Post on 28-Dec-2015
description
GENERAL ELECTRIC COMPANYGAS TURBINE
Greenville, SCGE Energy
-
0 [0]
0 [0]
R E V D E S C R I P T I O N D A T E A P P R O V E D
R E V I S I O N S
SIZE
UNLESS OTHERWISE SPECIFIED
SCALE SHEET
DWG NOCAGE CODE
D I M E N S I O N S A R E I N I N C H E S
TOLERANCES ON:2 PL DECIMALS 3 PL DECIMALS ANGLES FRACTIONS
DI
ST
R
TO
SIZE DWG NO SH REV
SIZ
ED
WG
NO
SH
RE
V
S I G N A T U R E S D A T E
SIM TO:
D R A W N
CHECKED
E N G R G
ISSUED
T H I R D A N G L E P R O J E C T I O N
0 [0]
0 [0]
0 [0]
DIAGRAM,SCHEM PP-LIQ FUEL
REVISE ON CAD ONLYNX PART: 104T4691
104T4691
104T
4691
104T4691
FIRST MADE FOR 367A6724G002 0424
NONE 1 OF 3
1
1
A
A
SEE PLM
SEE PLM
FORMAT_WIZARD 3.0.1
C COPYRIGHT 2012 GE ENERGY (USA), LLC AND/OR ITS AFFILIATES.
ALL RIGHTS RESERVED. THE INFORMATION CONTAINED HEREIN IS GEENERGY GAS TURBINE PROPRIETARY TECHNICAL INFORMATION THATBELONGS TO THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR THEIR AFFILIATES, WHICH HAS BEEN PROVIDED SOLELY FORTHE EXPRESS REASON OF RESTRICTED PRIVATE USE. ALL PERSONS,FIRMS, OR CORPORATIONS WHO RECEIVE SUCH INFORMATION SHALL BEDEEMED BY THE ACT OF THEIR RECEIVING THE SAME TO HAVE AGREEDTO MAKE NO DUPLICATION, OR OTHER DISCLOSURE, OR USE WHATSOEVERFOR ANY, OR ALL SUCH INFORMATION EXCEPT AS EXPRESSLY AUTHORIZEDIN WRITING BY THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR ITS AFFILIATES. 123E5977
THIS DOCUMENT SHALL BE REVISEDIN ITS ENTIRETY. ALL SHEETS OFTHIS DOCUMENT ARE THE NSAMEREVISION LEVEL AS INDICATED.
GE CLASS II (INTERNAL NON-CRITICAL)
--- -
NOTES:
1. SEE DEVICE SUMMARY MLI 0414 FOR DEVICE SETTINGS AND RATINGS.
2. THE REQUIREMENTS IN THE SYSTEM AND COMPONENT CLEANLINESS SPECIFICATION INCLUDED IN 362A2412 APPLY.
3. THE TERM "OTHERS" USED ON THIS DRAWING IS DEFINED AS THE PLANT DESIGNER AND/OR PLANT INSTALLER.
4. THIS PC MUST BE CONNECTED TO AN UN PRESSURIZED VESSEL AND MUST REMAIN OPEN.
5. VALVE IN THE CROSSOVER FILL LINE MUST BE OPEN TO EQUALIZE THE PRESSURE IN BOTH FILTERS PRIOR TO OPERATING THE FILTER TRANSFER VALVE.
6. REFER TO LIQUID FUEL LEAK TEST AND BLOWDOWN PROCEDURE INCLUDED IN 361A5550.
7. LIQUID FUEL SYSTEM RATED FOR LIGHT DISTILLATE SERVICE AS GIVEN IN LIQUID FUEL SPECIFICATION INCLUDED IN GEI-41047.
8. ISOLATION VALVE IN INTERCONNECT PIPING TO LF1 MUST BE SUPPLIED BY OTHERS. LOCATE VALVE IN OPEN AREA NEAR MODULE FOR FIRE FIGHTER USE.
9. FOR THIS MODULE SPILL DRAIN, TRAP AND ISOLATION VALVE TO AN UNPRESSURIZED VESSEL MUST BE SUPPLIED BY OTHERS.
10. A DRAIN LINE DEDICATED EXCLUSIVELY TO THIS INTERFACE CONNECTION IS REQUIRED.
LIST OF COMPLEMENTARY DOCUMENTSIT. NOMENCLATURE IDENT
EDUARDO NAJERA 12-06-15
ROHIT SHARMA
SYM, PP1
12-06-15
372A3671
INTERFACEPOINTNAME
SHEET&ZONE
SH 2 E8
SH 2 D8
SH 3 D8
SH 3 D5
SH 2 E2
SH 3 G4
SH 3 D4
FLUIDTYPE
LIQUIDFUEL
LIQUIDFUEL
LIQUIDFUEL
LIQUIDFUEL
LIQUIDFUEL
LIQUIDFUEL
MINIMUMPRESSURE
PSIG [KPAG]
52.5 [362]
0 [0]
52.5 [362]
52.5 [362]
LIQUIDFUEL
LF1
LF9
LF69
LF82A TOLF82R
LF80A TOLF80R
LF81A TOLF81R
LF79A TOLF79R
MINIMUMTEMPERATURE
F [ C]
30 [-1]
30 [-1]
30 [-1]
30 [-1]
30 [-1]
30 [-1]
30 [-1]
MINIMUMFLOW
USGPM [LPM]
65 [448]
150 [1030]
30 [207]
1200 [8270]
1200 [8270]
1200 [8270]
1200 [8270]
16 [61]
0.88 [3.33]
0.88 [3.33]
MAXIMUMPRESSURE
PSIG [KPAG]
MAXIMUMTEMPERATURE
F [ C]
120 [49]
120 [49]
120 [49]
120 [49]
120 [49]
120 [49]
120 [49]
MAXIMUMFLOW
USGPM [LPM]
390 [1480]
5 [19]
16 [60.6]
21.7 [82]
21.7 [82]
0.88 [3.33]
0.88 [3.33]
DESIGNPRESSURE
PSIG [KPAG]
200 [1380]
200 [1380]
150 [1030]
1200 [8270]
1200 [8270]
1200 [8270]
1200 [8270]
DESIGNTEMPERATURE
F [ C]
200 [93]
200 [93]
200 [93]
200 [93]
200 [93]
200 [93]
200 [93]
DESIGNFLOW
USGPM [LPM]
390 [1480]
5 [19]
27 [102]
21.7 [82]
21.7 [82]
1.5 [5.7]
1.5 [5.7]
LIQUID FUEL SUPPLY TO NOZZLES
LIQUID FUEL SUPPLY TO NOZZLES
CONNECTION DESCRIPTION
FUEL OIL INLET
WASTE FUEL OIL DRAIN
LIQUID FUEL RECIRCULATIONTO FUEL MANAGEMENT SPOOL
LIQUID FUEL RECIRCULATION
LIQUID FUEL RECIRCULATION
INTERFACE TYPE
GEE-OTHERS
GEE-OTHERS
GEE-OTHERS
GEE-GEE
0 [0]
11. DURING LIQUID FUEL OPERATION, PRESSURE OSCILLATIONS MUST NOT EXCEED 10 PSIG [68.9 KPAG] IN 10 SECONDS AT STARTUP AND 8 PSIG [55.2 KPAG] PER MINUTE AFTER IGNITION.
12. 3 WAY PURGE VALVE LOCATED IN PURGE SYSTEM MLI 0477 IS SHOWN IN THE NORMAL (UN-ACTUATED) POSITION. HOWEVER, VALUES SHOWN IN LINE LFC-1 THROUGH 18 REPRESENT CONDITIONS DURING LIQUID FUEL OPERATION WHERE THE VALVE IS IN THE ACTUATED POSITION.
13. INSTRUMENT AIR TO BE SUPPLIED BY OTHERS, MUST BE IN ACCORDANCE WITH GEK 110727. AIR SUPPLY REQUIRED TO BE SUPPLIED PRIOR TO STARTUP OF TURBINE. DESIGN FLOW IS 0.04 PPS [0.02 KGS] 10 SECONDS TRANSIENT AND 0.01 PPS [0.006 KGS] STEADY STATE. MINIMUM PRESSURE IS 90 PSIG [620 KPAG].
14. UPSTREAM OF VALVE VA70-5 THE DESIGN PRESSURE IS 1200 PSIG [8270 KPAG] DOWNSTREAM OF VALVE VA70-5 THE DESIGN PRESSURE IS 200 PSIG [1380 KPAG].
15. PRESSURE DROP IN INTERCONNECT PIPE BETWEEN LF69 AND FMS5 MUST NOT EXCEED 2.5 PSIG [17.2 KPAG] AT THE DESIGN FLOW RATE. THE PRESSURE DROP FROM LF69 TO THE FUEL OIL TANK MUST NOT EXCEED 25 PSIG [172 KPAG]. ATMOSPHERIC TANK AND BOOSTER PUMP MUST BE INSTALLED BY OTHERS TO MEET PRESSURE DROP REQUIREMENTS.
16. ALL CROSSHATCHED AREAS TO BE DISABLED/REMOVED.
INTERFACEPOINTNAME
H07
LF17
LF63
LINE LFC-1TO 18
LF76
LF77
LF78
LINE LFD-2-1 TO 2-18
LINE OLT-3
LINE OL-20
SHEET&ZONE
SH 2 B4
SH 3 B4
SH 2 B6
SH 3 C3
SH 3 G4
SH 3 D2
SH 3 H4
SH 3 C4
SH 2 C4
SH 2 C5
FLUIDTYPE
OIL
LIQUID FUEL/AIR/WATER
LIQUID FUEL/OIL/COOLANT
LIQUID FUEL/AIR
AIR/WATER/LIQUID FUEL
AIR/WATER/LIQUID FUEL
LIQUID FUEL/AIR
OIL/AIR
OIL
OIL
NORMALPRESSURE
PSIG [KPAG]
1630 [11200]
600 [4140]
100 [690]
NORMALTEMPERATURE
F [ C]
130 [54]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]
130 [54]
130 [54]
NORMALFLOW
USGPM [LPM]
1.0 [3.8]
1.0 [3.8]
19 [72]
DESIGNPRESSURE
PSIG [KPAG]
1840 [12700]
150 [1030]
150 [1030]
150 [1030]
150 [1030]
150 [1030]
150 [1030]
1200 [8270]
200 [1380]
2 [13.8]
DESIGNTEMPERATURE
F [ C]
175 [79]
175 [79]
175 [79]
200 [93] OIL250 [121] AIR
200 [93] OIL250 [121] AIR
200 [93]
200 [93]
200 [93]
200 [93]
200 [93]
DESIGNFLOW
USGPM [LPM]
3.0 [11.4]
3 [11.4]
0.5 [1.89]
0.5 [1.89]
0.5 [1.89]
27 [102]
21.7 [82]
1 [3.8]
1 [3.8]
2.0 [7.6]
LIQUID FUEL RECIRCULATION VENT PRESSURE
CONNECTION DESCRIPTION
HYDRAULIC OIL SUPPLY
FUEL DISTRIBUTION VALVE LEAKOFF DRAIN
LIQUID FUEL/ATOMIZING AIR MODULE (A162)BASE FLOOR DRAIN
LIQUID FUEL SUPPLY TO NOZZLES(SEE NOTE 14)
AIR VENT FROM LIQUID FUEL RECIRCULATION
AIR VENT FROM LIQUID FUEL RECIRCULATION
LIQUID FUEL DRAIN
TRIP OIL TO LIQUID FUEL VALVES
LF HYDRAULIC OIL RETURN
INTERFACE TYPE
GEE-OTHERS
GEE-GEE
GEE-OTHERS
GEE-GEE
GEE-GEE
GEE-GEE
GEE-GEE
GEE-GEE
GEE-GEE
GEE-GEE
INTERFACEPOINTNAME
LF70
LF71
LINE IA-4
SHEET&ZONE
FLUIDTYPE
NORMALPRESSURE
PSIG [KPAG]
NORMALTEMPERATURE
F [ C]
SH 3 G4
SH 3 G4
SH 2 G3
AIR
AIR
AIR
105 [724]
105 [724]
105 [724]
30 TO 120[-1 TO 49]
30 TO 120[-1 TO 49]30 TO 120[-1 TO 49]
NORMALFLOW
PPS [KG/S]
DESIGNPRESSURE
PSIG [KPAG]
DESIGNTEMPERATURE
F [ C]
DESIGNFLOW
PPS [KG/S]
120 [827]
120 [827]
120 [827]
150 [66]
150 [66]
150 [66]
0.04 [0.02]
0.04 [0.02]
0.04 [0.02] INSTRUMENT AIR FROM LF/AA PURGE
INSTRUMENT AIR TO VA70-6
INSTRUMENT AIR TO VA70-5
CONNECTION DESCRIPTION INTERFACE TYPE
GEE-OTHERS
GEE-OTHERS
GEE-GEE
0 [0]
0 [0]
0 [0]
GEE-GEE
GEE-GEE
GEE-GEE
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
0 [0]
A
REVISED THIS SHEET
1) CHANGED NOTE 13
DINA MUSE
2012-09-14 SEEPLM
A1
DWG Number 104T4691 Rev A Released 10/15/2012
GE Proprietary Information - Class II (Internal) US EAR - NLR
GE Energy
GENERAL ELECTRIC COMPANYGAS TURBINES
Greenville, SC
R E V D E S C R I P T I O N D A T E A P P R O V E D
R E V I S I O N S
DI
ST
R
TO
SIZE DWG NO SH REV
SIZ
ED
WG
NO
SH
RE
V
SIZE
D R A W N
ISSUED SCALE SHEET
DWG NOCAGE CODE
104T4691
104T
4691
104T4691
NONE 2 OF 3
2
2
A
A
SEE PLM
FORMAT_WIZARD 3.0.1
C COPYRIGHT 2012 GE ENERGY (USA), LLC AND/OR ITS AFFILIATES.
ALL RIGHTS RESERVED. THE INFORMATION CONTAINED HEREIN IS GEENERGY GAS TURBINE PROPRIETARY TECHNICAL INFORMATION THATBELONGS TO THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR THEIR AFFILIATES, WHICH HAS BEEN PROVIDED SOLELY FORTHE EXPRESS REASON OF RESTRICTED PRIVATE USE. ALL PERSONS,FIRMS, OR CORPORATIONS WHO RECEIVE SUCH INFORMATION SHALL BEDEEMED BY THE ACT OF THEIR RECEIVING THE SAME TO HAVE AGREEDTO MAKE NO DUPLICATION, OR OTHER DISCLOSURE, OR USE WHATSOEVERFOR ANY, OR ALL SUCH INFORMATION EXCEPT AS EXPRESSLY AUTHORIZEDIN WRITING BY THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR ITS AFFILIATES.
EDUARDO NAJERA 12-06-15
OUT
PS
NO
ET-88FP1-1A/RET-88FP1-1B/RET-88FP1-2A/RET-88FP1-2B/RET-88FP1-3A/RET-88FP1-3B/RET-88FP1-4A/RET-88FP1-4B/R
DL-27 DL-49 AL-84A AL-85A ASW-42AAL-84B AL-85B ASW-42BAL-84C AL-85C
FRO
M M
LI
4038
FU
EL
MA
NA
GE
ME
NT
SP
OO
L P
IEC
E,
"FM
S3
"
TO LIQUID FUELWASTE DRAIN
SEENOTE 5
NC2
D
IN
IN
OUT
OUT
BP
P
OUT
1
R
IN
IN
BP
NCNC
HIGHPOINTVENT
NC
NCNC
NC
HIGHPOINTVENT
FILTERDRAIN
PDS63LF-5
PDILF-5
NO
PS63FL-2
NO
NO
0-25 PSID[0-172 KPAD]
PIFL-2
0-200 PSIG(0-1380 KPAG)
M
FUEL PUMPSEAL
LEAKOFF
FH3-1
VM5-1
FF1-1VR41-1
FF1-2VR41-2
PF1-1
HI PINDICATOR
VC3-1
LF1
LF9
SEE NOTE 8 & 11
SEE NOTE 4 & 10
VR4-1
VH4-1
OUT
PS
65FP-1
OUT
PS
FH4-1
HI PINDICATOR
VS1-1
TO A
ND
FRO
M M
LI
0418
TR
IP O
IL S
YS
TE
M, "T
O12"
OLT
-3
TO SHEET 3ZONE D-6, "LINE LFO-1"
LFO-1
LFO-2
LFO-3
LFO-4
LFO-5
LFO-6
LFO-7
LFO-8
LFO-9
LFO-10
LFO-11
LFO-12
LFO-13
LFO-14
FD1-1
77FD-177FD-277FD-3
NO
0 TO 1500 PSIG[0 TO 10300 KPAG]
S
VA70-1PT
96LFSP-1CNO
PT96LFSP-1B
NO
PT96LFSP-1A
NO
SG
20LFSP-1
VCK6-1
VH17-1NO
88FP-123FP-1
NONO NC
BYPASS
TO SHEET 3ZONE D-6, "LINE LFO-2"
TO SHEET 3ZONE D-6, "LINE LFO-3"
TO SHEET 3ZONE C-6, "LINE LFO-4"
TO SHEET 3ZONE C-6, "LINE LFO-5"
TO SHEET 3ZONE C-6, "LINE LFO-6"
TO SHEET 3ZONE C-6, "LINE LFO-7"
TO SHEET 3ZONE C-6, "LINE LFO-8"
TO SHEET 3ZONE C-6, "LINE LFO-9"
TO SHEET 3ZONE C-6, "LINE LFO-10"
TO SHEET 3ZONE B-6, "LINE LFO-11"
TO SHEET 3ZONE B-6, "LINE LFO-12"
TO SHEET 3ZONE B-6, "LINE LFO-13"
TO SHEET 3ZONE B-6, "LINE LFO-14"
TO C
US
TOM
ER
DR
AIN
TA
NK
LF63
SEE NOTE 9
REVISE ON CAD ONLYNX PART: 104T4691
0511
VCK6-7
ET-88FP1-5A/RET-88FP1-5B/R
0510
PT96LFSP-2A
PT96LFSP-2B
PT96LFSP-2C
IA-4
0.7 [18 MM]ORIFICE
VCK6-2
VALVEPACKINGLEAKOFF
0516
VCK6-3
TO M
LI
0416
LUB
E O
IL,
"LIN
E O
L-2
0"
OL-20
20FL-1
ZS33FL-1
PIFL-3
0.126[3,2 MM]ORIFICE
1082
NC
HIGHPOINTVENT
FROM MLI 0477, LF/AAPURGE, "LINE IA-4"
SG
FRO
M M
LI
04
34
HYD
RAU
LIC O
IL S
UP
PLY
, "H
O1
"
HO7
TO SHEET 3ZONE B-6, "LINE LFO-15"
LFO-15
TO SHEET 3ZONE B-6, "LINE LFO-16"
LFO-16
TO SHEET 3ZONE B-6, "LINE LFO-17"
LFO-17
TO SHEET 3ZONE B-6, "LINE LFO-18"
LFO-18
0613
LF81A TO LF81R
LIQUID FUEL/ATOMIZING (LF/AA MODULE A162
HIGHPOINTVENT
NC
PIFL-4
0 TO 1500 PSIG[0 TO 10300 KPAG]
TYPICAL18 PLACES
SEE NOTE 16
REVISION LEVEL UPDATEDONLY NO CHANGEA
DINA MUSE
2012-09-14 SEEPLM
GE CLASS II (INTERNAL NON-CRITICAL)
DWG Number 104T4691 Rev A Released 10/15/2012
GE Proprietary Information - Class II (Internal) US EAR - NLR
GE Energy
GENERAL ELECTRIC COMPANYGAS TURBINES
Greenville, SC
R E V I S I O N S
DI
ST
R
TO
SIZE DWG NO SH REV
SIZ
ED
WG
NO
SH
RE
V
SIZE
D R A W N
ISSUED SCALE SHEET
DWG NOCAGE CODE
NONE 3 OF 3
3
3
A
A
SEE PLM
FORMAT_WIZARD 3.0.1
C COPYRIGHT 2012 GE ENERGY (USA), LLC AND/OR ITS AFFILIATES.
ALL RIGHTS RESERVED. THE INFORMATION CONTAINED HEREIN IS GEENERGY GAS TURBINE PROPRIETARY TECHNICAL INFORMATION THATBELONGS TO THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR THEIR AFFILIATES, WHICH HAS BEEN PROVIDED SOLELY FORTHE EXPRESS REASON OF RESTRICTED PRIVATE USE. ALL PERSONS,FIRMS, OR CORPORATIONS WHO RECEIVE SUCH INFORMATION SHALL BEDEEMED BY THE ACT OF THEIR RECEIVING THE SAME TO HAVE AGREEDTO MAKE NO DUPLICATION, OR OTHER DISCLOSURE, OR USE WHATSOEVERFOR ANY, OR ALL SUCH INFORMATION EXCEPT AS EXPRESSLY AUTHORIZEDIN WRITING BY THE GENERAL ELECTRIC COMPANY, GE ENERGY (USA), LLCAND/OR ITS AFFILIATES.
GE CLASS II (INTERNAL NON-CRITICAL)
EDUARDO NAJERA 12-06-15
96LF-10
104T
4691
104T4691
REVISE ON CAD ONLYNX PART: 104T4691
104T4691
FROM SHEET 2ZONE D-1, "LINE LFO-10"
FROM SHEET 2ZONE E-1, "LINE LFO-1"
FROM SHEET 2ZONE D-1, "LINE LFO-2"
FROM SHEET 2ZONE D-1, "LINE LFO-3"
FROM SHEET 2ZONE D-1, "LINE LFO-4"
FROM SHEET 2ZONE D-1, "LINE LFO-5"
FROM SHEET 2ZONE D-1, "LINE LFO-6"
FROM SHEET 2ZONE D-1, "LINE LFO-7"
FROM SHEET 2ZONE D-1, "LINE LFO-8"
FROM SHEET 2ZONE D-1, "LINE LFO-9"
FROM SHEET 2ZONE C-1, "LINE LFO-11"
FROM SHEET 2ZONE C-1, "LINE LFO-12"
FROM SHEET 2ZONE C-1, "LINE LFO-13"
FROM SHEET 2ZONE C-1, "LINE LFO-14"
FROM SHEET 2ZONE C-1, "LINE LFO-15"
FROM SHEET 2ZONE C-1, "LINE LFO-16"
FROM SHEET 2ZONE C-1, "LINE LFO-17"
FROM SHEET 2ZONE C-1, "LINE LFO-18"
LF82A TO LF82R
0961
D A T E
LFO-1
LFO-2
LFO-3
LFO-4
LFO-5
LFO-6
LFO-7
LFO-8
LFO-9
LFO-10
LFO-11
LFO-12
LFO-13
LFO-14
LFO-15
LFO-16
LFO-17
LFO-18
0961
ACTUATION AIR
PURGE AIR
D E S C R I P T I O N A P P R O V E D
0477
LF
D-2
-1 T
O 2
-1B
LFC-1 TO 18SEE NOTE 12
DISTRIBUTOR VALVE
TYPICAL FOR18COMBUSTORS
FUEL NOZZLE 0512
TYPICAL FOR18COMBUSTORS
R E V
SG
LF17
LIQUID FUEL RECIRCULATION MODULE 969S
LFRO-1
LF79A TO LF79R
9018
VCK6-4
9018
LF77
9018
0961
9018
LFD-1
TURBINE ENCLOSURE 1634
1 THRU 18 LFRI-1THRU LFRI-18
LF80ATO LF80R
INSTRUMENTAIR(BY OTHERS)SEE NOTE13
LF70
LF76
INSTRUMENTAIR(BY OTHERS)SEE NOTE13
LF71
0 TO 300 PSIG[0 TO 2070 KPAG]
PILFR-1
9018LF78
LFD-1
SEE NOTE 15
TILFR-1
0 TO 250 F[-18 TO 121 C]
FT-LR-1C FT-LR-1B FT-LR-1AVA70-5
NC
SEE NOTE 14
ZS33LF-5
S
LF69
NC
20LFSP-5
SG 0.10 [2,54 MM]
ORIFICENC
VA70-6
ZS33LF-6
VTA
S
NC
VTA
20LFSP-6
VENTSTANDPIPE
TO MLI 4038, FUEL MGMTSPOOL PIECE, "FMS5"
71LF-271LF-1
VTA
96LF-9
SEEPLMA REVISION LEVEL UPDATED
ONLY NO CHANGE 2012-09-14
DWG Number 104T4691 Rev A Released 10/15/2012
GE Proprietary Information - Class II (Internal) US EAR - NLR