1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB.

Post on 24-Dec-2015

214 views 0 download

Tags:

Transcript of 1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB.

1

Asphalt Paving Athletic Surfaces

Mike Vinton, CTCB

2

ContractorsContractors

• Breakdown in communicationBreakdown in communication• Paver PridePaver Pride• Too much prep work before Too much prep work before

surfacingsurfacing– time consumingtime consuming– expensiveexpensive

3

4

5

6

Today we are going to touch on some basic ideas for steps that we can take to prepare us for hiring and managing a skilled paving contractor.

7

HIRE A COMPETENT CONTRACTOR

• Interview Process

• Investigate the company

8

JOB SITE MEETINGSJOB SITE MEETINGS WITH PAVER WITH PAVER

►Visit Site Visit Site

►Ask QuestionsAsk Questions

9

JOB PLAN & JOB GOALSJOB PLAN & JOB GOALS

ManpowerManpower EquipmentEquipment Asphalt PlantAsphalt Plant Trucking RequirementsTrucking Requirements

1010

SUB-GRADESUB-GRADE Proper aggregate placement / prepProper aggregate placement / prep

SUB-BASESUB-BASE Issues with wet stone baseIssues with wet stone base

GRADINGGRADING CompactionCompaction

1111

1212

1313

14

ASPHALT PAVING

Asphalt Materials Paving Machine / Screed set-up Laser / Sonics Asphalt joints Low areas

15

16

17

18

19

ASPHALT ROLLING

• This can make / break a job

• Initial rolling / final rolling

• Asphalt temperatures

• Roller marks

20

21

22

2323

QUESTIONSQUESTIONS

Questions from Questions from your projects?your projects?

2424

Take the time to prepare our companies and Take the time to prepare our companies and our sub-contractors. There should be no our sub-contractors. There should be no surprises. My advice is not to assume that surprises. My advice is not to assume that ““anyone cananyone can do thisdo this”. ”.