2030 Long Range Plan Amendment 6

Post on 10-Mar-2016

212 views 0 download

description

The Plan is the long-range, comprehensive transportation-planning document for the three-state, eight-county Greater Cincinnati region. It defines the overarching goals for transportation in our region, establishes existing and future transportation needs of the region and allocates projected revenue to transportation programs and projects that address those needs.

Transcript of 2030 Long Range Plan Amendment 6

Amendment 6 – February 2011

OKI 2030 Regional Transportation Plan

Latest cost estimates

Revised Fiscal Constraint

Updated Air Quality Analysis Years

Latest Cost Estimates

Brent Spence BridgeRevised down from $2.9 billion to $2.27 billion

Thru the Valley (I-75 from Paddock to I-275)

Revised up +$243.8 million

Year of Expenditure Costs (YOE)

Based on most current sale dates

Revised Fiscal Constraint

• Incorporate updated project costs

• Revisited revenue forecasts

Historical data provided by states

Annual Growth 4% vs 1%

• Reviewed Year of Expenditure Cost

Rate of inflation 3.5% vs 4%

Updated Air Quality Analysis Years

• Reflect the current project development time frame

Based on new sale date information from project sponsors

Attendant YOE modifications

$0

$500,000,000

$1,000,000,000

$1,500,000,000

$2,000,000,000

$2,500,000,000

$3,000,000,000

$3,500,000,000

$4,000,000,000

A B C D E F G

Ohio

Fiscal Constraint

Revenue

Cost

Fiscal Constraint

$0

$500,000,000

$1,000,000,000

$1,500,000,000

$2,000,000,000

$2,500,000,000

$3,000,000,000

A B C D E

Kentucky

RevenueCost

Fiscal Constraint

$0

$20,000,000

$40,000,000

$60,000,000

$80,000,000

$100,000,000

$120,000,000

$140,000,000

$160,000,000

$180,000,000

$200,000,000

A B C

Indiana

Revenue

Cost

Next Steps

• OKI Approval– ICC 2/8/11

– Public Hearing 2/8/11

– OKI Executive Committee 2/10/11

• States Comment

• FHWA Concurs and writes AQ conformity determination