PRECINCT 3 3 1/4 Mile Rd. & N. Bentsen Palm Dr.$80,434 Regrade of roadside ditch and installation of driveway culverts along North Bentsen Palm Dr., approximately 3,500 ft. North of Buddy Owens Blvd (Mile 3).
PRECINCT 3 3 3/4 Mile Rd. & Shuerbach Rd.$2,235,749 Construction of a drainage ditch and roadway culvert crossing extending from East N. Schuerbach Rd. to East Los Ebanos Rd. into Linda Vista drainage ditch.
PRECINCT 3 4 1/2 Mile Rd. & N. Doffing Rd.$950,974 Construction of a drainage ditch with culvert crossings between N. Doffing Rd. and N. Minnesota Rd. running south to north from Mile 4 into West Main Drain III.
PRECINCT 3 4 Mile Rd. & Minnesota Rd.$259,531 Regrade of roadside ditch and storm drainage system running North along Doffing Rd. and through proposed easements to outfall into a proposed drain ditch and ultimately into Linda Vista drain.
PRECINCT 35 1/2 Mile Rd. & N. Bentsen Palm Dr.$80,434 Proposed construction of drainage swales, regrading of roadside ditches and installation of roadway culverts along N. Betsen Palm Dr. to accommodate excess runoff from low areas.
PRECINCT 37 1/2 Mile Rd. & Glasscock Rd.$354,375 Proposed storm drainage system along existing roadway ROW connecting to a future TxDOT system.
PRECINCT 3 7 1/2 Mile Rd. & Western Rd.$340,938 Construction of a drainage ditch, roadway culvert crossings and storm drainage system to increase additional detention volume to the existing J-08 drainage ditch.
PRECINCT 1Anaquitas$7,670,000 Channel and culvert improvements to the Anaquita Drain ditch from Business 83 south to the Arroyo. Channel and culvert improvements are also recommended upstream of this drain, starting at Baseline Road and South James Drive in Mercedes.
PRECINCT 1Delta Regional Reservoir$10,000,000 Construction of a 200+ acre off-line detention pond near Mile 17 North and Uncle Peters Road to mitigate flooding up and downstream of the Main Floodwater Channel Drain.
PRECINCT 1East Mercedes$6,495,192 Channel and culvert improvements to the drainage ditches located in the vicinity of FM 2556, extending from north of Expressway 83 south to the Arroyo.
PRECINCT 4Faysville Drain$6,902,445 Project consists of the extension of a drainage ditch that was created to provide an outfall for US 281/I-69C, the Community of Faysville and surrounding areas. Faysville Drain will ultimately outfall into the proposed Raymondville Drain.
PRECINCT 1FM 493 & Country Road$1,305,000 New storm drainage system for the neighborhoods located between South River Road and surrounding the Chaparral Drain.
PRECINCT 2Hidalgo Drain$1,500,000 Upgrade existing culvert structures, cleaning, regarding, and widening of the existing ditch to increase linear detention and positive flow to the outfall at the Mission Inlet.
PRECINCT 1Highway 281 & FM 88$1,452,000 Proposed storm water pump station located near Ranchitos de Progreso subdivision at the intersection of FM88 & Highway 281.
PRECINCT 4 J-08 Drain$7,032,968 The project consists of improving the existing J-08 drainage ditch by acquiring new right of way, regrading, widening and creating a maintenance bench.
PRECINCT 2 Jackson Rd. Drain$3,618,750Channel and culvert widening of the drainage system, including the addition of a culvert crossing. The project will also create gated structures and portable pump staging area that will provide continual discharge into the Mission Inlet to relieve area flooding.
PRECINCT 2 Las Milpas$1,922,500 Drainage system and culvert improvements will include the widening of drain ditches leading up to the outfall points at the South Lateral Drain, which will relieve the area of flooding.
PRECINCT 1 Malone Drive & Pomelo Road$609,000 New storm drainage system for the neighborhood northeast of Pomelo Road and Malone Drive.
PRECINCT 1 Mid Valley Airport$7,615,920 Channel and culvert improvements to the drainage ditch network for the area. New storm drainage system and detention ponds for Joe Stephens Avenue and the neighborhood east of the airport to relieve area flooding.
PRECINCT 1 Mile 10 N & Baseline Road$1,899,136Channel and culvert improvements to the major drainage ditch south of the neighborhood area. New storm drainage system for the neighborhood and a detention pond on the south to relieve from area flooding.
HIDALGO COUNTY DRAINAGE DISTRICT NO. 12018 DRAINAGE BOND PROGRAM
The proposed countywide projects would positively affect more than 69,000 structures in Hidalgo County, helping to protect more than $5.5 billion in assessed property values.
EARLY VOTING: OCTOBER 22 - NOVEMBER 2 • ELECTION DAY: TUESDAY, NOVEMBER 6
1
2
3
4
6
7
8
9
10
11
12
13
16
17
18
19
20
14
155
PRECINCT 1Mile 10 N & Mile 1 W$4,482,168 Channel and culvert improvements to the major drainage ditch for the area. New storm drainage system with associated detention ponds for two residential areas along Mile 11 N.
PRECINCT 1 Mile 11 N & FM 1015$14,722,192 Channel and culvert improvements to the drainage ditch network for the area. Four new regional detention ponds to relieve area from flooding.
PRECINCT 1 $10,628,888 Mile 11 N & Texas BoulevardChannel and culvert improvements to the drainage ditch network for the area. New storm drainage system along Beto Garcia, Tahiti and Samoa Drive and four detention ponds to relieve area flooding.
PRECINCT 1 Mile 9 N & FM 1015$10,645,208 Channel and culvert improvements to the drainage ditch network for the area, including the extension of an existing drainage ditch. New storm drainage system and associated detention ponds for Las Brisas, Chapa subdivisions and Onyx Drive neighborhoods.
PRECINCT 2Mission-McAllen Rado Alternate$7,181,250 Culvert and channel improvements will include a culvert along Colbath Ave and Taylor Rd Right-of-Way and a new outfall ditch at the Mission Inlet drain ditch.
PRECINCT 3 Mission Lateral$12,779,500 Proposed widening, culvert crossing and detention facilities to increase linear detention and functionality of existing Mission Lateral drainage ditch.
PRECINCT 3Monte Cristo Rd. & Conway Rd.$7,392,016 Addition of detention facilities, culvert crossings and cleaning improvements of existing drainage ditch.
PRECINCT 1 Old La Blanca & Mile 10 N$496,000 New storm drainage system along De Los Rios Avenue and Encino Drive.
PRECINCT 3 PD-Lateral$4,586,474 Construction of a drainage ditch with roadway crossings to outfall into existing Penitas drainage ditch.
PRECINCT 3Penitas Drain$5,393,595 Extension of Penitas Drain consisting of a construction of a drainage ditch with roadway crossings.
PRECINCT 2 Pharr-McAllen Drain$891,250 New storm drainage system and culvert improvements will include the addition of culverts at the Irrigation Canal and Ridge Rd crossings to increase capacity.
PRECINCT 4 Raymondville Drain$15,000,000 Project consists of a new drainage ditch connecting to existing channels. Existing channels will be improvements to the approximate 63-mile drainage system of in-line and off-line detention, reservoirs, and control structures that stretches from Edinburg Lake (Hidalgo Co.) to the Laguna Madre (Willacy Co.).
PRECINCT 2South “I” Road Detention$4,408,000 New detention facilities to mitigate flooding and store potentially damaging floodwaters temporarily until the channels can safely carry the water away.
PRECINCT 2 South Lateral Drain$13,350,000 Widening of the channel to expedite drain flow, and the addition of detention facilities at the upstream end connecting to the Main Floodway.
PRECINCT 1 Southwest Weslaco$10,504,952 Channel and culvert improvements to the drainage ditch network for the area. New regional storm drainage detention ponds and sump detention ponds with pumping stations at the Floodway.
PRECINCT 4 Sunflower Drain$1,132,727 Purchase additional right of way. Construct a proposed drain ditch. Upgrade existing connection to South Main Drain. Upgrade from existing culvert crossing underneath State Highway 107.
PRECINCT 3Western Rd & 9 Mile Line$80,434 Regrade of roadside ditch and installation of driveway culverts along North Abram Rd. to alleviate flooding issues.
DISTRICTWIDECapital Acquisition of In-House Machinery and Equipment$4,000,000Purchase of in-house machinery and equipment to be used for maintenance and operations
ST241
ST336
ST107
ST433
ST336
ST336
ST107
ST107
ST336
ST107 ST107
ST107
£¤83
£¤281
£¤83
£¤83
£¤281
£¤281
£¤281
£¤83
£¤281
£¤83
£¤281
£¤83
2D9A
J-01
-04
Mont
e Ch
risto
Elsa
-Edcouch DrainFM 6
81 O
utfa
ll
East L
a teral
Pueb
lo
de Palmas Drain
Z-00-0 0
J-09
J-08-00
Sout
hM
erce
des
L ate
r al
LJ
Goo
dwin
Drai
n
Palmview Lateral Extension
El Ro cio Drain
South Alamo Drain
Jack
son
Drai
n
Lateral 34
Weslaco Dra in
J-14-00
San
Juan
Late
ral
PSJA
South Drain
M onte CristoDrain
M ade r oLa
tera
l
LindaVis ta Drain
M ission Inlet Bypass
L-0 2-01
EdinburgStu b
Wes
tM a in Drain
II
Hida
lgo
Drai
n
Pharr-McAllen Lateral
South Main Drain II
Lull
Drai
n
J-0 2-00
Alam
oEx
pres
swayDr
ain
Pharr/McAllen Sout h Drain
Ra
do Alte
rnat
e Alam
o La
tera
l
J-09-00
PSJA
Lat
eral
Perezv i lleDrain Do
nna
North
Late
ral
Mission Lateral
NorthM
ain
Drain II
Nort hMain D rain I
SouthD
onnaD
r ain
Wes
laco
Nor
th L
ater
al
North
Ma
in Drain III
Mercedes Lateral
Wes
tMain Drain III
South Lateral Drain
Mission Inlet
South Mai
nDr
ain
I
Mai
n Fl
oodw
ater
Cha
nnel
SHAR
Y
23RD
TAYL
OR
MIL
E 2
RIO
BEE
F
STEW
ART
MIL
E 6
BUSINESS 83
WAR
E
BRYA
N
FRO
NTAG
E
MILE 10
FM 4
91
MO
N M
ACK
BENT
SEN
PALM
CESA
R CH
AVEZ
BENITO A RAMIREZ
MIL
E 1
COMA
JACK
SON
RICHARDSON
FRONTAGE
FM 4
93
FM 4
92
MILE 11
MONTE CRISTO
NOLANA
HIGHWAY107
MCC
OLL
SUG
AR
FM1015
VETE
RANS
MILE 17
MO
ORE
FIEL
D
LA H
OM
A
MILE 17 1/2
FM 8
8
CAGE
WAL
LACE
RAMSEYER
BENT
SEN
MID
WAY
FM88
6
BENT
SEN
GLAS
SCO
CK
IH 2
MAY
BERR
Y
FRONTAGE
ALAM
O
CLO
SNER
IH 2
SCHUNIOR
MARCEDONIO
SUNF
LOW
ER
CONW
AY
RAUL
LO
NGO
RIA
MILITARY
CONW
AY
LOS
EBAN
OS
BUSINESS HIGHWAY 83
MILE 4
GLA
SSCO
CK
MILE 2
TOW
ER
MAI
N
HUTT
O
STEW
ART
HIGHWAY 186
MILITARY
MILE 8
MILE 3
FM 8
8
MILITARY
VAL
VERD
E
HOLL
AND
IH 6
9C
FM 2812
MONTE CRISTO
CANTON
MILE 7
CHAPIN
KENY
ON
TRENTON
29TH
SIOUX
CURRYMAIN
TEXA
S
10TH
INGLE
PECANMAY
BERR
Y
WISCONSIN
MINNESOTA
FREDDY GONZALEZ
HIGHWAY 281
PALMA VISTA
MILE 16
SPRAGUE
CANT
U
MAI
N
ROOSEVELTMILE 12
HIGHWAY 107
29TH
VALL
EY V
IEW
MILE 4
UNIVERSITY
ROGERS MIL
E 3
IH 2
ELDORA
FM 8
8
GRIFFIN
ALBERTA
MILE 11
MILE 17 1/2
MILE 15
MILE 25
MILE 17
DAVIS
VETERANS
MIL
E 4
1/2
MIL
E 5
1/2
MILE 15 1/2
MILE 17
COL
ROW
E
TEXAS
STATE HIGHWAY 107
FM 1
015
CAGE
TOW
ER
MILE 3
FM 495
VETE
RANS
MIN
NESO
TA
MILE 8
MILE 9
MILE 5
ROGERS
MIL
E 4
23RD
MILE 12 1/2
MILE 7
HIGHWAY 83
MIL
E 6
1/2
INSP
IRAT
ION
LOOP 374
MILE 9
TRO
SPER
ELDORA
MIL
E 3
1/2
IOW
A
STEW
ART
FM 1921
MILE 5
RED I RANCH
MILE 19
HIGHWAY 281
MILE 13
FM 4
91WAR
E
MILE 4
BUSINESS 83
MIL
E 2
1/2
MIL
E 4
MILE 6
M
1ST
18TH
FM 494
BICE
NTEN
NIAL
FM 2812
FM 1
015
MILE 6
SIOUX
ALTO
N
MILE 14
VALD
EZCEM
ETER
Y
MIL
E 5
1/2
CESA
R CH
AVEZ
JUAN BALLI
FM 1422
MILE 13
SKIN
NER
MIL
E 1
IOWA
MILE 20
FM 490
FM14
25
MILE 9
ISRAEL CAVAZOS
CHAP
A
CURVE
MILE 14
FM 6
81
JARA
CHI
NAS
BRUS
HLIN
E
DOO
LITT
LE
FRONTAGE
MILE 13 1/2
MIL
E 2
HOLLYLUPINE
SHAR
Y
VALDEZ
DILL
ON
MILE 8
MILE 6
10TH
BUCY
EMMA ROSS
MAC
NORM
AN G
ROVE
VAL
VERD
E
MARINA
MILE 19
MILE 11
MILE 3
MILE 12
JESU
S FL
ORES
FM49
3
MILE 4
TOW
ER
MIL
E 2MILE 31/2
OLD MILITARY
MILE 21
MIL
E 1
1/2
UNCL
E PE
TERS
MILE 14
MILE 13
MILE 14
83RD
FM 4
91
INTE
RNAT
IONA
L
MIL
E 1
EXPR
ESSW
AY28
1
ROW
LAND
MILE 9
MILE 13
MILE 11
MILE 12
FM 2629
MILE 14 1/2
MILITARY
MILE 3
JASM
AN
NITTLER
6TH
MILE 9 1/2
MILE 22 1/2
12TH
TAM
EZVI
LLE
MDA
VILA
SR
SALA
ZAR
TROPPY
MILE 10
DURBIN
FM 8
8
MARS NURSERY
MIL
E 5
MARINA
MILE 20
DAVI
LA
ENG
ELM
AN G
ARDE
NS
GARCIA
MIL
E 3
1/2
SHAR
P
GUER
RA
HWY 281
MIL
E 1
1/2
LA MULA
MILE 10
A
LAM
O
ANDERSON
JARITAS
JAC
KSO
N
COO
LIDG
E
MILE 17
FM 2
058
11TH
COUNTY ROAD 3301
HOEH
N
MIL
E 7
LILAC
QUAIL
MILE 16
MILE 18
MILE 3
BRYA
N
BRYA
N
FM 490
FM 490
FM 490
28
18
24
12
21
1 23
6
22
19
54
27
37
25 31
20
17
29
30
7
11
14
35
23
16
9
34
15
8
Legend2018 Bond Projects
Detention Areas
Existing Drainage System
HCDD1 Boundary
Precinct 1
Precinct 2
Precinct 3
Precinct 4
32
36
µ
10
26
13
33
21
3622
25
34
32
35
33
37
38
26
30
31
27
28
29
23
24
Projects are listed in no particular order of priority and can be commenced simultane-ously depending upon readiness of project
as funding becomes available under this program. Project scope and location are estimates based on information currently