® Welcome to the Future Evolutions in CASS™ MASS™ CASS/MASS CYCLE M Discussion.

Post on 04-Jan-2016

213 views 1 download

Transcript of ® Welcome to the Future Evolutions in CASS™ MASS™ CASS/MASS CYCLE M Discussion.

®

Welcometo the

Future Evolutionsin

CASS™ MASS™

CASS/MASS CYCLE MDiscussion

AGENDA

Communication Plan Improvement

Cycle M requirement

Implementation process for new cycle requirements

Cycle Significant Milestones

CASS™ MASS™ Cycle M

Communication Plan Improvement

CASS™ MASS™ Cycle M

The USPS Certification Department will addthe following tests for 2008-2009 Cycle M:

CASS™ MASS™ Cycle M

CASS:

To validate a secondary of # 0, the match must be made to a high-rise exact record.

Software will be required to return the Preferred Alias as standard out-put.

SuiteLink (Required for Cycle M)

MASS:

Manufacturers will be required to spray the Intelligent Mail barcode for MASS testing.

SuiteLink (Required for Cycle M)

CASS™ MASS™ Cycle M

REQUIREMENT TO VALIDATE A SECONDARY OF #0

CASS™ MASS™ Cycle M

To validate a secondary of # 0, the match must be made to a high-rise exact record and a significant leading zero in the secondary before you return ‘Y’ and footnote (AABB) otherwise you must return an ‘S’ and the appropriate footnote (AACC).

You can not return a ‘Y” if you match on records with secondary of # 0 on default high-rise record or street records.

PREFERRED ALIAS

CASS™ MASS™ Cycle M

CASS software will be required to return the Preferred Alias regardless if the input address is the base or the Preferred Alias.

Example:

Input: 127 Bunker Hl (base) Output: 127 Bunker Hill (Preferred)

Boston MA 02118 Boston MA 02118

SUITELINK™

CASS™ MASS™ Cycle M

All CASS/MASS software developers will be required to certify SuiteLink™ to be made available to their end users as an optional function.

INTELLIGENT MAIL BARCODE

CASS™ MASS™ Cycle M

All MASS manufactures will be required to demonstrate their ability to spray an IM barcode in CYCLE M. Manufactures will not have to spray the POSTNET barcode for testing.

End Users, while not required to test the IM barcode will have the option to test the IM barcode in Cycle M. However if the requirement to spay the IM barcode for automated discounts is implemented by USPS during mid- Cycle, the end users will have to recertify and pay all applicable fees.

SIGNIFICANT MILESTONES

CASS™ MASS™ Cycle M

Annual Meeting . . . . . . . . . . . . . . . . . . . . . ...FEB 2007Official Rules Release . . . . . . . . . . . . . . . . . MAR 2007Stage I File Release . . . . . . . . . . . . . . . . . . .JUN 2007Stage II File Release . . . . . . . . . . . . . . . . . . AUG 2007MASS Test Decks Available . . . . . . . . . . . . .NOV 2007 Developers/Manufacturers . . . . . . . . . . . . . MAR 2008Certification CompletedBegin Software Release . . . . . . . . . . . . . . . APR 2008Target Software Released . . . . . . . . . . . . . . MAY 1, 2008to End-users