Post on 17-Jan-2016
1
Commission on Restitution of Land Rights
2015/2016 First Quarter Performance Report Presentation to the Portfolio Committee on
Rural Development and Land Reform
02 September 2015
ACHIEVEMENT AGAINST 2015/16 APP TARGETS: 01 APRIL 2015 TO 30 JUNE 2015
2
Performance indicator Annual Target Quarter 1 TargetAchievement (Actual
Performance) Variance
Number of land claims settled
463 92 38 -54
Number of land claims finalised
373 74 57 -17
Number of phased projects approved
62 12 8 -4
Number of claims lodged by 1998 to be researched
2660 532 195 -337
Number of mobile lodgement offices operational
2 all-terrain (4x4) mobile lodgement offices operational
2 all-terrain (4x4) mobile lodgement offices operational
Target regarding 4x4s not achieved, 4 mobile busses
have been deployed..
Registration of vehicles in the name
of the Department was not finalised due to
registration processes required
ACHIEVEMENT AGAINST 2015/16 APP TARGETS: REASONS FOR VARIANCE AND MITIGATING PLANS
01 APRIL 2015 TO 30 JUNE 2015
3
Performance indicator Reason for Variance Mitigating Plans
Number of land claims settled - Some of the projects planned for settlement in Quarter1 we settled in Quarter4
- However, additional 25 submissions for 24 claims received before 30 June 2014, still had to go through the quality assurance process and could therefore not be routed for approval before the end of quarter-In addition, there are also 23 submission for 21 claims where only received in July 2015.
We are strengthening our project management capability so that we are able to clearly monitor our workflow so that we can plan better.
Number of land claims finalised
- Some of the projects planned to be finalised in Quarter1 we finalised in Quarter4.
The signing of distribution agreements is in the process of being decentralized to Provincial CD’s .
ACHIEVEMENT AGAINST 2015/16 APP TARGETS: REASONS FOR VARIANCE AND MITIGATING PLANS (cont.)
01 APRIL 2015 TO 30 JUNE 2015
4
Performance indicator Reason for Variance Mitigating PlansNumber of phased projects approved
- Some of the phased projects planned for approval in Quarter1 we approved in Quarter4
- However, additional submissions for 9 phased projects were received before 30 June 2014, which still had to go through the quality assurance process and could therefore not be routed for approval before the end of quarter- These submissions was earmarked for QCC dated 16 July 2015, which didn’t took place.
We are strengthening our project management capability so that we are able to clearly monitor our workflow so that we can plan better.
Number of claims lodged by 1998 to be researched
The Quarter 1 target was not achieved due to the following reasons:
- The National Research Unit (NRU) received approximately 366 reports for 519 claims- Due to the bulk of the research reports being received between 29 and 30 June 2015, the vetting process could not be completed and the reports could not be recommended for approval before 30 June 2015
The following interventions are planned:
- Complete the vetting process of the research reports received between 29 and 30 June 2015
- The NRU to conduct regular regional visits to offices dealing with complex claims (KwaZulu-Natal, Limpopo, Mpumalanga, Eastern Cape). Increase capacity in research unit.
ACHIEVEMENT AGAINST 2015/16 APP TARGETS: REASONS FOR VARIANCE AND MITIGATING PLANS (cont.)
01 APRIL 2015 TO 30 JUNE 2015
5
Performance indicator Reason for Variance Mitigating Plans
- Consequently only 198 claims were vetted and approved- Remaining 321 claims are still in the process en-route for approval-Regional offices like KwaZulu-Natal, Limpopo, Mpumalanga and Eastern Cape have complex rural claims were a large number of properties have to researched and these claims have to be outsourced
- The appointment of service provider to conduct research on complex claims have been centralised at the National Office and appointment process to be completed by 31 August 2015
Number of lodgement offices operational
4x4 all terrain vehicles in final testing before deployment. Also Registration of vehicles in the name of the Department has not been finalised.
Registration process and testing has been finalised in July 2015 and 4x4 all-terrain offices is being rolled out in provinces that require these vehicles as part of the national plan.
IMPROVEMENT PLANS FOR SETTLED, PHASED AND FINALISED CLAIMS:SUBMISSIONS CURRENTLY AT NATIONAL OFFICE TO BE PROCESSED FOR QCC
6
PROVINCIAL BREAKDOWN
PROVINCE TOTAL SUBMISSIONSNO OF CLAIMS TO BE
SETTLEDFIN COMP. LAND PURCHASE TOTAL VALUE
NEW PHASED TOTAL
EASTERN CAPE 2 2 4 2 R 10 859 970.28 R 161 343.72 R 11 021 314.00
FREE STATE 2 0 2 1 R - R 231 796.25 R 231 796.25
GAUTENG 5 0 5 5 R 2 870 574.74 R - R 2 870 574.74 KWAZULU NATAL 9 1 10 9 R 21 233 065.61 R - R 21 233 065.61
LIMPOPO 3 2 5 10 R 2 213 825.00 R 10 609 568.00 R 12 823 393.00
MPUMALANGA 1 3 4 1 R 17 973 423.00 R 10 947 654.00 R 28 921 077.00
NORTHERN CAPE 2 1 3 2 R 9 874 283.00 R 67 636 883.00 R 77 511 166.00
NORTH WEST 3 0 3 3 R 7 833 230.48 R 92 500 000.00 R 100 333 230.48
WESTERN CAPE 12 0 12 12 R 1 276 121.08 R 21 050.00 R 1 297 171.08
GRAND TOTAL 39 9 48 45 R 74 134 493.19 R 182 108 294.97 R 256 242 788.16
The under-mentioned 45 claims were received during the last three days of the quarter and is currently being processed.
RESEARCH IMPROVEMENT PLAN
7
ProvinceTotal number of research claims not yet
approved
Eastern Cape 55Free State 0Gauteng 5
KwaZulu-Natal 115
Limpopo 6Mpumalanga 43North West 2Northern Cape 7Western Cape 88
GRAND TOTAL 321
The under-mentioned 321 claims were received during the last three days of the quarter and is currently being processed.
ACHIEVEMENT AGAINST 2015/16 APP TARGETS: 01 JULY TO 31 JULY 2015 (Q2)
8
Performance indicator Annual Target Quarter 2 TargetAchievement (Actual
Performance) Variance + shortfall
in quarter 1
Number of land claims settled
463 139 24 115+54
Number of land claims finalised
373 111 69 42+17
Number of phased projects approved
62 18 6 12+4
Number of claims lodged by 1998 to be researched
2660 798 98 337+691
Number of mobile lodgement offices operational
2 all-terrain (4x4) mobile lodgement offices operational
Registration and operational
Done
FINANCE IMPROVEMENT PLAN
9
• Spending from 1 April to date: R411 million• Second tranche payments awaiting registration- R80 million• Claims settled 2015/16 balance: R47 million• Monitor of budget weekly and receiving monthly reports from
Provinces• Financial committee meetings are held monthly in each province to
discuss status of claims, identifying, bottlenecks, challenges and solutions to ensure alignment of spending to cashflow projections.
FINANCE IMPROVEMENT PLAN
10
Province BudgetExpenditure
11 August
Proposed budget after Adjustment
(Oct) % Exp
Amended cash flow projections
August September October
Eastern Cape 257 020 000 67 766 613 167 697 832 26.4% 36 926 000 6 185 000 15 300 000
Free State 107 035 000 166 155 85 313 290 0.2% 4 538 000 21 891 000 417 000
Gauteng 103 570 000 790 142 81 224 302 0.8% 5 042 000 8 174 000 2 107 000
KwaZulu Natal 381 376 000 140 575 549 219 244 895 36.9% 26 254 000 38 865 000 32 028 000
Limpopo 351 077 000 78 181 075 251 340 369 22.3% 1 230 000 26 203 000 535 000
Mpumalanga 359 980 000 35 262 176 303 162 269 9.8% 56 461 000 66 960 000 43 936 000
Northern Cape 247 120 000 65 508 056 160 056 389 26.5% 72 500 000 22 559 000 13 740 000
North West 247 120 000 65 508 056 160 056 389 26.5% 42 350 000 39 511 000 16 931 000
Western Cape 154 060 000 18 973 415 113 531 030 12.3% 1 126 000 11 408 000 18 511 000
Total 2 208 358 000 472 731 235 1 541 626 765 21.4% 246 427 000 241 756 000 143 505 000
PAYMENTS IMPLEMENTED IN JULY 2015
11
ProvinceJULY 2015
ProjectionsJULY 2015
Expenditure Varience Exp %
Eastern Cape 8 574 000 9 318 186 -744 186 108.68%
Free Sate 177 000 0 177 000 0.00%
Gauteng 33 000 118 888 -85 888 360.27%
KwaZulu Natal 39 179 000 75 003 568 -35 824 568 191.44%
Limpopo 22 919 000 32 737 545 -9 818 545 142.84%
Mpumalanga 19 673 000 20 487 173 -814 173 104.14%
Northern Cape 1 436 000 1 205 346 230 654 83.94%
North West 15 860 000 7 488 600 8 371 400 47.22%
Western Cape 8 102 000 10 797 173 -2 695 173 133.27%
TOTAL 115 953 000 157 156 479 -41 203 479 135.53%
TOTAL OPERATIONAL EXPENDITURE
12
TOTAL BUDGET EXPENDITURE COMMITMENTSAVAILABLE
BUDGET % EXPCompensation of Employees 312 321 000 92 967 145 0 219 353 855 30%Goods and Services 160 818 000 52 108 201 19 116 927 89 592 871 32%Theft and losses 0 46 921 0 -46 921 0%Municipality 8 378 000 14 957 903 0 -6 579 903 179%Social Benefits 288 000 84 104 0 203 896 29%
Capital Assets 4 857 000 1 869 241
0
873 679 38%Interest on land 0 358 651 0 -358 651 0%Total 486 662 000 162 392 166 21 231 007 303 038 826 33%
OPERATIONAL EXPENDITURE: PER PROVINCE
13
PROVINCE BUDGET EXPENDITURE COMMITMENTSAVAILABLE
BUDGET % EXP
Eastern Cape 45 389 000 12 849 893 1 610 369 30 928 738 28%
Free State 34 072 000 14 222 024 478 068 19 371 907 42%
Gauteng 49 328 000 10 754 129 1 984 304 36 589 567 22%
KwaZulu Natal 59 371 000 21 018 412 2 082 182 36 270 406 35%
Limpopo 62 195 000 16 809 350 1 414 913 43 970 737 27%
Mpumalanga 66 915 000 35 099 632 3 407 974 28 407 394 52%
Northern Cape 21 110 000 6 517 412 1 262 572 13 330 016 31%
North West 50 349 000 11 173 810 1 505 435 37 669 755 22%
Western Cape 38 630 000 12 590 362 1 024 124 25 015 514 33%
National Office 59 303 000 21 357 141 6 461 067 31 484 792 36%
Total 486 662 000 162 392 166 21 231 007 303 038 826 33%
HUMAN RESOURCE –FILLING OF VACANT POSTS
14
TOTAL STRUCTURE ESTABLISHMENT
(POSTS ON PERSAL)
FILLED POSTS VACANT POSTS ADVERTISED
POSTSUNFUNDED POSTS
1523-Total Approved -Funded & unfunded-Filled and Vacant
957-Loaded on Persal-Filled and unfilled
736-Filled posts only
221-Vacant Posts -Due to the process of Reprioritisation of post emanating from the lack of COE funds
-23% Vacancy rate
115-Includes 54 Mobile - Mobile Units posts to be loaded on persal still
397-These posts are on Structure -There are no funds for them-There are not on persal
ACCUMULATED CLAIMS RECEIVED: 1 April – 30 June2015
15
PROVINCES CLAIM S LODGED
Mpumalanga 1631
WITBANK 564
NELSPRUIT 1067
Gauteng 3030
ARCADIA: PRETORIA 3030
Northern Cape 111
KIMBERLY 111
Free State 6017
BLOEMFONTEIN 6017
Eastern Cape 1177
EAST LONDON 711
QUEENSTOWN 466
Limpopo 563
RLCC POLOKWANE 563
Western Cape 1467
GEORGE 475
CAPE TOWN 992
KwaZulu Natal 5166
VRYHEID 964
PIETERMARITZBURG 4202
North West 1575
MMABATHO 1157
VRYBURG 418
TOTAL 20737
REPORT ON NEW CLAIMS
16
• The following are communities in different areas of the country where claims were lodged on mobile lodgement offices
Gembok in the Free State Inkanyezi in the EC Maruping in Gauteng28 April – 30 May QwaQwa8 – 13 June Bethlehem15 -20 June Sasolburg22-27 June Kroonstad29-30 June Welkom
6,7 May Libode EC8,9 May Nyandeni EC12,13 May Port St Johns EC14-16 May Mtatha EC25,26 May Mqanduli EC27-29 May Flagstaff EC1-2 June Sterkspruit, EC3,4 June Aliwal North EC5 June Mt Fletcher EC8-9 Port Alfred EC10 June Grahamstown EC11,12 June Kirkwood EC22 June Kirkwood
06 – 08 May Toekomsrus09 – 11 May Dobsonville12 – 13 May Meadowlands14 – 20 May Carletonville21 – 24 May Thokoza, Alberton, Voslorus, Springs
REPORT ON NEW CLAIMS
17
Mobile lodgement offices (continued)
Maruping in the North West Mabulandila-Vulindlela in Mpumalanga
01 – 14 June Taung15 – 18 June Lichtenburg19 – 24 Klerksdorp (Joubertina)25 – 30 Klerksdorp (Alabama)
1-5 June Elukwathini8-12 June Ermelo15-19 June Piet Retief22-26 June Piet Retief
COMMUNICATION ON THE LODGEMENT CAMPAIGN:
18
1. Media liaison:•Minister, CLCC and the Provincial Chief Directors Land Restitution Support interviewed on various media platforms including:
National, Regional and community media including:-SABC TV (Morning live, News bulletins, current affairs), -SABC radio (News bulletins and current affairs programmes)-eNCA (News bulletin and current affairs programmes)-ANN7 (News bulletin and Current affairs programmes)-National and community newspapers-Local and community radio stations
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
19
2. Advertising campaign (June):Advertising campaign on national, local and community media including:
National media:a.Outside broadcast (OB): Lesedi fm (National launch in FS, April 2015).b.Radio (live-reads) on SABC radio in all the provinces, about the lodgement process (June 2015).c.Newspaper adverts on Sowetan, The New Age, and Daily Sun on the lodgement process and lodgement sites (June 2015).
Community media:a.Radio live-reads: Qwaqwa fm (April 2015)b.Mini-drama (radio) about lodgement process (June 2015).
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
20
Advertising campaign (continued):c. Radio-phone in programme: 1 hour interviews with phone-ins, explaining the lodgement process, documents required, and schedules for mobile lodgement offices (June 2015)
Advertising booked for September onwards:a.Community Billboards (Store facia in rural areas): Sept – Nov 2015
b.Wall murals (townships): Sept – Nov 2015
c.Community radio mini-drama (repeats): September 2015
d.Television Adverts (SABC, e-TV and community stations): October 2015
e.Incorporation of lodgement message into soapie story-line: Oct – Dec 2015
f.Community radio live-reads: February – March 2016
g.Newspaper adverts (repeats): February – March 2016
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
21
Community outreach (road-shows through the sprinters):Provincial community outreach conducted through the mobile communication units (sprinters) include: Distribution of Citizens’ manual; Loud-hailing at taxis, ranks, shopping centres and other public places; Information sessions; and announcements and interviews on local & community media.
Gauteng Province:•Information session with communities and Municipalities & distribution of Citizens’ manuals as follows: Merafong, Randfontein, City of Johannesburg, Ekurhuleni Metro, SALGA, Sedibeng, Blesbok and Refilwe township during the period under review.
North West Province:•Information sessions & distribution of Citizens’ manual to communities conducted with communities within the Ngaka Modiri Molema and Dr Ruth Mompati, and Dr Kenneth Kaunda District Municipalities during period under review.
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
22
Northern Cape Province:•Information session & knock-n-drop in the Mier, Kai Gariep, Kareeberg, Hantam, Khara Hais and Joe Morolong Municipality areas.
Western Cape Province:•Information sessions conducted with Stakeholders including: Knysna Municipality manager, Dept. of Local Housing, Thusong Centre, Breedevallei Municipality manager, Witzenberg MAYCO, Cross Road committee, Stellenbosch District Manager. Meetings also held with communities from Sedgefield, Covie, The Cragg, Klaarstroom, Van Wyksdorp, Zwelethu (Worcester), De Doorns, Zwelihle (Hermans), Van Huystonlaan (Worcester), Robertson, Montagu, McGregor, Franshoek (Paarl) and Hermans.
Free State Province:•Information session and distribution of Citizens’ manuals conducted with the Maluti-a-Phofung and Mafube Municipalities. Community mobilisation & distribution of Citizens’ manuals conducted in Qwaqwa, Bethlehem, Frankfort, Kroonstad, and Welkom.
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
23
KwaZulu-Natal Province:•Briefing session conducted with Ububhlebezwe Municipality, and presentations on the lodgement process conducted with communities and stakeholders in Durban, Greytown, Portshepstone, uMbumbulu, Pine Street, and Emaweleni.
Limpopo Province:•Imbizo, Community and Stakeholder briefing sessions conducted in Jane Furse, Plokwane, Thohoyandou, and Burgersfort. Information sessions conducted with communities in Musina, Polokwane (Mmaleboho Bahananwa Tribal Office), Polokwane (Oscar Mpetha Stadium, Turfloop), Ga Chokow Community Hall, Ryeland Tribal Council, Turfloop Nature Reserve, Airport Africa lodge.
Eastern Cape Province:•Information sessions conducted with communities in Sterkspruit (Bensenville Hall & Qhoboshiyane), Matatiele (Tabalong) Mt. Fletcher (Vuvu & Printsu) Ngqeleni (Mazizini Tribal Council), Libode (Makhotyana & Ama-Mpondomiseni AA), Mqanduli (Cacadu Great Place).
COMMUNICATION ON THE LODGEMENT CAMPAIGN (cont.):
24
Mpumalanga Province:•Community mobilisation conducted with communities as follows: Breyton, Lothair, Driefontein, Matsulu, Witbank, and Ntombe (Piet Retief).
THANK YOU
25