2014 PDX Bicycle & Pedestrian Plan - popcdn.azureedge.net · 2014 PDX Bicycle & Pedestrian Plan...

Post on 01-Jun-2020

6 views 0 download

Transcript of 2014 PDX Bicycle & Pedestrian Plan - popcdn.azureedge.net · 2014 PDX Bicycle & Pedestrian Plan...

1

2014 PDX Bicycle & Pedestrian Plan October 21, 2015

Jason Gately Long Range Planning

2

Presentation Overview 1997-2014: A Review The 2014 Plan: Highlights Q&A

Key Takeaway: The Port has been doing bicycle and pedestrian planning at PDX for almost 20 years. We have accomplished a lot, but we still need to plan for the future.

3

Bicycle and Pedestrian Planning at PDX – Why?

Increases Transportation Options Consistent with State, Regional & Local

Priorities Facilitates Sustainability Goals It’s Part of Our Brand Opportunity for Stakeholder Engagement

GUIDING PRINCIPLES

4

1997-2014: Planning Highlights 1997 Alternative Modes Study 1999-2001 Cascade Station and Airport MAX 2003 Bicycle & Pedestrian Plan 2006 & 2010 Policy Makers Ride 2008 Bicycle Transportation Alliance (BTA)

Award 2010 Airport Futures Media

GUIDING PRINCIPLES

5

1997-2014: PDX Bicycle and Pedestrian Capital Improvements

2000 • Cascade Station

Infrastructure 2001 • Airport MAX • Mt. Hood Overpass • Airport Way/82nd Intersection

GUIDING PRINCIPLES

6

7

1997-2014: PDX Bicycle and Pedestrian Improvements

2006 • Multi-Use Path to Terminal • Secure Employee Bike

Parking Area • Additional Public Parking • Frontage Rd Improvements • 82nd Ave Improvements 2007 • Marine Dr. Connection &

Crossing

GUIDING PRINCIPLES

8

1997-2014: Projects 2010 • Bicycle Assembly Station &

Signage • Indoor Bike Parking,

Lockers & Showers for Port staff

2011 • Added Bike & Ped Section

to Airport Website 2013-14 • PDX Bicycle & Pedestrian

Plan Update

GUIDING PRINCIPLES

9

2014 PDX Bicycle and Pedestrian Plan Advisory Group

• Jennifer Campos, City of

Vancouver • Roger Geller, City of

Portland • Jessica Horning, ODOT • John Landolfe, OHSU

• John Mermin, Metro • Jeff Owen, Tri-Met • Ian Stude, Portland State

University

10

11

12

13

Alderwood Rd.

Columbia Blvd

Cully at Columbia

14

Terminal Multi-use Path

15

16

17

Follow on Activities Facility Enhancements

• Add Parking at Airport Terminal

• Improve/Add Way Finding Signage

• Improve Connections to NE Portland

• Finish Path to Mt. Hood MAX Station

• Complete Path in PIC • Consider Airport Employee

Locker Room

18

Follow on Activities Programs

• Meet Annually with Port Police

• Periodic Surveying of Airport Employees

• Enhance Airport Employee Outreach

• Explore Incentive Programs

• Periodic Report out to PDX CAC

• Explore “Bicycle Related Concessions Opportunities.”

• Explore Transportation Management Association for PDX