2009-2012 VBMP Orthophotography Status

2

2009-2012 Orthophotography Contract

• Contract Awarded to Sanborn on December 23rd

• Planned Maximum Budget: $6.0 Million (2006/07 Budget)

• Statewide 1 Foot Resolution Orthophotography– Eastern Half of State Will Be Captured during 2009 and

Western Half Will Be Captured during 2011• Digital Capture • Faster Delivery

– Intermediate County Mosaics within 60 days– Final Ortho Delivery within 6 Months of Acquisition

• Delivery Will Include Color Infrared Band (4 band color)

3

2009/2011 Flight Areas

4

Pricing for Core Products

Product 2009 Price Per Tile

2007 Price Per Tile

1 Foot Orthophotos

$60.00 $115.43

6 Inch Orthophotos

$64.50 $76.90

4 Foot Contours $27.20 $36.00

2 Foot Contours $13.60 $23.11

5

2009 Contract Value• 1 Foot Base Orthophotography

– $1,484,280• Orthophotography Resolution Upgrades

– $372,780• 4 Foot Contours

– $27,690• 2 Foot Contours

– $6,718Total Value = $1,891,468

6

Imagery Acquisition

• Acquisition began on February 1st, 2009• Acquisition completed on March 31st, 2009

– 87% of photos were captured by February 25th

• 33,628 Images Acquired– 26 Terabytes of raw imagery!

2009 Upgrades

9

Additional Upgrades

• 4 Foot Contours– Halifax County

• 2 Foot Contours– Blacksburg– Charlottesville– Fredericksburg– Hopewell

• Impervious Surface– James City County

10

Raw Image SamplesPrince George (6 Inch) – February 20th, 2009

11

Raw Image SamplesPrince George (6 Inch) – February 20th, 2009

12

Raw Image SamplesMonticello (6 Inch) – February 21st, 2009

13

Raw Image SamplesMonticello (6 Inch) – February 21st, 2009

14

Image ComparisonsMonticello (6 Inch) – True Color

15

Image ComparisonsMonticello (6 Inch) – Color Infrared

16

Raw Image SamplesYork County (6 Inch) – February 21st, 2009

17

Raw Image SamplesYork County (6 Inch) – February 21st, 2009

18

Image ComparisonsIsle of Wight (1 Foot), 2002

JamesRiverBridge

19

Image ComparisonsIsle of Wight (6 Inch), 2007

JamesRiverBridge

20

Image ComparisonsIsle of Wight (1 Foot), 2009

JamesRiverBridge

21

Data Delivery• Delivery of preliminary mosaics will begin

on May 1st

– 1 foot resolution for entire 2009 flight area– No QA/QC performed on products– Orthorectified using 2006/2007 terrain models– VGIN plans to offer mapservice as primary

delivery method

• Final products delivered by September 30– 4 Band GeoTiff and JPG2000 tiles– Digital Terrain Models

22

File Sizes of Final Deliverables• Uncompressed GeoTiff

– 100 MB per tile– 2.89 TB for 2009 flight area

• Lossless JPG2000* (5:1 compression)– 20 MB per tile– 592 GB for 2009 flight area

* MrSID format does not support more than 3 bands so JPG2000 has been chosen as the delivery format