Post on 19-Jan-2018
description
2015 TRAC PresentationMarion 3-OH-9 Intermodal
ODOT District SixBrian Davidson
Project ManagerPlanning & Engineering
TRAC Request:• Tier 2• $1.5 M Detailed Design• $1.5 M Right-of-Way
Marion 3-OH-9 Intermodal
Current: 18 Blockages Per Day
Impacts: MIC Trucks Senior Center Developmental
Disabilities Center Baseball for Youth
Problem/Issue
Blocked Crossing Events Per Day
Event Description#
Blockages
Time
Arriving/Departing train from Kansas City 2 10-15
minutesArriving/Departing train to North Baltimore 2
10-15 minutes
Arriving/Departing local lumber & auto 2
10-15 minutes
Arriving/Departing train to St Louis 2
10-15 minutes
Switching maneuvers for trains above 10
10-15 minutes
1940’S TODAY
Intermodal Site History
New Railroad Overpass
Current configuration
Proposed Improvement
FREIGHT CORRIDORS
Development
MIC Freight • 2011 - 40,340 Containers• 2012 - 44,671 Containers• 2013 - 46,866 Containers• 2014 - 53,821 Containers• 2015 - 70,000 Containers• 2016 - 90,000 Containers expected
Budget & Funding
Construction Cost Reduced by $4M
Phase Estimated CostPreliminary Engineering $ 0.8 MDetailed Design $ 1.5 MR/W $ 1.5 MConstruction $ 8 MTOTAL $ 11.8 M
Marion 3-OH-9 Intermodal
TRAC Request:• Tier 2• $1.5 M Detailed Design• $1.5 M Right-of-Way