Current:  18 Blockages Per Day Impacts:  MIC Trucks  Senior Center  Developmental Disabilities Center  Baseball for Youth Problem/Issue Blocked Crossing Events Per Day Event Description# BlockagesTime Arriving/Departing train from Kansas City minutes Arriving/Departing train to North Baltimore minutes Arriving/Departing local lumber & auto minutes Arriving/Departing train to St Louis minutes Switching maneuvers for trains above minutes

Transcript of 2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager...

2015 TRAC PresentationMarion 3-OH-9 Intermodal

ODOT District SixBrian Davidson

Project ManagerPlanning & Engineering

TRAC Request:• Tier 2• $1.5 M Detailed Design• $1.5 M Right-of-Way

Marion 3-OH-9 Intermodal

Current: 18 Blockages Per Day

Impacts: MIC Trucks Senior Center Developmental

Disabilities Center Baseball for Youth

Problem/Issue

Blocked Crossing Events Per Day

Event Description#

Blockages

Time

Arriving/Departing train from Kansas City 2 10-15

minutesArriving/Departing train to North Baltimore 2

10-15 minutes

Arriving/Departing local lumber & auto 2

10-15 minutes

Arriving/Departing train to St Louis 2

10-15 minutes

Switching maneuvers for trains above 10

10-15 minutes

1940’S TODAY

Intermodal Site History

New Railroad Overpass

Current configuration

Proposed Improvement

FREIGHT CORRIDORS

Development

MIC Freight • 2011 - 40,340 Containers• 2012 - 44,671 Containers• 2013 - 46,866 Containers• 2014 - 53,821 Containers• 2015 - 70,000 Containers• 2016 - 90,000 Containers expected

Budget & Funding

Construction Cost Reduced by $4M

Phase Estimated CostPreliminary Engineering $ 0.8 MDetailed Design $ 1.5 MR/W $ 1.5 MConstruction $ 8 MTOTAL $ 11.8 M

Marion 3-OH-9 Intermodal

TRAC Request:• Tier 2• $1.5 M Detailed Design• $1.5 M Right-of-Way