Post on 04-Apr-2018
7/30/2019 27ME11UP35020
1/5
7/30/2019 27ME11UP35020
2/5
MINISTRY OF ENERGYIRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
(PRIVATE JOINT STOCK)
IRAN POWER PLANT PROJECTSMANAGEMENT Co.
MAPNA
Co.
0 A B C D E F G 0 A B C D E F G
1 X 62
2 X 63
3 X 64
4 X 65
5 66
6 677 68
8 69
9 70
10 71
11 72
12 73
13 74
14 75
15 76
16 77
17 78
18 79
19 80
20 81
21 8222 83
23 84
24 85
25 86
26 87
27 88
28 89
29 90
30 91
31 92
32 93
33 94
34 95
35 9636 97
37 98
38 99
39 100
40 101
41 102
42 103
43 104
44 105
45 106
46 107
47 108
48 109
49 110
50 11151 112
52 113
53 114
54 115
55 116
56 117
57 118
58 119
59 120
60 121
61 122
DATA SHEET OF SERVICE WATER PUMPS Sheet 1/2
TEP
Doc. No.: MP-SVG-41ME-11-UPZ-002 Rev. 0
Contract No.: File No.: 27ME11UP35020
NAPEECSE Code: MF Code: Page 2 of 5
7/30/2019 27ME11UP35020
3/5
MINISTRY OF ENERGYIRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
(PRIVATE JOINT STOCK)
IRAN POWER PLANT PROJECTSMANAGEMENT Co.
MAPNA
Co.
NOTE: Information to be completed by : ___ PurchaserManufacturer
Service: Service WaterPumps
Pump Mfr. ........................Type: ........................No. Stages: ........................
Applicable to : ___ Proposals __ Purchase ___ As Built......................................Site: Shirvan Gas Turbine Power Plant
Unit : Service Water Pump Rev/Date/By :0 / 16 May 05/ S.M.T.No. Pumps Required / Stand-by: 2 / 1 No. Motor Driven: 2
Pump Item No. 60GAA50-AP001, 002Motor Item No. 60GAA50-AP001, 002Motor Provided By: Pump ManufacturerMotor Mounted By: .....................
LIQUID OPERATING CONDITION SITE CONDITIONSName: Service WaterPumpPumping Temp. (C):Normal: 15Max: 42 Min: 2Density @ 42 C
(kg/m3): 991Vapor Pressure @ 42 C
(barabs):0.08334
Viscosity @ 42 C (cp):0.63
Capacity (m3/h):Normal: 15
Rated: 15Discharge Pressure (barg)
3.86
Suction Pressure (barg):Normal: 0.04 Max:
0.46Diff. Pressure (bar): 3.40Diff. Head (m): 35NPSH Available (m): 9.4Hydraulic Power (kw):
1.42
Temperature*1 (C): Max. + 42.3Min. - 30Relative Humidity (%)Ave. 56% Max. 88% Min. 23%Altitude (m): 1115
Indoor Heated ___ Roof
___ Outdoor ___ Unheated___ Sun
Other: ........Remarks: ........
Remarks: ........PERFORMANCE TO BE COMPLETED BY MANUFACTURER
Proposal Curve No. ........Speed (rev/ min) ........Efficiency (%) ........Rated Power (KW) ........
Flow Rate: (m3/h): ....Max. Head Rated Imp.(m): ....Max. Power Rated Imp.(KW): ....
NPSH Required (m.w.c) @ 3% HeadDrop (Note 2):
............
Suction Specific Speed ........Remarks ........Construction to be completed by purchaser and manufacturer)Nozzles Size Rating Faci
ngLocation Misc.
Conn.Size Location
Suction ........ ........ ........
........ Drain ........ ........
Discharge ........ ........ ........
........ Vent ........ ........
Bal Drum ........ ........ .......
.
........ Press.
Gauge
........ ........
........ ........ ........
........ Warm up ........ ........
Casing Mount :Centerline FootNear Centerline BracketVertical InlineVertical Barrel Sump
Impeller Diameter (mm)Rated Max. Min.Rotation (Viewed from CPLG):
CW
CCWImpeller Mount:
Between BearingsOverhang
Bearing (Type/No.)Radial: ........Thrust: ........Lubrication Type: ........
Grease Ring Oil OilMist
Flood FlingerPressure
Casing Split :Axial Radial
Packing:Manufacturer: ........
Coupling:Manufacturer: ........
TEP
Doc. No.: MP-SVG-41ME-11-UPZ-002 Rev. 0
Contract No.: File No.: 27ME11UP35020
NAPEECSE Code: MF Code: Page 3 of 5
7/30/2019 27ME11UP35020
4/5
MINISTRY OF ENERGYIRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
(PRIVATE JOINT STOCK)
IRAN POWER PLANT PROJECTSMANAGEMENT Co.
MAPNA
Co.
Casing Type:Diffuser Single VoluteStaggered Double Volute
Max. Allowable Pressure (Kpa)@ 15 C .....@ Normal Pumping Temp......
Hydro Test Pressure (Note 3)(kpa) .....
Type: ........Size / No. Rings ........ /
........Mechanical Seal
API Class Code:.......
Manufacture: .......Model: .......Manufacturer Code: .......
Type: Semi-FlexibleCouplingFlexible Model: ........Diver Half Coupling Mounted by: Pump Mfr __ DriverMfr __ PurchaseGland Type / Mat: ........ / ........
... No. req'dGland Plate Taps Required:__ Quench __ Flush __Drain __ Vent
Remarks:1. The ambient temperature considered for selecting the motor KW rating shall be 42.3 C.2. NPSH req. at any capacity Shall be at least 1 meter less than the NPSH available.3. the pump casing shall be hydrostatically tested to a minimum of 1.5 times the maximum pump
working pressure which shall include the maximum suction pressure as specified in this datasheet.
CENTRIFUGAL PUMP DATA SHEET Sheet 2/2MATERIALS TO BE COMPLETED BY PURCHASER AND MANUFACTURER
Table .............. Class...........
Barrel/Case ..............Impeller ..............Shaft ..............
Shaft Sleeve: ..............Wear Rings: ..............
Base Plate: ...........
MOTOR DRIVER (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)
....... Calculated KW*1 ........
r/minFrame: .......Volts/Phase/Hertz 400 10% / 3/ 50
Type: Squirrel CageInduction Motor
Enclosure:IP44
Temp. Rise (C) Class BFull Load AMPS ............Locked Rotor*2 ............Insulation: Class FManufacturer: ............
Bearing ...........Lube ...........
MASSES ( TO BE COMPLETED BY MANUFACTURER)
Mass of Pump: (kg) ...........Mass of Base Plate: (kg) ...........Mass of Motor (kg) ...........
Mass of Gear (kg) ...........Total Mass (kg) ...........
Mass of Pump (kg): ...........Mass of Base Plate (kg):
...........
Mass of Turbine (kg): ...........Mass of Gear (kg): ...........Total Mass (kg): ...........
Remarks:.................................
Remarks:1: Motor power rating shall be selected as follows:
15% margin on pump input power at rated continuous or 5% margin on maximum pump inputpower throughout the range of operation, whichever is higher.
2: The locked rotor current shall not exceed 6xfull load current.3: The first coupled critical speed must be at least 20% higher than the maximum operatingspeed.4: Noise level from equipment shall not exceed 85dBA at a distance of 1 m from equipment.
TEP
Doc. No.: MP-SVG-41ME-11-UPZ-002 Rev. 0
Contract No.: File No.: 27ME11UP35020
NAPEECSE Code: MF Code: Page 4 of 5
7/30/2019 27ME11UP35020
5/5
MINISTRY OF ENERGYIRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
(PRIVATE JOINT STOCK)
IRAN POWER PLANT PROJECTSMANAGEMENT Co.
MAPNA
Co.
TEP
Doc. No.: MP-SVG-41ME-11-UPZ-002 Rev. 0
Contract No.: File No.: 27ME11UP35020
NAPEECSE Code: MF Code: Page 5 of 5