANTAR REKAYASA DISAINKULIAH PENGANTAR REKAYASA DISAIN
KEGIATAN EKSPLORASI, EKSPLOITASI DANEKSPLORASI, EKSPLOITASI DAN
PENGEMBANGAN LAPANGAN PANASBUMI
D I N Mi i S t djiDr. Ir. Nenny Miryani SaptadjiFIKTM - ITB
STAGES IN GEOTHERMAL EXPLORATION AND DEVELOPMENT
Geothermal LawGeothermal Law
Nenny Saptadji/TM-ITB
The developers submit Work Program (Plan of Development) and Budget to the Government.
(can be extendedUp to 20 years)
Exploitation by the developer of the work area to proceed if the feasibility study determines that a power development at the work area will be economically feasible.
To be completed 2 years fter exploration
Feasibility study is undertaken by the developers to analyze the feasibility of the working area to be developed for electricity generation, both technically and economically.
Detailed explorations, including exploration drillings, are undertaken by the developers who has been granted a geothermal mining business licenses (an IUP). B f l ti i d t d d l h t
Can be extended for two years and then for one year
Before exploration is conducted, developers have to submit Work Program and Budget.
Monitoring will be conducted by government (national, regional and/or local).
Conducted by Government, regional or local authorities.
Working area (WKP) is determined based on these surveys.
G ( / )
Nenny Saptadji/TM-ITB
The Government (national, regional and/or local) will tender working areas to registered developers. The winner of the bidders will be granted a geothermal mining business licenses (an IUP).
TAHAP 1EKSPLORASI PENDAHULUANEKSPLORASI PENDAHULUAN
(RECONNAISSANCE SURVEY)
EKSPLORASI PENDAHULUANEKSPLORASI PENDAHULUAN (RECONNAISSANCE SURVEY)
1. STUDI LITERATUR2. SURVEY LAPANGAN2. SURVEY LAPANGAN3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK4. MENENTUKAN DAERAH PROSPEK
5. SPEKULASI BESAR SUMBERDAYA
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN7. MEMBUAT LAPORAN
STUDI LITERATUR
Regional Geology ?Lokasi Daerah Manifestasi Panasbumi?Volcanic phenomena?Volcanic phenomena?Geologi & Hidrologi di daerah tersebut?Tempat-tempat yang akan disurvey?
STUDI LITERATURAda Photo udara?Ada Landsat Images?Ada Landsat Images?Lokasi Daerah Manifestasi Panasbumi?
Ada laporan hasil kajian sebelumnya?
2. SURVEY LAPANGAN
Geologi dan Hidrologidi Daerah tersebut ?
Nama Manifestasi?Lokasi?Karakteristik?Pemetaan Lokasi Manifestasi Permukaan
Nama & Jenis
Manifestasi PanasbumiManifestasi Panasbumidi Permukaan ?
ANALISA DAN INTERPRETASI DATA ANALISA DAN INTERPRETASI DATA
Geologist dan Geochemist
Analisa Kimia ? Data Geokimia
Pemetaan
ANALISA DAN INTERPRETASI DATA ANALISA DAN INTERPRETASI DATA
Geologist dan Geochemist
Interpretasi DataAnalisa Kimia ?
Pemetaan Jenis Reservoir ?
Temp Reservoir ?Temp. Reservoir ?
Sumber Air ?
Jenis Batuan Res ?
Daerah Prospek ?Daerah Prospek ?
JENIS RESERVOIR?
JENIS RESERVOIR?
JENIS RESERVOIR?
JENIS RESERVOIR?
JENIS RESERVOIR?
Umi Jigaku - Japan
Champagne Pool NZ
EKSPLORASI PENDAHULUANEKSPLORASI PENDAHULUAN (RECONNAISSANCE SURVEY)
1. STUDI LITERATUR2. SURVEY LAPANGAN2. SURVEY LAPANGAN3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK4. MENENTUKAN DAERAH PROSPEK
6.6.6. MENENTUKAN JENIS SURVEY YADMENENTUKAN JENIS SURVEY YADMENENTUKAN JENIS SURVEY YAD
777 MEMBUAT LAPORANMEMBUAT LAPORANMEMBUAT LAPORAN7.7.7. MEMBUAT LAPORANMEMBUAT LAPORANMEMBUAT LAPORAN
EKSPLORASI PENDAHULUANEKSPLORASI PENDAHULUAN (RECONNAISSANCE SURVEY)
1. STUDI LITERATUR2. SURVEY LAPANGAN2. SURVEY LAPANGAN3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK4. MENENTUKAN DAERAH PROSPEK
5. SPEKULASI BESAR SUMBERDAYA
6.6.6. MENENTUKAN JENIS SURVEY YADMENENTUKAN JENIS SURVEY YADMENENTUKAN JENIS SURVEY YAD
777 MEMBUAT LAPORANMEMBUAT LAPORANMEMBUAT LAPORAN7.7.7. MEMBUAT LAPORANMEMBUAT LAPORANMEMBUAT LAPORAN
EKSPLORASI PENDAHULUANEKSPLORASI PENDAHULUAN (RECONNAISSANCE SURVEY)
1. STUDI LITERATUR2. SURVEY LAPANGAN2. SURVEY LAPANGAN3. ANALISA DATA
4 MENENTUKAN DAERAH PROSPEK4. MENENTUKAN DAERAH PROSPEK
5. SPEKULASI BESAR SUMBERDAYA
6. MENENTUKAN JENIS SURVEY YAD
7 MEMBUAT LAPORAN7. MEMBUAT LAPORAN
EKSPLORASI LANJUTEKSPLORASI LANJUT (EKSPLORASI RINCI)
SURVEY GEOLOGI
SURVEY GEOKIMIA
SURVEY GEOFISIKA
SURVEY GEOGRAFI
Survey Geologi
Mendapatkan informasi yang lebih baik mengenai geologi permukaan dan bawah permukaan
Survey Geokimia
SURVEY GEOFISIKA
ANALISIS DANINTERPRETASI DATAINTERPRETASI DATA
Memperkirakan daerah yang "diduga" p y g gmengandung sumberdaya panasbumi
Struktur batuan ?Penyebaran batuan ?Jenis reservoir?Jenis reservoir?Temperatur reservoir?Sumber panas ?P t i b d ?Potensi sumberdaya ?
SURVEY GEOGRAFI
Status Lahan Distribusi kemiringanglereng
Hutan Lindung ?Tanah Penduduk ?
Luas Area ?Hutan Sekunder ?Perkebunan ?
Luas Area ?Sering Longsor ?
SURVEY GEOGRAFIJarak ? Waktu Tempuh ?
Curah Hujan ?
Dari Kota Terdekat ?Dari Pemukiman
Curah Hujan ?Peresapan Air ?Sering Banjir ?
Penduduk Terdekat ?
Fasilitas ?
Air ? Listrik ? Pasar ? Komunikasi ?
SURVEY GEOGRAFIPrasarana Jalan ?
Perlu Pelebaran Jalan ?Perlu Pengerasan ?
Perlu Perbaikan Jembatan ? Penduduk ?
Jumlah dan kepadatan ?Jumlah dan kepadatan ?Mata Pencharian Pokok ?Tenaga Kerja Potensial ?
Pendidikan ?Pendidikan ?Kelembagaan ?
PEMBORAN SUMUR EKSPLORASI
Geologists Engineers
AnalisaCutting
MemborSumur
Mengontrol lumpur/fluida pemboran
Cutting Sumur
p
Memasang casing
Cementing
CoringCoring
Loss of circulation ?
Pengukuran P dan T
Evaluasi Data
SUMUR Eksplorasi diKamojang (Sumur KMJ-3)
PENGUKURAN &PENG N
Water loss test
PENGUJIAN SUMUR
Gross permeability testHeating measurementsDischarge/output testDischarge/output testTransient test
Lahendong
SETELAH PENGUJIAN SUMUR ?
SETELAH PENGUJIAN SUMUR
Jenis dan sifat fluida Jenis dan sifat fluidaproduksi ?
Kedalaman reservoir ? Jenis reservoir ? Temperatur reservoir ? Temperatur reservoir ? Sifat batuan reservoir ? Laju aliran massa &
enthalpy fluida dari sumurproduksi ?produksi ?
Kapasitas produksi dalamMW ?
Apakah lapangan tersebut secara teknis danekonomis menarik untuk dikembangkan ?ekonomis menarik untuk dikembangkan ?
EVA LUA SI Data Geologi Data H idrologi Data H drolog Data Geokim ia Data Fisika
D t S Data Sum urO BUAT MODEL SISTIM PANASBUMI
(CONCEPTUAL MODEL)
( ON E U L MODEL)O POTENSI SUMBER DAYA PANASBUMI ?O JUMLAH ENERGI YANG DAPAT
DIMANFAATKAN ?O POTENSI SUMUR-SUMUR YANG
MENGHASILKAN FLUIDA PANASBUMI ?
BILA POTENSI SUMUR TINGGI
Ada permintaan energi ?
Tidak Ya
Untuk apa ? Listrik ?
NonLi t ik ?
Berapab k ?Tidak Ya
Untuk sementarawaktu
Apakah secara teknismungkin
H2S
CO
Listrik ?banyak ?
waktuditinggalkan
mungkindikembangkan CO2
Korosif ?
Tidak Ya scaling ?
BILA SECARA TEKNIS MUNGKINDIKEMBANGKAN DAN ADADIKEMBANGKAN DAN ADA
KEBUTUHAN LISTRIK
Uap kering ?
Geologists
Uap basah ?
Uap - air
EngineersJENISFLUIDA
PRODUKSI ?
KAPASITAS LISTRIK TERPASANGYANG DIUSULKAN ?
ALTERNATIF PENGEMBANGAN ?
DIAGRAM ALIR FLUIDA ?
BANYAKNYA UAPYANG DIBUTUHKAN ?
Lokasisumur ? YANG DIBUTUHKAN ?
JUMLAH SUMUR PRODUKSIYANG DIBUTUHKAN ?
JUMLAH SUMUR INJEKSIMembor sumur
lagi ?YANG DIBUTUHKAN ?
ANALISA KEEKONOMIANKEEKONOMIAN
ALTERNATIF PENGEMBANGAN ?
Alternatif1Skala kecil
Alternatif 2Skala besar
Alternatif 3Skala kecilSkala besar
Alternatif 4Lainnya ?
Biaya ?Waktu ?
Biaya ?Waktu ?
Biaya ?Waktu ?
Biaya ?Waktu ?
Ek l i ?Eksplorasi ?Eksploitasi ?
PLTP ?L i l i ?Lain - lain ?
Harga listrikalternatif 1 ?
Harga listrikalternatif 2 ? Harga listrikalternatif 3 ?
Harga listrikalternatif 4 ?alternatif 1 ? alternatif 2 ? alternatif 3 ? alternatif 4 ?
ALTERNATIF YANG PALING MENARIK ?
HULU (UPSTREAM)
HILIR(DOWN STREAM)( )
RencanaRencana pengembangan ?
Steam FieldSteam FieldPLTP
Rencana Pengembangan:
Kapasitas Pembangkit? Kapan akan dioperasikan? Jenis Pembangkit? Lokasi PLTP ?
Hatcobaru
RENCANA PENGEMBANGAN LAPANGAN UAP (STEAM FIELD)
Jumlah sumur yang harus dibor?
LAPANGAN UAP (STEAM FIELD):
Sumur produksi?Sumur injeksi?Jumlah sumur make up?
Krafla
KawerauSeparator di well site atau terpusat?
Route Pipa?Diameter Pipa ?
Condensate traps?Insulator?
I l d
Insulator?Support?
Iceland
INFRASTRUKTUR ?
Sembaloran
STATUS LAHAN?
Bacon Manito
Perlu pembebasan lahan?Perlu sewa?Dampak pengembangan terhadap lingkungan ?p g g
Darajat
PROJECT DEVELOPMENT
T i l I & P d i C Typical Investment & Production Cost of a Geothermal Power Plant (Investment cost per MW)( p )
Major challenges for Investors to Develop Geothermal Power Plants in Indonesia from legal, financial & technical aspect.
Nenny Saptadji/TM-ITB
INVESTMENT & PRODUCTION COST
STEAM FIELD POWER PLANT
INVESTMENT & PRODUCTION COST
STEAM FIELD(UPSTREAM)
POWER PLANT(DOWNSTREAM)
Nenny Saptadji/TM-ITB
COST FOR STEAM FIELD DEVELOPMENT
Exploration Cost Production Facility Costs
Well Costs
Nenny Saptadji/TM-ITB
Land, Road & Support Facilities Operation & Maintenance
Turbin & Well costs dependant on:
Re-injectionWell
Turbin & Generator Cooling
Tower
Well costs dependant on: Reservoir/Well depth Well productivities Type of reservoir Well
Steam &Water
Type of reservoir (Production Fluids)
Water or Mixture of water & steam
Number of production wells Number of make-up wells
N b f i j ti ll
Surface Facilities dependant on: Type of Fluids
P & T t
Number of injection wells
Pressure & Temperature
Number of separators
Nenny Saptadji/TM-ITB
Number of separators Length of pipelines
Well potentialTOTAL Well Costs dependant on:
Well Typedependant on:
Success RatioWell size
Well depth
Nenny Saptadji/TM-ITBStandard Well Big hole
Estimation of well costsAssumptions:
Well potentials : 5 MW/well Well size : standard well
S R ti 80%Assumptions: Success Ratio : 80% Time : 25 years
Estimation of number of wells should be drilled:
Capacity of Power Plant
(MW)
Minimum Number of
production wells
Number of Wells Should be
Available
Make up
Wells
Total Production
wels
Wells should be
Drilled30 6 7 25 32 40
55 11 12 25 37 46
60 12 13 25 38 48
110 22 23 25 48 60
200 40 41 25 66 83
220 44 45 25 70 88
Nenny Saptadji/TM-ITB
220 44 45 25 70 88
330 66 67 25 92 115
Make-up Wells
Potensi Sumur 5 MWe
1100 Laju Alir Masa Uap
1000
1050
t
o
n
/
j
a
m
)
Laju Alir Masa UapUap yang harus tersedia
950
1000
a
s
a
U
a
p
(
850
900
L
a
j
u
A
l
i
r
M
a
8001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Tahun
L
Nenny Saptadji/TM-ITB
Tahun
COST FOR POWER PLANT DEVELOPMENT
Pl f ili i
,
Plant facilities costs
++ Costs: Land Road detailed engineering construction and installation
Nenny Saptadji/TM-ITB
construction and installation civil work
Geothermal LawGeothermal Law
PRODUKSI UAP LISTRIKPRODUKSI UAP, LISTRIKMONITORING DAN EKSPANSI
Nenny Saptadji/TM-ITB
PRODUKSI UAP DAN LISTRIKOPERASI DAN MONITORINGOPERASI DAN MONITORING
PERAWATAN
P, T, FLOWRATESDAN KWALITAS UAP
CORROSION SCALING
PRODUCTIONPRODUCTIONMONITORING
SUBSIDENCEGEOCHEMISTRY
CORROSION SCALING
PLTPPL PLAINNYA
KINERJA