1 TOWN Of CARY

Cary Wayfinding ProgramTown Council Worksession #2

February 23, 2010

Juliet Andes, PlanningDoug McRainey, PRCR

John Bosio, Merje

2 TOWN Of CARY

AGENDA

• Refresher of Preliminary Design

• Review Open House Comments

• Design Development / Full Menu of Signs • Next Steps/Implementation

3 TOWN Of CARY

DOWNTOWN CARY CONCEPT DEVELOPMENT

4 TOWN Of CARY

PRCRWayfindingPlan

Town of CaryWayfinding

Plan

DowntownWayfindingPlan

5 TOWN Of CARY

6 TOWN Of CARY

7 TOWN Of CARY

DOWNTOWN CARY PUBLIC COMMENTS

8 TOWN Of CARY

9 TOWN Of CARY

10 TOWN Of CARY

11 TOWN Of CARY

DOWNTOWN CARY DESIGN DEVELOPMENT

12 TOWN Of CARY

13 TOWN Of CARY

14 TOWN Of CARY

15 TOWN Of CARY

16 TOWN Of CARY

17 TOWN Of CARY

18 TOWN Of CARY

19 TOWN Of CARY

20 TOWN Of CARY

21 TOWN Of CARY

22 TOWN Of CARY

Citizen Advisory Committee

• Unanimous approval of proposed downtown design

• Desire to include banners in design plan and incorporate downtown logo onto sign brackets

• Mentioned potential need to “copyright” wayfinding colors to prevent private use– Possible component of the Sign Ordinance update

23 TOWN Of CARY

• Mock-Ups / Prototypes

• NCDOT approval

• Construction Documentation

• Sign Locations / Messages

REMAINING PHASES

• Fabrication & Installation

24 TOWN Of CARY

Downtown Prototype

• Prototype fabrication– Build prototypes for use with Cary Elementary

Renovation

• Proposed signs to include: – Entrance sign– Parking sign

25 TOWN Of CARY

Preliminary Cost Estimates: Downtown

• Fabrication and installation – Full menu of signs within TCAP: $351,225– Downtown trailblazer signs outside TCAP: $76,500– Banners (75): $26,250– Town Hall campus signs: $42,000

• Currently budgeted for 2012– Potential to phase signs by type based on status of

Streetscape Implementation

26 TOWN Of CARY

Preliminary Cost Estimates: Townwide

• Completion of Design $15,000

• Fabrication and installation– Phase I (Venues - 19 Signs) $85,500– Phase II – 14 Signs $63,000– Phase III – 21 Signs $94,500

Total - $243,000

27 TOWN Of CARY

• Approval of the Design Development Package (final design approval)

• Consideration to build prototypes

• Implementation status:

• Downtown wayfinding: - currently budgeted to begin implementation in 2012

• Town-wide wayfinding

STAFF RECOMENDATIONS

28 TOWN Of CARY

Council Discussion/Direction

• Final Design Approval

• Proceed with Sign Mock-Ups (Yes/No)